Loading...
HomeMy WebLinkAboutR-2828190 0 a 0 8 a x a 3 N STATION* (/) 8 DEMOLITION AND CONSTRUCTION NOTES: DETAIL NO. g 22 +14 6 C 1O PLANE AC PAVEMENT 2" AND CONSTRUCT NEW 2" SMA OVERLAY PER (EAST VALLEY ROAD) OR C (43rd STREET) j 03.1 e RAMP I.L O2 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 9" AND CONSTRUCT NEW CEMENT THICK CEMENT CONCRETE PAVEMENT PER COR DETAIL A -01.1 AND (EAST VALLEY ROAD) OR (43rd STREET) STA 23 +38 C C Q c END OF CURB AND GUTTEI CD O3 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 10" MATCH EXISTING. APPRF3X w THICK CEMENT CONCRETE PAVEMENT PER COP DETAIL A -01.1 AND C2 }} ELEV. AT GUTTER IS 23.16 gJ ® SAWCUT ALONG LINE. - - - - LONGITUDINAL CONTRACTION OR ' 7�' J w CONSTRUCTION JOINTS PER COR�c j � CONSTRUCT NEW 4" CEMENT CONCRETE SIDEWALK PER COB FR -02. DETAIL A -01.1 AND A -01.2 w O STATION* (/) 8 COR DETAIL NO. 6 -1 22 +14 26'RT j 03.1 /CURB RAMP REMOVE EXISTING CEMENT CONCRETE RAMP AND CONSTRUCT NEW CEMENT 0 O /CURB { 6 -3 0 CONCRETE CURB RAMP PER TABLE 1. F- J CONSTRUCT AT zz Q g V 31 +48 Z F- 03.1 /CURB RAMP ALT. CONSTANT SLO a- O Fx REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND STRUCT NEW z NON- INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL C7 w Z C!l w O ® REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND CONSTRUCT NEW CEMENT > Q CONCRETE BARRIER CURB AND GUTTER PER COB DETAIL F -01. i z Q STA 22 +54 REMOVE EXISTING APRON AND CONSTRUCT NEW CEMENT CONCRETE CATCH BASIN APRON BEGIN OF CURB--, GUTTER MATCH E: Q PER DETAIL C4 APPROX. ELEV,AT w 10 ADJUST RIM ELEVATION TO MATCH FINISHED GRADE. GUTTER IS 22:86. (LOW POINT %OF 11 REMOVE DETERIORATED PORTION OF CEMENT CONCRETE DRIVEWAY AND CONSTRUCT GUTTER) CEMENT CONCRETE DRIVEWAY PATCH. j Q 2 ao � REMOVE EXISTING TRAFFIC ISLAND. CONSTRUCT NEW TRAFFIC ISLAND PER DETAIL C8 o° WITH NEW NON- INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAILrl­�W/ ASPHALT AREA. wZ 1r= C7 O Q of 13 REMOVE EXISTING TRAFFIC CURB AND CONSTRUCT NEW TYPE C BLOCK E- �< TRAFFIC CURB PER COB DETAIL F -02. NZ as f15 O c W a 14 REMOVE EXISTING CEMENT CONCRETE SIDEWALK AND CONSTRUCT �+ NEW 4" CEMENT CONCRETE SIDEWALK PER INDICATED DETAIL. f g \E 15 EXISTING CURB AND GUTTER TO REMAIN. ,! EXISTING UTILITY AND COVERS TO REMAIN. PROTECT AND ADJUST TOP'COVEP - ` a� TO MATCH FINISHED GRADE AS DIRECTED BY ENGINEER. 4 @ 6.35' 6 2 PLANE ASPHALT PAVEMENT 3" AND CONSTRUCT NEW 3" C• % x __ Qa SMA OVERLAY IN, TWO(2) 1 1/2" LIFTS PER S)' 2 %_ n �1 !� - g 6 6 € o REMOVE EXISTING CATCH BASIN TYPE 1. .,C'j l 1 g PLUG CONNECTOR PIPE WITH CONCRETE. ,;:; 5TA Oi 6 REMOVE AND REPLACE CATCH BASIN TYPE 2 1 L'__ AEG N 10, SEE DETAIL C8 AND COB DETAIL B -027._ 1+00 z 0 w O z 1 1'1 o-G >EE DETAI 6�TYP. C n TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS / PER COB DETAIL A -0-1.1 AND A -01.2. (TYRICAL FOR / ALL JOINTS WITHIN 10" CEMENT CONC. PVMT.) ` hY, f f G' io ^' 0 11' ioo x Diiw ll6l' _j _ 0 },C__-- - 4 @ 8.37' SEE 1 DETAIL C8 FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION CONTROL LINE FA SEE 4 D ETAI L 6 �.t FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION �OJ %" CONTROL LINE / ® TRANSVERSE CONSTRUCTION ��ff SE OR CONTRACTION JOINTS \D 'C2 PER COB DETAIL A -01.1 AND A -01.2 (TYP.) 16 j I. li V 6 -1� NEWI 9" CONCREITE P tI `J SEE DETAIL 3 C8 IM 13 21177 11 ES 2+ 0 5 2 .5' 11' IES D°Nn"'Ay __ V SwF :AY _._ V) SEE DETAIL\ = 6 F- O 00 5r 5 W L = 11' 13 VARI S REHABILITATION OF EAST VALLEY ROAD DwG No. AND SW 43rd STREET C3 PAVEMENT AND OVERLAY PLAN SHEET 3 OF 10 CURB RAMP TABLE 1 P- STPUL -TA -96 (268) 20 40 60 SCALE IN FEET RAMP NO. STATION* OFFSET* 8 COR DETAIL NO. 6 -1 22 +14 26'RT F- 03.1 /CURB RAMP 6 -2 20 +90 1O'RT 0 O /CURB { 6 -3 0 1'RT F- J /CURB RAMP LW 31 +48 Z F- 03.1 /CURB RAMP ALT. A Fx -s d K a a a 0 m z 0 w O z 1 1'1 o-G >EE DETAI 6�TYP. C n TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS / PER COB DETAIL A -0-1.1 AND A -01.2. (TYRICAL FOR / ALL JOINTS WITHIN 10" CEMENT CONC. PVMT.) ` hY, f f G' io ^' 0 11' ioo x Diiw ll6l' _j _ 0 },C__-- - 4 @ 8.37' SEE 1 DETAIL C8 FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION CONTROL LINE FA SEE 4 D ETAI L 6 �.t FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION �OJ %" CONTROL LINE / ® TRANSVERSE CONSTRUCTION ��ff SE OR CONTRACTION JOINTS \D 'C2 PER COB DETAIL A -01.1 AND A -01.2 (TYP.) 16 j I. li V 6 -1� NEWI 9" CONCREITE P tI `J SEE DETAIL 3 C8 IM 13 21177 11 ES 2+ 0 5 2 .5' 11' IES D°Nn"'Ay __ V SwF :AY _._ V) SEE DETAIL\ = 6 F- O 00 5r 5 W L = 11' 13 VARI S REHABILITATION OF EAST VALLEY ROAD DwG No. AND SW 43rd STREET C3 PAVEMENT AND OVERLAY PLAN SHEET 3 OF 10 CURB RAMP TABLE 1 P- STPUL -TA -96 (268) 20 40 60 SCALE IN FEET RAMP NO. STATION* OFFSET* 8 COR DETAIL NO. 6 -1 22 +14 26'RT F- 03.1 /CURB RAMP 6 -2 20 +90 1O'RT F- 03.1 /CURB RAMP 6 -3 20 +69 1'RT F- 03.1 /CURB RAMP 6 -4 31 +48 1 761T F- 03.1 /CURB RAMP ALT. * SEE DETAIL C7 FOR STATION & OFFSET, REFERENCE POINT 15 -- — — 5.5 -_ -- — ` _ TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.1 AND A -01.2 DkPnV4A" 1 STA TRAFFIC CURB 43rd STREET 4+00 w 3 N H O w z J 2 F TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.1 AND A -01.2 (TYP.) SEE DETAIL 6 R- 282819 LONGITUDINAL CONTRACTION OR CONSTRUCTION JOINTS PER COR DETAIL A -01.1 AND A -01.2 STA 4 +74. 251T STA 4 +69, 3'LT END TYPE C BLOCK 1RAFFIC CURB 6.5 t - J H +too. c Ri ." I END TYPE C BLOCK TRAFFIC CURB STA 4 +65 — END 9" CONCRETE n,.'l_`tIMIDRCJL PAVEMENT < l J a l J �r A W 1 m ° 0 D oya AFB 1 Wh° NM..N r. C N 0 go 8 O a �o Nz � y a I m z gm n < l J a l J �r A W 1 m ° 0 D oya AFB 1 Wh° NM..N r. C N 0 go 8 O a �o D � y a I gm � Z m� '= mm C 3 z m m A < l J a l J �r A W 1 m ° 0 D oya AFB 1 Wh° NM..N r. C N 0 go 8 O a �o D a m m gm �