Loading...
HomeMy WebLinkAboutR-361487ro rr� w w 0 0 a N w z J 2 U H Q _ v, GENERAL CHANNELIZATION NOTES 1. REMOVE ALL EXISTING CONFLICTING CHANNELIZATION. 2. ALL PAVEMENT MARKING MATERIAL SHALL CONFORM TO THE "STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION," LATEST EDITION. 3. SEE STANDARD DETAILS FOR CITY OF RENTON ROAD STANDARDS CHANNELIZATION AND SIGNING DETAILS. 4. PRESERVE AND PROTECT ALL BUSINESS SIGNS. 5. ALL RELOCATED SIGNS TO HAVE NEW SQUARE TUBING POSTS AND POST BASES PER CITY OF RENTON STD PLANS G010 & G012 AND WSDOT STD PLANS G- 20.10 -00, G- 24.50.00 & G- 24.40 -01, UNLESS STATED OTHERWISE ON PLANS. CHANNELIZATION NOTES �1 LANE LINE PER WSDOT STD PLAN M- 20.50 -02. �2 THERMOPLASTIC PAVEMENT ARROW PER CITY OF RENTON STD PLAN H002 & H008. �3 DOUBLE YELLOW CENTER LINE PER WSDOT STD PLAN M- 20.50 -02. ® WIDE LANE LINE PER WSDOT STD PLAN M- 20.50 -02. 7❑ 18" THERMOPLASTIC STOP LINE PER CITY OF RENTON STD PLAN H008. SIGN SCHEDULE SIGN NO. STATION OFFSET DESIGNATION SIGN SIZE REMARKS S1 45 +00.64 38.72' RT "STOP" — RELOCATE S2 45 +87.83 27.76' RT "RIGHT LANE MUST TURN — EXISTING TO REMAIN CONIC CURB — FD 8 m o RIGHT RECORD DRAWINGS PREPARED BY KPG, JULY 2014 BASED ON CONSTRUCTION RECORDS S3 47 +11.93 26.03' RT "ONLY ARROWS" — REMOVE NEW, SEE MODIFIED R3 -802 DETAIL, SHEET 33, S4 — — R3 -802 36" X 30" TO BE LOCATED ON NEW LUMINAIRE POLE. FOR LOCATION SEE ILLUMINATION PLAN, SHEET 22. S5 1 44+53.04 1 40.00' RT "LOWE'S" I I EXISTING A-B: 2- ;,4c v 9'7 TO REMAIN 361487 CALL 3 WORKING DAYS BEFORE YOU DIG: 811 /1X I onnVU1 nv� I VRD IMFLR RcV1011 V — ru fl nvi 1 Plou lu//L//iz oti "t q rsop a '�o _ z k P 55o6�v 0� : NA V bNG� 'p 0A SURVEYED: KPG DRAWN BY: HJT DESIGN BY: HJT CHECK BY: NJD PROJ MGR: NJD FILE: 0B046CHN01.dwg �� 753 9th Ave N 2502JeKersonAve Seattle, WA 98109 2112,a,WA98402 (2 0 61 2 8616 4 0 (2531627 -0720 WV,1V I<pg Wal 3 Q�i CITY OF RENTON ".IL Public Works Department APPROVED FOR CONSTRUCTION BY. DATE: SOUTH LAKE ROADW CHANNELIZATION STA 4 WASHINGTON Y IMPROVEMENTS & SIGNING PLAN +00 TO STA 48 +00 q DRAWING NO. 34 PROJECT NO. 11156 FED AID NO. DATE: FEB 2612 SHEET NO. 34 OF 53 s EXTENSION OF DUAL FACED CONIC CURB — FD 8 m o 11 09 12 RECORD DRAWINGS PREPARED BY KPG, JULY 2014 BASED ON CONSTRUCTION RECORDS REVISED TO CONFORM TO CONSTRUCTION RECORDS VS HJT 07/2014 n NUMBER REVISION DESCRIPTION BY APP. DATE A-B: 2- ;,4c v 9'7 I I 8 G M �o D n E z ci z m� Nz m z s, 0 �y = nm m c Y D 3 «� z "= ` O 1 =o 3 m o � 3 m z n I I 8 G M �o D n E z ci z m� Nz m z s, 0 �y m Y D «� z ` O 1 =o 3 o � 3 m z 8 o M D � #N Z