Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutR-361467m arosuste (W
=0440= =
,r
NUMBER
10
I-
B
A
eii •�'•' i�l;:es;'sd
SECTION VIEW A -A
SECTION VIEW B -B
a Asa. ts,a) m.
- oss ar aawc
B tvaetmo
PLAN VIEW SECTION VIEW C -C
A, ROCK BEHIND CURB CUT
GARDEN AVE N, STA 40 +83, RT
,ats oe�u, NT$ m a vami
vua w, v,.a I pmne m[av
aw-ror Dort x »/-
`I
951 :Sig'
SECTION
PLAN VIEW
A
• .M1
1.:x:::7 '.�7•�::;3
11:15
11
©,. , CURB CUT
GARDEN AVE N, STA 41+55 AND STA 43+85, RT
NTS
or mvsot (alt) M.
- as at ae.c
�mawm
(CDT TI6 SDR F-0}.i(:)1
SECTION VIEW C -C
GARDEN AVE WIDENEING - UTILITY ASBUILTS
UTILITY
NORTHING
STATION
OFFSET
ELEV-
DESCRIPTION
3004q
H2f)
511+2599
14.45,LT
24590
TEE 121N
NHS 61N W'
185784.765
H2O
50 +24:39
14 -62 LT
24374
WET TAP
a 121N
10708,
H2O
5932679
1094 LT
'25401
,ALVE61NTQPNIJf
DATE:
'11,,U
112
H2O
50 +26.86
21.06 LT
24224
61N DI TOP
PIPE
- 57720x1
17+60.;92
4�i.19.LT
- 81:95
12W
CMFTOP
130 92112
PIPE
STRM
17 +68:28
59.53 LT
2965
121N
CUP
30005
TOP PIPE
577204
0715E 33
79.26LT
27A4
12IKCWTOP:PIPEAP
145803:654
1302368.%6
STRM
17 *49:32
7711 LT
27.34.
121NCMP
RT
TOP PIPE
STRM
1302344.492
147462 48
19.91RT
:-
+. REPLACED .TY$�E1,SAN1EIEs..5t?LItl _ID
STRIA
18 +25
50 +45 &I
39.00ILT1
APP.
I CO NO 11 CONC INLET, H2O BELOW
GARDEN AVE WIDENEING - RAISED IRON
PT NO,
NORTHING
EASTING
DESCRIPTION
STATION
OFFSET
3004q
485752.163:1302347.62
09 13 12
=VVVLIO €50+26,79
SURVEYED: KPG
=
30001
185784.765
1302339..543
WV LID
50+.50.79
19.66 LT
3D�02
441657
10708,
1302340'01,
DRAWN BY: HJT
VV LID
VS
50+54.,24
DATE:
'11,,U
112
IT
30003
185808.195
1302334 476
M ON LID
50+7445
17,24
LT
3
18578$216
111
130 92112
33DJS
144741[1)•
DESIGN BY: HJT
50+4719
b3V098
0,10TLT
0.03
30005
185790.287
1302361684
MH COVER
50+48.58
5.01 RT
30006
145803:654
1302368.%6
18 +50
MH
COVER
50+,53.90
13:40
RT
30007
185840 665
1302344.492
MH COVER
51 +01.94
3,09 LT
30LKIB
18 895.013
5
18 +25
0
'1302459, 8
k10N LID
APP.
51 53.57
11.28
FILE: 08046PLN01.dwg
L
T
30009
185940 223
1302433 543
GAS LID
62+38.,53
2.78
RT
1011,10
1135938=635
0.003
1302135.49&
1302466 535
GAS LID
'
62 +39
5.25
RT
30011
185978.527
1302459.273
MON LID
+ 744$
52+83.63
6.11 LT
3072
1855t32:3B0
.1362249. 7-16
VF Ci3VEg '
14 +00 79
729 W
30013
1055 9,
3 052
1302205 17
MH COVER
14+60.39
3 1
d2_ar
38414
35.393
185507 ,135
1302 0.6'8
185810 059
MOO
LIO
73+81,29
0.00 'RT
30015
185572 968
1302406-816
WV LID
48+28.88
22.10 LT
3W6, I
'185563.446
1302437.811
,
MH,CO',lE1Z
9 0
+ ,
48 ,03'33
6:39117
30017
195620-93
1302397.354
364
WV 110
+
48 77 11
1532 LT
3 0
7 .581
T8W73,ev
13112396,4
3p15 T13C
VVV LID
48+aa,44
31:140
1 0.44
15:34
1835808121
LT`
300119
185622 876
130239835
VVV LID
48+78.65
13.77
LT
.30620
185653,104
F O-530
1302469;35
:MR
COVER
'
49+$3.98
607
RT
30021
185659316
13424174226
MH COVER
49+0737
15AI RT
301022
485607,614
1392401.735
VVV LIO
;
44163119
45.27LT
".
30023
185604 679
1302402 899
WV LID
48 +5994
15.07 LT
40tY24
1855135,7311
1301400,194
112 A
1W'UD
27.253
48+61.56
46-65;LT'
30025
185870.017
1302411.027
VVV LID
51+7611
42:02 PT
VS, CONNECTIONS TO EXIST
54 MAIN - CO #14
CALL 3 WORKING DAYS
HJT
DESCRIPTION
STATION
NJD
OFFSET
ELEV_
09 13 12
HORZ
DEVIATION
SURVEYED: KPG
UTS MATH DRAIN
ROCK - CO 13
w
04/01/13
3USTflc
10+95.62
44,7.3
441657
T,1073
9ti�1wnTSU
0 4o
DRAWN BY: HJT
D CONSTRUCTION RECORDS
VS
HJT
DATE:
07/2014
112
3 OIS TBC TRANS_
18 +89.62
44.80
44.152
F 0.648
0.006
185899 841
1302528 -948
44.152
111
33DJS
_ o
DESIGN BY: HJT
dS,75
b3V098
171:552
0.03
t858 346
k30r518 7?0,
$3;698
P 5506 0 0p \k
. Ix 0
CHECK BY: NJD
PROJ MGR: NJD
110
301STBC
18 +50
41-H
41323
F0637
0,.003
185871407
1302501369
41.323
;p
NA L E'
109
'4P5JST513
18 +25
REVISION DESCRIPTION
BY
APP.
DATE
OA
FILE: 08046PLN01.dwg
753 9th Ave N 2502 Jefferson Ave
Seattle, WA 98109 Tacoma, WA 98402
(206) 2861640 (253) 627 -0720
www.kpg.cnm
CONSTRUCTION NOTES
MATCH EXISTING.
(� INSTALL MONOLITHIC CURB WITH CURB JOINTS ON TOP OF NEW CEMENT
CONCRETE PAVEMENT PER ROADWAY DETAILS, SHEET 7. SEE SPECIAL
PROVISIONS.
O7 REPLACE METAL HANDRAIL WITH LIKE KIND, AS APROVED BY THE ENGINEER.
s STA 43 +90.30, 38.01' RT TO STA 44 +00.00, 36.75' RT, 10.8 LF.
• STA 43 +91.31, 44.23' RT TO STA 44+00.00, 42.80' RT, 9.3 LF.
15 INSTALL PRECAST CONCRETE DUAL FACED SLOPED MOUNTABLE CURB, PER
WSDOT STD PLAN F- 10.64 -02.
©0 CONSTRUCT CEMENT CONCRETE PAVEMENT WIDENING PER TYPICAL ROADWAY
SECTIONS, SHEET 4 AND PROVIDE SAWED TRANSVERSE JOINTS PER WSDOT
STD PLAN A- 40.10 -02.
©5 PROVIDE LONGITUDINAL AND TRANSVERSE CONSTRUCTION JOINTS PER WSDOT
STD PLAN A- 60.10 -01, EXCEPT PROVIDE THICKENED EDGE PER DETAIL,
SHEET 7.
30 CONSTRUCT PCC PAVEMENT ISOLATION JOINTS AROUND STORM STRUCTURE
PER WSDOT STD PLAN A- 40.15 -00.
GENERAL CONSTRUCTION NOTES
L,J
IJ
0
0
Q
U)
w
Z
G
z
1. INSTALL CEMENT CONCRETE CURB, GUTTER, AND SIDEWALK AND
RESTORE ROADWAY PER TYPICAL ROADWAY SECTIONS, SHEETS 4 - 5.
2. FOR ROADWAY PROFILE SEE SHEETS 18 - 20.
3. FOR SITE PREPARATION & TESC PLAN AND DETAILS, SEE SHEETS 9 -13.
4. FOR REMOVAL LIMITS, SEE SITE PREPARATION & TESC PLAN, SHEETS 9 -13.
5. FOR CHANNELIZATION & SIGNING PLAN, SEE SHEETS 33 - 36.
6. FOR ILLUMINATION PLAN AND DETAILS, SEE SHEETS 21 - 26.
7. FOR SIGNAL PLAN AND DETAILS, SEE SHEETS 27 - 30.
8. FOR IRRIGATION PLAN AND DETAILS, SEE SHEETS 37 - 42.
9. FOR LANDSCAPE PLAN AND DETAILS, SEE SHEETS 43 - 47.
10. POWER POLES AND VAULTS TO BE RELOCATED BY OTHERS.
11. GAS VALVE BOXES TO BE RELOCATED AND /OR ADJUSTED TO GRADE
BY OTHERS.
GARDEN AVE WIDENING - NE QUADRANT CURB STAKING
CALL 3 WORKING DAYS
POINT
NO
DESCRIPTION
STATION
DESIGN
ELEV.
OFFSET
ELEV_
GUT
FILL
HORZ
DEVIATION
STAKED
NORTHING
STAKED
EXSTING
STAKED
ELEV.
w
773
3USTflc
10+95.62
44,7.3
441657
T,1073
O,d01
1 041'46
, :657
DATE:
FEB 2012
112
3 OIS TBC TRANS_
18 +89.62
44.80
44.152
F 0.648
0.006
185899 841
1302528 -948
44.152
111
33DJS
TSC
18 ±75
dS,75
b3V098
171:552
0.03
t858 346
k30r518 7?0,
$3;698
110
301STBC
18 +50
41-H
41323
F0637
0,.003
185871407
1302501369
41.323
109
'4P5JST513
18 +25
40AZ5'
49;446'
10.704
11:00&
1%051475
1307431'"4
,1190446
108
3 CIS TBC
18 +0D
3831
37.706
F 0604.
0.003
185835 532
1302466 535
37706
1 #k
�
3 G*LS M
0
D: BEG
37
+ 744$
36'82
.o4B
F.D_ 72
5
0.00 5
1,88511
T916
13tl244&i5,9
1
-% ass
85
3 015 TBC
PC 17+6446
3516
35.393
F 0461
0,006
185810 059
1302441.802
35-31A
93=
3 43JSTOC
-114A
34.52
13625
613
O.00L
05803.171
1342430..6513
,
3 '625 ,
9 0
3OISTBC
112,6
33.10
1
32.49 5
F 0 805
0 3
DO
5 0
18 8 2.476
130241
7 .581
4
32. 95
91
3p15 T13C
31411
31,68
31:140
1 0.44
0:402
1835808121
1302405 764
1,33141#
92
3 CIS TBC MOD END
PCG 50+64.78
30,26
29330
F O-530
0,003
185818 733
1302398 094
29.730
93
3 CT18T6C
1J4A
28:85
28:715
F 0.136
11:{101,
fS5 (4.156
13023
#e40d1?
28.715
94
3 OIS TBC
112 A
2941
27.253
F 1.162
0.005
185849.397
1302395.138
27.258
1q5
3 t31S T c
314,4
28:73
2T.612
F "lB
o-003,
11t586Y.001
4=400-24D
27.1112
96
3 01S T13C
PT 51 +79.52
29:06
28.134
F 0926
0:006'
1858T8.002
1302449:325
28 -134
111
3118 THC
52140
23,49
120
3 OIS TBC END
52 +11.30
29,73
28.898
F 0.832
0.005
185901.133
1302430.836
28,898
121
3OtSFLRAMP?.
ID
50+41.76
NfA.
fVtA
Hdfi
RECORD
DRAWINGS
PREPARED BY KPC, JULY 2014
BASED ON CONSTRUCTION RECORDS
CITY OF RFNTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PLAN
STA 40 +00 TO STA 44 +00
k� � �, ( q 0
DRAINAGE NOTES
O SEE PROFILE SHEETS 18 -20
FOR DRAINAGE NOTES NOT
IDENTIFIED BELOW.
R- 361461
1
0
c
CALL 3 WORKING DAYS
BEFORE YOU
DIG:
E D
a_
811
z
C)
cM1 m Z
�o
-
ao
w
14
0
DRAWING NO.
m
PROJECT NO.
11156
FED AID NO.
DATE:
FEB 2012
SHEET NO.
14 OF 53
1
0
c
m
E D
a_
z
C)
cM1 m Z
�o
-
ao
w
0
m
z