HomeMy WebLinkAboutR-361473DRAINAGE NOTES
I
REVIJGIJ IV Uvlvr
Vnm
IV UWnI0Ir%UUIIVN
MUVRUJ
vJ
1.
CATCH BASIN & MANHOLE STATIONS AND OFFSETS ARE TO CENTER OF
-
Ovlgl p Dn.B�g -y
—
of R4s38o\ �w�
4SIONAL � 0�\yo\
SURVEYED: KPG
DRAWN BY: ODB
DESIGN BY: ODB
CHECK BY: PJG
FILEE:I 8046PRF01 dwg
KPGr
7539thAveN 2502 Jefferson Ave
Seattle, WA 98109 Tacoma, WA 98402
(206)266-1640 (253)627 -0720
www.kpg.Wm
c3 - CITY OF RENTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PROFILE
STA 10 +00 TO STA 19 +00
LID (ROUND MANHOLE COVER OR RECTANGULAR VANED GRATE).
- -- - - -- - - -- _ -.._
— I
.._. - - --------
- -
RECORD
DRAWINGS
PREPARED NSKPG,JULY2014
BASED ON CDNSTRUC110N RECDRDS
n
STA 14 +60.49, 30.23' RI
CB # 9 - CB TYI
I j
W
M
2.
RIM ELEVATIONS ARE FOR REFERENCE. RIM ELEVATIONS LISTED ARE
W/ RECTANGULAATE 9 i
ro+
i
<
N.
s
°
=
FINISHED GRADE AT CENTER OF LID. MATCH FINISHED GRADES AND
...
STA 15 +09.80, 3.._..
I
w ...
�
N
n
FLOW LINE ELEVATIONS UNLESS OTHERWISE NOTED.
_ ..... _... __
__ ._.. ._...
W
-._ -- -
- --
_
-___- �_-------
_
._.___ -- _;II .
_
_ _ _ . _ . _._._ 40 .
2.
WHEN THE VERTICAL CLEARANCE BETWEEN UTILITIES IS LESS THAN 6"
..... °N° o �
FILTERRA 6T _ ..
EX14NG
GROUND AT CONSTRUCTI
BEGIN OVERLAY
v~
s
(MIN), PROVIDE AN OD X OD X 2.5" ETHAFOAM PAD BETWEEN
T +�
...... 11 y .._ ...... r'
10
SEE DETAIL i ...
_ _. _., _.
-
STq 13 +34.96
)
i
`-'
o
UTILITIES, WHERE OD IS THE OUTSIDE DIAMETER OF THE LARGER PIPE.
_-
.. ..-
STA 15 +18.801 33. 6' LT (
...
EXISTING GROUND AT CONSTRUCTION -
3.
SEE CITY OF RENTON STD PLANS FOR DRAINAGE DETAILS.
W � m
N
ROPOSED GROUND (
l _
_
_
a
�.. �m
FLOWLINE AT CONSTRUCTION_
- - --
STA 8+89.64
a
0
~
28 0+ a 2$. 5
=28.49 (
_
- - ! j
_
4.
TOP OF CURB ELEVATIONS NOT ADJUSTED FOR CURB CUTS, ADA
- - -- _
_
3
RAMPS, OR DRIVEWAYS.
- -
-
- -- - -._- _.._...
-
------
i
-_-
5.
LOCATION, DEPTH, AND SIZE OF EXISTING UTILITIES ARE APPROXIMATE.
- -.
-
CONTRACTOR TO VERIFY BY POTHOLING BEFORE EXCAVATION.
80 LF
_.
8 "0 DI Irr
!
In
- --
_.
-
--
6.
CONTRACTOR SHALL PHASE CONSTRUCTION TO AVOID CONFLICTS WITH
-
j
U1ILITIES TO BE REMOVED OR ABANDONED UNTIL NEW SYSTEM IS
.....
INSTALLED AND OPERATIONAL.
1.9 2d.2 2`x.4
29.4
29.3
29 0 2
2$.6
28
.8
..
P -TOC LT ELEV 30.42
29.97..
8.
CATCH BASINS ALONG CURB FLOW LINE SHALL HAVE VANED GRATES
-
_
_ .
__ - -__I _., - - -P
-EL- ELEV 28:70
O T/1/, DT t-1 C \/
28.79 '
UNLESS OTHERWISE SPECIFIED.
CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
REVIJGIJ IV Uvlvr
Vnm
IV UWnI0Ir%UUIIVN
MUVRUJ
vJ
I-IJI
V/ LVI4
Ovlgl p Dn.B�g -y
—
of R4s38o\ �w�
4SIONAL � 0�\yo\
SURVEYED: KPG
DRAWN BY: ODB
DESIGN BY: ODB
CHECK BY: PJG
FILEE:I 8046PRF01 dwg
KPGr
7539thAveN 2502 Jefferson Ave
Seattle, WA 98109 Tacoma, WA 98402
(206)266-1640 (253)627 -0720
www.kpg.Wm
c3 - CITY OF RENTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PROFILE
STA 10 +00 TO STA 19 +00
DRAWING NO. 2O
PROJECT NO. 11156
FED AID NO.
DATE: FEB 2012
SHEET NO. 20 OF 53
EXISTING -CB
N
o
u
RECORD
DRAWINGS
PREPARED NSKPG,JULY2014
BASED ON CDNSTRUC110N RECDRDS
n
STA 14 +60.49, 30.23' RI
CB # 9 - CB TYI
I j
W
>
W/ RECTANGULAATE 9 i
ro+
i
<
N.
s
°
=
STA 15 +09.80, 3.._..
I
w ...
s
REVISION DESCRIPTION
a
n
DATE
..
00 o°DO
GARDEN A N
W
3 �.
o
..... °N° o �
FILTERRA 6T _ ..
i
_=
6.32%
O
T +�
...... 11 y .._ ...... r'
10
SEE DETAIL i ...
_ _. _., _.
7.20
_ _ _
40
`-'
o
J 0i
.. ..-
STA 15 +18.801 33. 6' LT (
...
EXISTING GROUND AT CONSTRUCTION -
3
W � m
N
ROPOSED GROUND (
l _
OVER AY ENDS
a
�.. �m
FLOWLINE AT CONSTRUCTION_
- - --
STA 8+89.64
a
0
~
28 0+ a 2$. 5
=28.49 (
_
- - ! j
- - -- _
_
3
0.13% 0.20 %..
-
- -- - -._- _.._...
-
---
_
z
- -.
-
80 LF
_.
8 "0 DI Irr
!
In
CALL 3 WORKING DAYS
BEFORE YOU DIG:
811
REVIJGIJ IV Uvlvr
Vnm
IV UWnI0Ir%UUIIVN
MUVRUJ
vJ
I-IJI
V/ LVI4
Ovlgl p Dn.B�g -y
—
of R4s38o\ �w�
4SIONAL � 0�\yo\
SURVEYED: KPG
DRAWN BY: ODB
DESIGN BY: ODB
CHECK BY: PJG
FILEE:I 8046PRF01 dwg
KPGr
7539thAveN 2502 Jefferson Ave
Seattle, WA 98109 Tacoma, WA 98402
(206)266-1640 (253)627 -0720
www.kpg.Wm
c3 - CITY OF RENTON
Public Works Department
APPROVED FOR CONSTRUCTION
BY: DATE:
SOUTH LAKE WASHINGTON
ROADWAY IMPROVEMENTS
ROADWAY PROFILE
STA 10 +00 TO STA 19 +00
DRAWING NO. 2O
PROJECT NO. 11156
FED AID NO.
DATE: FEB 2012
SHEET NO. 20 OF 53
RECORD
DRAWINGS
PREPARED NSKPG,JULY2014
BASED ON CDNSTRUC110N RECDRDS
NUMBER
REVISION DESCRIPTION
BY
APP.
DATE