HomeMy WebLinkAboutR-361472l0' VC PLANS 203.00.& 204.30 1
STA 51 +26.54, 40.61' RT
�L
(DR
n
+
STA .48 ±95.46, 36.34'
RT
25
EXISTING CB
____ 30:18__ ___
__ ___ R2___
....
_ .11..11
STA 50+61.21; 53.28' RT
30.75 _
30.02 _ _ L L L
.
+ N +
Lij
._ .
M
00
00
FLOWLINE
50 +00
II
II >
LOGAN
+N
_
...�
W ... .. N.
o+°
o
N PA
a..
28.9+ 30.3+
_. �N...
CL
a �.... a
d
19'19
28.11
40
II
II
n
PROJ MGR: PJG
+
o
M
—II
APPROVED FOR CONSTRUCTION
- 0:31% .....
DATE: FEB 2012
l0' VC PLANS 203.00.& 204.30 1
STA 51 +26.54, 40.61' RT
�L
(DR
n
+
M
pO,
25
EXISTING CB
____ 30:18__ ___
__ ___ R2___
....
_ .11..11
STA 50+61.21; 53.28' RT
30.75 _
30.02 _ _ L L L
.
+ N +
Lij
._ .
LOGAN AVE .N.......
- _ ....
SED GROUND "' —
JSTRUCTION � a
_7.00"1
EXISTING GROUND AT
CONSTRUCTION 4 LF ....
BEGIN OVERLAY U3 4 °0 PVC
20 .. STA 48 +03,23 N
21 : LE �.
8 "0 DI.
S = 0.50% ... EXISTING CB
- CONNECT .TO.....
EXISTING CB 20
10 LF, -8 "0 DI 1 ..
S = OM10 N .. 1�
EXISTING CB- - - N 16 33 LF, 8"4 DI, S = 0.50%
0' . ' "
30:6 _
.. _ . 29:6 _ _
29.1 _ EXISTING CB . _ ........ 29:2
25
EXISTING CB
____ 30:18__ ___
__ ___ R2___
o c°Di co
^
STA 50+61.21; 53.28' RT
30.75 _
30.02 _ _ L L L
.
+ N +
N
._ .
LOGAN AVE .N.......
- _ ....
R3A...
LO
FLOWLINE
50 +00
II
II >
w
=29.75
_
...�
W ... .. N.
J
a
28.9+ 30.3+
CL
a �.... a
d
19'19
28.11
CL
- CONNECT .TO.....
EXISTING CB 20
10 LF, -8 "0 DI 1 ..
S = OM10 N .. 1�
EXISTING CB- - - N 16 33 LF, 8"4 DI, S = 0.50%
0' . ' "
30:6 _
.. _ . 29:6 _ _
29.1 _ EXISTING CB . _ ........ 29:2
25
AVE N ___
____ 30:18__ ___
__ ___ R2___
.._..
_ _ _ __ _... _....
^
28 . _ .
30.75 _
30.02 _ _ L L L
29:56 A.L45 ....
29.81
AVE N
LOGAN AVE .N.......
- _ ....
R3A...
R3B.... ..... ..... _......
29.430
.......
50 +00
II
_._._. --
51 +00
..._. _.
52 +00
GARDEN AVE N / LAKE WASHINGTON BLVD N
PROFILE
HOR: 1 " =20' VER: 1 " =10
60 .
_ ....
"i It
It
60
.. ..... .....
.. -
n
^
-:: 'J_
a� CITY OF RENTON
.0
Public Works Department
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PROFILE
DRAWING NO. 19
PROJECT NO. 11156
FED AID NO.
.. ... .. :.
+
N
dn°1...
r7 ... .....
....�
ll...
.................... .... .....
.......
40 ..
II
I
>
W
40
J
d
CL
°T k:a sr80�O "wa \'v�`
PROJ MGR: PJG
I................... ...
0.48%
PREPARED BY KPG, A1LY 2014
0.68% ..
APPROVED FOR CONSTRUCTION
- 0:31% .....
DATE: FEB 2012
...... . ......
�S /oNac e��� \y0
0�1
OVERLAY. ENDS
www.kpg.com
BASED ON CDNSTRUC710N RECORDS
BY. DATE.
STA 48 +00 TO STA 55 +00
SHEET NO. 19 OF 53
.
STA, 53 ±64.11....
REVISION DESCRIPTION
20
APP.
DATE
20
1.6 29.9.....
!.....P
30..1. _ . _ . _ .......
..._...
30.5
-_
31.0
31
-TOC LT ELEV
29.81 P =CL ELEV 30.05
_ _
.. 30.34
30.68 . _ .
.. _ .
p 29.43 P -TOC RT ELEV
52 +00
53 +00
54 +00
55 +00
LAKE WASHINGTON BLVD N
PROFILE
HOR: 1"=20' VER: 1 " =10'
DRAINAGE NOTES
1. CATCH BASIN & MANHOLE STATIONS AND OFFSETS ARE TO CENTER OF
LID (ROUND MANHOLE COVER OR RECTANGULAR VANED GRATE).
2. RIM ELEVATIONS ARE FOR REFERENCE. RIM ELEVATIONS LISTED ARE
FINISHED GRADE AT CENTER OF LID. MATCH FINISHED GRADES AND
FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED.
2. WHEN THE VERTICAL CLEARANCE BETWEEN UTILITIES IS LESS THAN 6"
(MIN), PROVIDE AN OD X OD X 2.5" ETHAFOAM PAD BETWEEN
UTILITIES, WHERE OD IS THE OUTSIDE DIAMETER OF THE LARGER PIPE.
3. SEE CITY OF RENTON STD PLANS FOR DRAINAGE DETAILS.
4. TOP OF CURB ELEVATIONS NOT ADJUSTED FOR CURB CUTS, ADA
RAMPS, OR DRIVEWAYS.
5. LOCATION, DEPTH, AND SIZE OF EXISTING UTILITIES ARE APPROXIMATE.
CONTRACTOR TO VERIFY BY POTHOLING BEFORE EXCAVATION.
6. CONTRACTOR SHALL PHASE CONSTRUCTION TO AVOID CONFLICTS WITH
UTILITIES TO BE REMOVED OR ABANDONED UNTIL NEW SYSTEM IS
INSTALLED AND OPERATIONAL.
8. CATCH BASINS ALONG CURB FLOW LINE SHALL HAVE VANED GRATES
UNLESS OTHERWISE SPECIFIED.
R=361472 CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
rz- ?6rY7'l,
t
D
C
o no
"i It
It
a A D BUO
O�lc �e wesy�92
ti
-
SURVEYED: KPG
DRAWN BY: ODB
DESIGN BY: ODB
CHECK BV: PJG
9th
Sean,, A9 Tawnfferson
Seama, WA 96109 Tamma, WA ,Ave 9402
�
NGz
a� CITY OF RENTON
.0
Public Works Department
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PROFILE
DRAWING NO. 19
PROJECT NO. 11156
FED AID NO.
REVISED
TO CONFORM TO CONSTRUCTION
RECORDS
VS
HJT
07 2014
RECORD
DRAWINGS
z
°T k:a sr80�O "wa \'v�`
PROJ MGR: PJG
(2061286-1640 (2531627 -0720
PREPARED BY KPG, A1LY 2014
APPROVED FOR CONSTRUCTION
DATE: FEB 2012
�S /oNac e��� \y0
0�1
FILE: 08046PRF01.dwg
www.kpg.com
BASED ON CDNSTRUC710N RECORDS
BY. DATE.
STA 48 +00 TO STA 55 +00
SHEET NO. 19 OF 53
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE
rz- ?6rY7'l,
t
D
C
>y
m
� D
[QJ i
z
�
NGz
Q
- a0
?O
1
W
� 3
�
I�
m
3
46