Loading...
HomeMy WebLinkAboutR-361472l0' VC PLANS 203.00.& 204.30 1 STA 51 +26.54, 40.61' RT �L (DR n + STA .48 ±95.46, 36.34' RT 25 EXISTING CB ____ 30:18__ ___ __ ___ R2___ .... _ .11..11 STA 50+61.21; 53.28' RT 30.75 _ 30.02 _ _ L L L . + N + Lij ._ . M 00 00 FLOWLINE 50 +00 II II > LOGAN +N _ ...� W ... .. N. o+° o N PA a.. 28.9+ 30.3+ _. �N... CL a �.... a d 19'19 28.11 40 II II n PROJ MGR: PJG + o M —II APPROVED FOR CONSTRUCTION - 0:31% ..... DATE: FEB 2012 l0' VC PLANS 203.00.& 204.30 1 STA 51 +26.54, 40.61' RT �L (DR n + M pO, 25 EXISTING CB ____ 30:18__ ___ __ ___ R2___ .... _ .11..11 STA 50+61.21; 53.28' RT 30.75 _ 30.02 _ _ L L L . + N + Lij ._ . LOGAN AVE .N....... - _ .... SED GROUND "' — JSTRUCTION � a _7.00"1 EXISTING GROUND AT CONSTRUCTION 4 LF .... BEGIN OVERLAY U3 4 °0 PVC 20 .. STA 48 +03,23 N 21 : LE �. 8 "0 DI. S = 0.50% ... EXISTING CB - CONNECT .TO..... EXISTING CB 20 10 LF, -8 "0 DI 1 .. S = OM10 N .. 1� EXISTING CB- - - N 16 33 LF, 8"4 DI, S = 0.50% 0' . ' " 30:6 _ .. _ . 29:6 _ _ 29.1 _ EXISTING CB . _ ........ 29:2 25 EXISTING CB ____ 30:18__ ___ __ ___ R2___ o c°Di co ^ STA 50+61.21; 53.28' RT 30.75 _ 30.02 _ _ L L L . + N + N ._ . LOGAN AVE .N....... - _ .... R3A... LO FLOWLINE 50 +00 II II > w =29.75 _ ...� W ... .. N. J a 28.9+ 30.3+ CL a �.... a d 19'19 28.11 CL - CONNECT .TO..... EXISTING CB 20 10 LF, -8 "0 DI 1 .. S = OM10 N .. 1� EXISTING CB- - - N 16 33 LF, 8"4 DI, S = 0.50% 0' . ' " 30:6 _ .. _ . 29:6 _ _ 29.1 _ EXISTING CB . _ ........ 29:2 25 AVE N ___ ____ 30:18__ ___ __ ___ R2___ .._.. _ _ _ __ _... _.... ^ 28 . _ . 30.75 _ 30.02 _ _ L L L 29:56 A.L45 .... 29.81 AVE N LOGAN AVE .N....... - _ .... R3A... R3B.... ..... ..... _...... 29.430 ....... 50 +00 II _._._. -- 51 +00 ..._. _. 52 +00 GARDEN AVE N / LAKE WASHINGTON BLVD N PROFILE HOR: 1 " =20' VER: 1 " =10 60 . _ .... "i It It 60 .. ..... ..... .. - n ^ -:: 'J_ a� CITY OF RENTON .0 Public Works Department SOUTH LAKE WASHINGTON ROADWAY IMPROVEMENTS ROADWAY PROFILE DRAWING NO. 19 PROJECT NO. 11156 FED AID NO. .. ... .. :. + N dn°1... r7 ... ..... ....� ll... .................... .... ..... ....... 40 .. II I > W 40 J d CL °T k:a sr80�O "wa \'v�` PROJ MGR: PJG I................... ... 0.48% PREPARED BY KPG, A1LY 2014 0.68% .. APPROVED FOR CONSTRUCTION - 0:31% ..... DATE: FEB 2012 ...... . ...... �S /oNac e��� \y0 0�1 OVERLAY. ENDS www.kpg.com BASED ON CDNSTRUC710N RECORDS BY. DATE. STA 48 +00 TO STA 55 +00 SHEET NO. 19 OF 53 . STA, 53 ±64.11.... REVISION DESCRIPTION 20 APP. DATE 20 1.6 29.9..... !.....P 30..1. _ . _ . _ ....... ..._... 30.5 -_ 31.0 31 -TOC LT ELEV 29.81 P =CL ELEV 30.05 _ _ .. 30.34 30.68 . _ . .. _ . p 29.43 P -TOC RT ELEV 52 +00 53 +00 54 +00 55 +00 LAKE WASHINGTON BLVD N PROFILE HOR: 1"=20' VER: 1 " =10' DRAINAGE NOTES 1. CATCH BASIN & MANHOLE STATIONS AND OFFSETS ARE TO CENTER OF LID (ROUND MANHOLE COVER OR RECTANGULAR VANED GRATE). 2. RIM ELEVATIONS ARE FOR REFERENCE. RIM ELEVATIONS LISTED ARE FINISHED GRADE AT CENTER OF LID. MATCH FINISHED GRADES AND FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED. 2. WHEN THE VERTICAL CLEARANCE BETWEEN UTILITIES IS LESS THAN 6" (MIN), PROVIDE AN OD X OD X 2.5" ETHAFOAM PAD BETWEEN UTILITIES, WHERE OD IS THE OUTSIDE DIAMETER OF THE LARGER PIPE. 3. SEE CITY OF RENTON STD PLANS FOR DRAINAGE DETAILS. 4. TOP OF CURB ELEVATIONS NOT ADJUSTED FOR CURB CUTS, ADA RAMPS, OR DRIVEWAYS. 5. LOCATION, DEPTH, AND SIZE OF EXISTING UTILITIES ARE APPROXIMATE. CONTRACTOR TO VERIFY BY POTHOLING BEFORE EXCAVATION. 6. CONTRACTOR SHALL PHASE CONSTRUCTION TO AVOID CONFLICTS WITH UTILITIES TO BE REMOVED OR ABANDONED UNTIL NEW SYSTEM IS INSTALLED AND OPERATIONAL. 8. CATCH BASINS ALONG CURB FLOW LINE SHALL HAVE VANED GRATES UNLESS OTHERWISE SPECIFIED. R=361472 CALL 3 WORKING DAYS BEFORE YOU DIG: 811 rz- ?6rY7'l, t D C o no "i It It a A D BUO O�lc �e wesy�92 ti - SURVEYED: KPG DRAWN BY: ODB DESIGN BY: ODB CHECK BV: PJG 9th Sean,, A9 Tawnfferson Seama, WA 96109 Tamma, WA ,Ave 9402 � NGz a� CITY OF RENTON .0 Public Works Department SOUTH LAKE WASHINGTON ROADWAY IMPROVEMENTS ROADWAY PROFILE DRAWING NO. 19 PROJECT NO. 11156 FED AID NO. REVISED TO CONFORM TO CONSTRUCTION RECORDS VS HJT 07 2014 RECORD DRAWINGS z °T k:a sr80�O "wa \'v�` PROJ MGR: PJG (2061286-1640 (2531627 -0720 PREPARED BY KPG, A1LY 2014 APPROVED FOR CONSTRUCTION DATE: FEB 2012 �S /oNac e��� \y0 0�1 FILE: 08046PRF01.dwg www.kpg.com BASED ON CDNSTRUC710N RECORDS BY. DATE. STA 48 +00 TO STA 55 +00 SHEET NO. 19 OF 53 NUMBER REVISION DESCRIPTION BY APP. DATE rz- ?6rY7'l, t D C >y m � D [QJ i z � NGz Q - a0 ?O 1 W � 3 � I� m 3 46 z