Loading...
HomeMy WebLinkAboutR-361495PVC I COPPER BACK TO METER ALL FITTINGS PVC FINISH GRADE PVC IRRIGATION MAIN� . I reJ 0 0 0 0 ° 4 0.. o g° ° ° 0° . _ qo0 004 °0 °�.° .. 0 0 E • °O,. ,0 0 0 . _ °op° o. °. .0.0 ° o . o o , O b' T C c c 4 4 v STACKED METER BOXES PER CITY OF RENTON STANDARDS. SIZE TO FIT EQUIPMENT. 3 0 J l� NOTE: INSTALL ASSEMBLY IN ACCORDANCE WITH CITY OF RENTON STANDARD PLAN - 340.8. SEE POINT OF CONNECTION ASSEMBLY, THIS SHEET. DETAIL DOUBLE CHECK VALVE ASSEMBLY NTS SIDE ELEVATION SECTION THROUGH MAIN LINE FINISH GRADE VALVE BOX QUICK COUPLER (2) STAINLESS STEEL CLAMPS TO STAKE P.V.C. NIPPLE 3' #4 REBAR STAKE 360' PVC TRIPLE SWING JOINT P.V.C. PRESSURE MAIN PVC TEE OR ELBOW WITH (SxS) OUTLET QUICK COUPLER OR SPRINKLER BODY 360' PVC TRIPLE SWING JOINT PVC TEE (SxS) AT MAINLINE NOTE: ALL THE FITTINGS AND PIPE TO BE SAME DIA. AS IPS FEMALE CONNECTION OF QUICK COUPLER/ SPRINKLER HEAD QUICK COUPLING VALVE NTS COMPACT BACKFlLL APPROVED DOUBLE CHECK VALVE, INSTALL PER CITY OF RENTON STANDARDS. COPPER UNION AND PIPE PRESSURE REDUCING VALVE (REQUIRED) // /I WASHINGTON REGISTERED LAND CAP ARCHITECT IZA TH BSON CERTIFI E NO. 538 PRESSURE MAIN CONNECT TO SHUT OFF VALVE AND METER TREE ROOTBALL LATERAL LINE li :Nmm in (V X 0 m a a a F VALVE BOX ;OMPACT BACKFlLL STANDARD VALVE BOX WITH LOCKING COVER - FLUSH WITH FINISH GRADE GATE VALVE BRASS UNION, TYP. PRESSURE MAIN 6" MIN. DEPTH PEA GRAVEL SUMP BRASS MANUAL SHUT -OFF VALVE NTS TREE GRATE TYP FINISHED GRADE MULCH LAYER PLASTIC CAP FLOOD BUBBLER WITH Y2" FEMALE THREADED INLET SHRUB ADAPTOR PEA GRAVEL 4" ADS CPP PERFORATED BLACK PLASTIC PIPE, 1" LENGTH ''Iii Y27 NIPPLE BARBED POLYETHYLENE ELBOW & MARLEX STREET 90' Y2" DIA. POLYETHYLENE FLEX PIPE LENGTH AS NECESSARY BARBED POLYETHYLENE ELBOW PVC TEE OR ELBOW FLOOD BUBBLER ASSEMBLY NTS IRRIGATION MAIN LINE DOUBLE CHECK VALVE - 1" PRESSURE REDUCING VALVE (REQUIRED) MANUAL SHUT OFF VALVE, INSTALL IN SEPARATE VALVE BOX IRRIGATION METER - 1" ©: i 1" QUICK COUPLER VALVE TO PRESSURE MAIN NOTE: CONNECTION TO PRESSURE MAIN SHALL NOT BE MADE UNTIL IRRIGATION MAIN LINE IS PRESSURE TESTED. TYPICAL POINT OF CONNECTION ASSEMBLY NTS CONNECTION TO SPRINKLER HEAD. SEE FLOOD BUBBLER ASSEMBLY THIS SHEET TOP OF CURB IRRIGATION LATERAL SUPPLY LINE PVC CONDUIT PRECAST INTO CENTER OF BOX WALL, FOR IRRIGATION SUPPLY LINE CONNECTION TO SPRINKLER HEAD. SEE FLOOD BUBBLER ASSEMBLY THIS SHEET ELEVATION ----- ---- - - - - -� I I I / \ I IRRIGATION LATERAL SUPPLY LINE — 22t 1 I I I UNIT SIZE A B 4' X 4' 2' -6" 2' -6" 4' X 6' 2' -6" 3' -6" m - - -- FACE OF CURB PLAN X. LAYER BY ;AST TREE GRATE PVC CONDUIT PRECAST INTO CENTER OF BOX WALL, FOR IRRIGATION SUPPLY FILTERRA THROAT OPENING FILTERRA UNIT IRRIGATION PLANNING LAYOUT NTS R- 361495 CALL 3 WORKING DAYS BEFORE YOU DIG: 811 8 O D ;` D m m m z 0 m = C nm m Zi m 0 c � u Yn —� 0 � N z 0 o w z o F� 3 A z � m z 8 O D ;` D m m m z 0 m = C nm m Zi m 0 c � u Yn —� 0 � N z 0 o w z o F� 3 .p z �o z o0 m z G)