Loading...
HomeMy WebLinkAboutR-2828210 6 w i 0 x a N I LCD d =U � $ Y a° � o o: w Z �E0 O O E" < 1� nw U R: 0I � o vE 3E �E C O w d � 1 `s �= o Y < J � J z 3 U � a � a a < w a 0 m z 0 w O Z U 2111 i DEMOLITION AND CONSTRUCTION NOTES: O PLANE AC PAVEMENT 2" AND CONSTRUCT NEW 2" SMA OVERLAY PER C 2O REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 9" THICK CEMENT CONCRETE PAVEMENT PER COR DETAIL A -01.1 AND C O3 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 10" THICK CEMENT CONCRETE PAVEMENT PER COR DETAIL A -01.1 AND 1 C2 ® SAWCUT ALONG LINE. — — — — REMOVE EXISTING CEMENT CONCRETE RAMP AND CONSTRUCT NEW CEMENT CONCRETE CURB RAMP PER TABLE 1, SHEET C3. Oj REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND CONSTRUCT NEW NON— INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL 1 . C7 15 EXISTING CURB AND GUTTER TO REMAIN. 16 EXISTING UTILITY AND COVERS TO REMAIN. PROTECT AND ADJUST TOP COVER TO MATCH FINISHED GRADE AS DIRECTED BY ENGINEER. 1 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW ASPHALT CONCRETE PATCH PER DETAIL ACTUAL SIZE AND LOCATION TO BE DETERMINED BY THE ENGINEER. M C7 19 PROTECT EXISTING MONUMENT AND CASE. REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND CONSTRUCT NEW TRANSITION NON— INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL 5 C7 �1 REMOVE EXISTING ASPHALT CONCRETE RAMP AND SHOULDER AND CONSTRUCT NEW 6" ASPHALT CONCRETE RAMP AND SHOULDER PER DETAIL . C7 PLANE AC PAVEMENT 2" AND CONSTRUCT NEW 2" SMA OVERLAY PER C s r_ z m EAST VALLEY RD. 0 N m n .P wild'_ 2S +-0 cork. _r1r• "� BEGIN CONC. \ PVMT. SEE DETAIL C LOCATION OF ASPHALT CONCRETE PATCH ONC ETE W 9 i= 4 i i SEE DETAIL 4 C \ MATCH EXISTING BEGIN CURB MATCH EXISTING FVR PSfR S,T SEE I DETAIL C P OJ�R� 5M 2 16 j! LYLUIN '110 DUNG NVM I. END 9" CONC. PVMT. END SMA 8 SEE DETAIL 19 6 17 � i 9 OON NW Ian, 1 ro� l% 15 p;rdf - ru'F n.r FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION CONTROL LINE TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COP DETAIL A -01.2 (TYP.) SEE DETAIL 5 C 11 UN o, N� - i pnFS �6 l� STA 31+34 \ BEGIN CURB MATCH EXISTING STA 31+34 BEGIN AC RAMP MATCH EXISTING STA 31+38 OL "55 P. STA 31 +94, 77.Z END`,SMA BEGIN 0" CONC. PVMT. V '\ �J -j�111 1 6 `1l0 T SEE DETAI'L 4 END AC RAMP SEE DETAIL 5 C7 DWG NO. REHABILITATION OF EAST VALLEY ROAD C5 AND SW 43rd STREET SHEET PAVEMENT AND OVERLAY PLAN 5 OF 10 P— STPUL —TA -96 (268) 2� 20 10 0 20 40 60 SCALE IN FEET STA 33 +57 — SEE DETAIL 4 16 / SEE / r DETAIL 5 6 O�jPLK�y SEE P EXISTING SHOULDER A 3232 +IvEY D 10" INC. / ' . BEGIN SMA / SEE DETAIL (74 0 / V i STATE R/W FACE OF CURB= CONSTRUCTION CONTROL LINE TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.2 (TYP.) TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.2 (TYP.) STA 31 +99, 12.5'RT BEGIN 10" CONC. PVMT. R- 282821 i 0 2 no iR so CD N= a a w °o Of z m � J J No L LJ Ld z z L) O � � �m 7 p Q w :1 i ZZ Q3 � m w m z W z (� w p z a_ ¢ ¢ MJ_ W S W tr, a° � o o: w Z �E0 O O E" < 1� nw U R: 0I � o vE 3E �E C O w d � 1 `s �= o Y < J � J z 3 U � a � a a < w a 0 m z 0 w O Z U 2111 i DEMOLITION AND CONSTRUCTION NOTES: O PLANE AC PAVEMENT 2" AND CONSTRUCT NEW 2" SMA OVERLAY PER C 2O REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 9" THICK CEMENT CONCRETE PAVEMENT PER COR DETAIL A -01.1 AND C O3 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW 10" THICK CEMENT CONCRETE PAVEMENT PER COR DETAIL A -01.1 AND 1 C2 ® SAWCUT ALONG LINE. — — — — REMOVE EXISTING CEMENT CONCRETE RAMP AND CONSTRUCT NEW CEMENT CONCRETE CURB RAMP PER TABLE 1, SHEET C3. Oj REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND CONSTRUCT NEW NON— INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL 1 . C7 15 EXISTING CURB AND GUTTER TO REMAIN. 16 EXISTING UTILITY AND COVERS TO REMAIN. PROTECT AND ADJUST TOP COVER TO MATCH FINISHED GRADE AS DIRECTED BY ENGINEER. 1 REMOVE EXISTING ASPHALT CONCRETE PAVEMENT AND CONSTRUCT NEW ASPHALT CONCRETE PATCH PER DETAIL ACTUAL SIZE AND LOCATION TO BE DETERMINED BY THE ENGINEER. M C7 19 PROTECT EXISTING MONUMENT AND CASE. REMOVE EXISTING CEMENT CONCRETE CURB AND GUTTER AND CONSTRUCT NEW TRANSITION NON— INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL 5 C7 �1 REMOVE EXISTING ASPHALT CONCRETE RAMP AND SHOULDER AND CONSTRUCT NEW 6" ASPHALT CONCRETE RAMP AND SHOULDER PER DETAIL . C7 PLANE AC PAVEMENT 2" AND CONSTRUCT NEW 2" SMA OVERLAY PER C s r_ z m EAST VALLEY RD. 0 N m n .P wild'_ 2S +-0 cork. _r1r• "� BEGIN CONC. \ PVMT. SEE DETAIL C LOCATION OF ASPHALT CONCRETE PATCH ONC ETE W 9 i= 4 i i SEE DETAIL 4 C \ MATCH EXISTING BEGIN CURB MATCH EXISTING FVR PSfR S,T SEE I DETAIL C P OJ�R� 5M 2 16 j! LYLUIN '110 DUNG NVM I. END 9" CONC. PVMT. END SMA 8 SEE DETAIL 19 6 17 � i 9 OON NW Ian, 1 ro� l% 15 p;rdf - ru'F n.r FACE OF CURB= EAST VALLEY ROAD CONSTRUCTION CONTROL LINE TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COP DETAIL A -01.2 (TYP.) SEE DETAIL 5 C 11 UN o, N� - i pnFS �6 l� STA 31+34 \ BEGIN CURB MATCH EXISTING STA 31+34 BEGIN AC RAMP MATCH EXISTING STA 31+38 OL "55 P. STA 31 +94, 77.Z END`,SMA BEGIN 0" CONC. PVMT. V '\ �J -j�111 1 6 `1l0 T SEE DETAI'L 4 END AC RAMP SEE DETAIL 5 C7 DWG NO. REHABILITATION OF EAST VALLEY ROAD C5 AND SW 43rd STREET SHEET PAVEMENT AND OVERLAY PLAN 5 OF 10 P— STPUL —TA -96 (268) 2� 20 10 0 20 40 60 SCALE IN FEET STA 33 +57 — SEE DETAIL 4 16 / SEE / r DETAIL 5 6 O�jPLK�y SEE P EXISTING SHOULDER A 3232 +IvEY D 10" INC. / ' . BEGIN SMA / SEE DETAIL (74 0 / V i STATE R/W FACE OF CURB= CONSTRUCTION CONTROL LINE TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.2 (TYP.) TRANSVERSE CONSTRUCTION OR CONTRACTION JOINTS PER COB DETAIL A -01.2 (TYP.) STA 31 +99, 12.5'RT BEGIN 10" CONC. PVMT. R- 282821 i Z 2 no iR so 3m- N= a a w °o z m m wc N � No n m `P O0 iR so O a a w °o z D wc N GGC m z z L) Z �m 7 o Nz m m o n ay a �r as 1 O O A Nyz "a n N O O0 iR so m