Loading...
HomeMy WebLinkAboutR-2828344 '>3 a g Z m � � c c Nr a n p L-1 A O n c WA° NHz "a Z O C a w z m z ffi ry J w V l Z Q LLll J tl O� N ZZ Z (/7 o Z C)) L �Q J m Q 2 w 3/8' EXPANSION JOINT 6 1/2" 1" RADIUS CONCRETE SIDEWALK 5 1/2 I NEW CEMENT e CONCRETE ° ° PAVEMENT e e 6 "(EXCEPT AT CURB RAMPS) 3" IF .., ° 5 112" 14, . COLD JOINT ° e e ° a ° d e 4 °... #3 REBAR t EXISTING CSTC I i pub 5 (TO REMAIN) ..._ —I EXISTING SUBGRADE SECTION (TO REMAIN) NTS a« �o v.. LLz _ .20 00 0E � 3< La �_ W U o' a IF EN ME 3/8" EXPANSION JOINT 6" AC PAVEMENT '11 cm RAMP a� 's !? 2" CRUSHED SURFACING o TOP COURSE COLD JOINT T; #3 REBAR x z U J i 0 z 0 En z d z A �/Z_ SAW CUT (TYP) EXISTING CURB AND GUTTER A (TO REMAIN) C4 N��I� SECTION B -B NTS 1 � NON— INTEGRAL CEMENT 3,C5 NTS �/ PLACE 0 28" O.C. #3 REBAR X 32" TOP OF CURB ° COLD JOINT ETE BARRIE 6" AC SHOULDER 9" CEMENT 9" CEMENT - CONC. PVMT. CONC. PVMT. 2" CRUSHED ° �Am SURFACING 4 ` ° TOP COURSE ° ° II! ilia :... > " . EXISTING CSTC (TO REMAIN) SECTION C —C EXISTING SUBGRADE NTS TRANSVERSE — CONSTRUCTION JOINTS EXISTING CATCH BASIN (TO REMAIN) EXISTING INTEGRAL —J CURB AND GUTTER (TO REMAIN) EXISTING CONCRETE SIDEWALK (TO REMAIN) SAWCUT AND REMOVE PORTION OF EXISTING CEMENT CONCRETE SIDEWALK EXISTING CSTC (TO REMAIN) EXISTING SUBGRADE REMOVE PORTION OF EXISTING CONCRETE APRON ASPHALT CONCRETE TO FACE OF EXISTING EXISTING CURB-7 REMOVE PORTION OF PAVEMENT PATCH CATCH BASIN (TO REMAIN) EXISTING APRON TO FACE OF EXISTING CATCH BASIN 2" SMA OVERLAY 4. REMOVE EXISTING ASPHALT CONCRETE EXISTING CATCH BASIN (TO REMAIN) RTION OF CONCRETE APRON PLAN NTS f_ EXISTING AC PVMT. EXISTING CATCH (TO REMAIN) BASIN (TO REMAIN) EXISTING CSTC (TO REMAIN) EXISTING SUBGRADE SECTION A —A NTS REHABILITATION OF EAST VALLEY ROAD DWG N0. AND S'N 43rd STREET C7 SECTIONS AND DETAILS SHEET 7OF10 LANDING SHALL BE P— STPUL —TA -96 (268) WITHIN CROSSWALK Fp fp STATION AND OFFSET TO CONSTRUCTION CONTROL PER TABLE 1 SHEET C3 45 CURB RAMP CONTROL POINT DETAIL C3 NTS \ 12:1 5 -NEW 9" CEMENT CONCRETE PAVEMENT TRANSITION NON- INTEGRAL CEMENT CONCRETE BARRIER CURB PER DETAIL e NEW 10" CEMENT CONCRETE PAVEMENT C -• -'1 R =54' C 6 ASPHALT SHOULDER SAWCUT LINE ASPHALT-/ R =48' r 'l RAMP EXISTING STATE R/W PEDESTRIAN S(G L 5 ASPHALT SIDEWALK AND SHOULDER Crj NTS EXISTING ASPHALT NON- INTEGRAL CEMENT CONCRETE EXISTING INTEGRAL CONC. BARRIER CURB CURB AND GUTTER ASPHALT RAMP 12:1 6" d e I} .ate a d n.eQ e a Tru —7rI a' NEW 9" CEMENT EXISTING SUBGRADE NEW 10" CEMENT CONCRETE PAVEMENT (TO REMAIN) CONCRETE PAVEMENT 6 TRANSITION NON- INTEGRAL CEMENT CONCRETE BARRIER CURB C cj NTS 2" SMA OVERLAY loop U� 4 EXISTING ASPHALT �-��'° CONCRETE PAVEMENT (TO REMAIN) EXISTING CSTC � � � I ASPHALT CONCRETE (TO REMAIN) PAVEMENT PATCH EXISTING SUBGRADE (TO REMAIN) L-2_ 1 ASPHALT CONCRETE PATCH SECTION NTS Rm282834 �5 P - a y z, Z m � Nr a n p L-1 A O n Z O o a D m Z Z* G) Nr a n p W ^ A O O m Z WA° NHz "a Z a C a z m z ffi m O o a D m Z Z* G) Nr A W d 6 a V 1 W ^ A O O pFn 1 WA° NHz "a c N o� O o a D m Z Z* G)