1/4 SECTION NW 32 TOWNSHIP 23 RANGE 05 EROSION AND SEDIMENT CONTROL RECOMMENDED CONSTRUCTION SEQUENCE
LEGEND
1. PRE - CONSTRUCTION MEETING.
RISER PIPE o
-
O 00 O STABILIZED CONSTRUCTION
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE o��oo° o °p
r \ p \ o ENTRANCE I
r; ELEV. 37.4 N CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). u �+
I /, ` �I1 Y .0 N
SEDIMENT -I SEDIMENT TRAP LOCATED WITHIN THE B CONSTRUCTION FENCE o `O
4a 3'•1 I 3. FLAG OR FENCE CLEARING LIMITS. c o "�
1 rn �r. t STORAGE �V PERMANENT DETENTION POND C2.2 W
I' .' 1 v (TYP %) ;jl' a ,' v TESC VOLUME REQUIRED: 3,523 CF - X FILTER FABRIC FENCING o
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
\v v TESC VOLUME PROVIDED: 15,000± CF o
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). ® CATCH BASIN PROTECTION c y c
TEMPORARY CONSTRUCTION FENCE c° j ° N
M s . 6. INSTALL PERIMETER PROTECTION ( SILT FENCE, BRUSH BARRIER, ETC.) . DRAINAGE SWALE FILTER #WC i (TYP.) .c N
n c Q1
" A DIVIDER
7. CONSTRUCT SEDIMENT PONDS AND TRAPS. 12° DIP CULVERT c 3
I
+'II l I CONSTRUCTION ENTRANCE A ��_ C
\ ,•, 1 ( ^�� `�,, i I w ,III llj ll', (TYP•) C2.1 °� L
e 8. GRADE AND STABILIZE CONSTRUCTION ROADS. CHECK DAM o 0 0 o
offfIf
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) P RISER PIPE e
\ a I'll SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. ° z 6
1 = CLEARING LIMIT 2
\ " \ I 'I 'Io 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE o
SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. G.
m a
III n•
T\ .PARRIERS'Skl/�Lt fiE `, 00$ Ot \ L� '' (�j DAM CQ2 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE
` \ CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE <� m
v -FGEb A WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
v RyA4S YILONG� G�, k ` �, _ �. _s�� 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE
�. 6TER EA9RIE ENCEr - I a; DRY SEASON OR TWO DAYS DURING THE WET SEASON NTH STRAW, WOOD FIBER MULCH, �rstTS�O
A&AEOU D Y,\ �'.AAI�, I �� .,�I COMPOST, PLASTIC SHEETING OR EQUIVALENT.r�� ,�14
'� ^. v � . 1►�SPECTDR vv t �Ii I
f p� ✓ 1 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
EROSION AND SEDIMENT CONTROL NOTES
N,� I I,.'I j i 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
NivgRA ret aF' ) I
111
I 1. DUST CONTROL: PREVENTATIVE MEASURES TO Z
MINIMIZE WIND TRANSPORT OF SOIL SHALL BE 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND U) O
F e ' P N' I44I 'mM R IMPLEMENTED WHEN A TRAFFIC HAZARD MAY BE BMPS REMOVED IF APPROPRIATE.
!_ \ 'I j CREATED OR WHEN SEDIMENT TRANSPORTED BY 16. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE Z Z U
rrftu a�� 4 II'1,� I WIND IS LIKELY TO BE DEPOSITED IN WATER DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH Rm374103 w J i m RESOURCES 2009 KCSWDM APPENDIX D.3 .
I I „ ( ) 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30) J
`, S� �l« �bpf I m h a 'I I SHALL BE IMMEDIATELY STABILIZED WITHTHE APPROVED ESC COVER METHODS (E.G., Q (n
SEEDING, MULCHING, PLASTIC COVERING, ETC.
li pl�, NJOIGOia� tr \ _J` I / III II ( °!tl 11 )• Z
; `' . „, ,/z eP ss 17. DURING THE TIME PERIOD OF OCTOBER 1STTHROUGH MARCH 30TH, ALL PROJECT Z W = �”
i' „, I I I J I !I l'- „„ o I, ; E ; ' " ° DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN — O ~
'r 1
+ ; -Iff
d' ! ^ II II - 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. z
l' r I p_ f`J ' 1 1/,' A2 S
.I I I I I w Y
t p, � I n
I
, 1
_ 1
h
- - - - _
- - _ -_ __ __ _ e nuc -ias - � - ec`cxear � -`, �.'Y 1 1 (i Z W ^T
\ \_ _e n`a,__ -__ __, - _ - - ,83 r f _ ---I 1�— � Z °� D
Lam' \ \� _ - .. aa_ a _ _ Q Y [' a '
o •%' -r-. T-i / r . \\ \\ � \ -' ¢ � _ _ _ _ ''- _- �:..q -..�— _ � _� - (�a 0 3e �'�� ,il , \ �. W
e
- - -" D
<,- r.,. Lr, _ `�, _ ! �ca�fi. '`�� —�— _1NTER•'1.`EP ,, �SI1=LF _ �• -_ -_�, — _== �A?��{�fSIN�R��C110 � ,,1 z
J �E
:r -Jam -.._ a a o�, -- .�LTYP�— — G2.' - l0�°_`fi
u
__sa V ` SE isO'.H Elf.
SE 18OTH v
STREET �F'; .�3\ - -- C:)
Q LO
_ _
risQTY. ST a r /m, - _ ` —
7 n + y -
v�r I t / I A A _.... L3 I ' � CMICREfE WPLK� /
— ° - C
T W _
I
CD co
i
- _.. _- - -� _ -- - -- - -_ _- IXUYONGISSUE
>- \ \, - _ = - - - - _ _ - _ - — -- - -- - _ -_ ° - - - / / % DESIGN DEV. 11108113
�' COORDINATION 01/15/14
BID SET 05115114
�\ t- -'' �- __ _- � "�/ �' -- - - -- _ -" - -- ` <- __ - - _ - - -- _ \ �s�lry /`3'��� i- LAND USE REVISION 06105114
�. Al ADDENDUM #1 06112114
o-
—
_ -
''. ,I s, I•,,,,, ii` \`l, t,l \.`.I\ \. ' ��-- -aee_ / / ,- _ 39v - - " -' -- - -I_ .- r__ -I -t7 A2 ADDENDUM#4 07/02114
\ ` \ '•s =i "„ I i ,'1\\ \ \' - _'/ �- _ _ _ __ \�a: — _� - -_ _ ->_ -._ % /. / -,�/ ia,� s��
UTILITY SET 07 116114
y
PERMIT REVISION / 08118114
z ,• ., 1 „ \ \ \ :• \ . _ _` / - _ / / ' / ' _ i / /j/ /� ' // ! ,� / �9., rlx o 0 15 30 60 MYLAR
`q
E 'M):r ' s 1 inch = 30 fC¢t
\\\\, CITY OF RENTON
Approved by -Rate: 8Z4'/
NO
C
DATE
1
PEAMnR Slm
0..07.14
uz
6
PERMIT REVISION
07.16.14
4
PERMIT REVISION I MYIM
W.19.14
D
!
n C
1/4 SECTION NW 32 TOWNSHIP 23 RANGE 05 EROSION AND SEDIMENT CONTROL RECOMMENDED CONSTRUCTION SEQUENCE
LEGEND
1. PRE - CONSTRUCTION MEETING.
RISER PIPE o
-
O 00 O STABILIZED CONSTRUCTION
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE o��oo° o °p
r \ p \ o ENTRANCE I
r; ELEV. 37.4 N CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). u �+
I /, ` �I1 Y .0 N
SEDIMENT -I SEDIMENT TRAP LOCATED WITHIN THE B CONSTRUCTION FENCE o `O
4a 3'•1 I 3. FLAG OR FENCE CLEARING LIMITS. c o "�
1 rn �r. t STORAGE �V PERMANENT DETENTION POND C2.2 W
I' .' 1 v (TYP %) ;jl' a ,' v TESC VOLUME REQUIRED: 3,523 CF - X FILTER FABRIC FENCING o
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
\v v TESC VOLUME PROVIDED: 15,000± CF o
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). ® CATCH BASIN PROTECTION c y c
TEMPORARY CONSTRUCTION FENCE c° j ° N
M s . 6. INSTALL PERIMETER PROTECTION ( SILT FENCE, BRUSH BARRIER, ETC.) . DRAINAGE SWALE FILTER #WC i (TYP.) .c N
n c Q1
" A DIVIDER
7. CONSTRUCT SEDIMENT PONDS AND TRAPS. 12° DIP CULVERT c 3
I
+'II l I CONSTRUCTION ENTRANCE A ��_ C
\ ,•, 1 ( ^�� `�,, i I w ,III llj ll', (TYP•) C2.1 °� L
e 8. GRADE AND STABILIZE CONSTRUCTION ROADS. CHECK DAM o 0 0 o
offfIf
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) P RISER PIPE e
\ a I'll SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. ° z 6
1 = CLEARING LIMIT 2
\ " \ I 'I 'Io 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE o
SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. G.
m a
III n•
T\ .PARRIERS'Skl/�Lt fiE `, 00$ Ot \ L� '' (�j DAM CQ2 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE
` \ CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE <� m
v -FGEb A WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
v RyA4S YILONG� G�, k ` �, _ �. _s�� 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE
�. 6TER EA9RIE ENCEr - I a; DRY SEASON OR TWO DAYS DURING THE WET SEASON NTH STRAW, WOOD FIBER MULCH, �rstTS�O
A&AEOU D Y,\ �'.AAI�, I �� .,�I COMPOST, PLASTIC SHEETING OR EQUIVALENT.r�� ,�14
'� ^. v � . 1►�SPECTDR vv t �Ii I
f p� ✓ 1 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
EROSION AND SEDIMENT CONTROL NOTES
N,� I I,.'I j i 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
NivgRA ret aF' ) I
111
I 1. DUST CONTROL: PREVENTATIVE MEASURES TO Z
MINIMIZE WIND TRANSPORT OF SOIL SHALL BE 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND U) O
F e ' P N' I44I 'mM R IMPLEMENTED WHEN A TRAFFIC HAZARD MAY BE BMPS REMOVED IF APPROPRIATE.
!_ \ 'I j CREATED OR WHEN SEDIMENT TRANSPORTED BY 16. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE Z Z U
rrftu a�� 4 II'1,� I WIND IS LIKELY TO BE DEPOSITED IN WATER DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH Rm374103 w J i m RESOURCES 2009 KCSWDM APPENDIX D.3 .
I I „ ( ) 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH SEPTEMBER 30) J
`, S� �l« �bpf I m h a 'I I SHALL BE IMMEDIATELY STABILIZED WITHTHE APPROVED ESC COVER METHODS (E.G., Q (n
SEEDING, MULCHING, PLASTIC COVERING, ETC.
li pl�, NJOIGOia� tr \ _J` I / III II ( °!tl 11 )• Z
; `' . „, ,/z eP ss 17. DURING THE TIME PERIOD OF OCTOBER 1STTHROUGH MARCH 30TH, ALL PROJECT Z W = �”
i' „, I I I J I !I l'- „„ o I, ; E ; ' " ° DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN — O ~
'r 1
+ ; -Iff
d' ! ^ II II - 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. z
l' r I p_ f`J ' 1 1/,' A2 S
.I I I I I w Y
t p, � I n
I
, 1
_ 1
h
- - - - _
- - _ -_ __ __ _ e nuc -ias - � - ec`cxear � -`, �.'Y 1 1 (i Z W ^T
\ \_ _e n`a,__ -__ __, - _ - - ,83 r f _ ---I 1�— � Z °� D
Lam' \ \� _ - .. aa_ a _ _ Q Y [' a '
o •%' -r-. T-i / r . \\ \\ � \ -' ¢ � _ _ _ _ ''- _- �:..q -..�— _ � _� - (�a 0 3e �'�� ,il , \ �. W
e
- - -" D
<,- r.,. Lr, _ `�, _ ! �ca�fi. '`�� —�— _1NTER•'1.`EP ,, �SI1=LF _ �• -_ -_�, — _== �A?��{�fSIN�R��C110 � ,,1 z
J �E
:r -Jam -.._ a a o�, -- .�LTYP�— — G2.' - l0�°_`fi
u
__sa V ` SE isO'.H Elf.
SE 18OTH v
STREET �F'; .�3\ - -- C:)
Q LO
_ _
risQTY. ST a r /m, - _ ` —
7 n + y -
v�r I t / I A A _.... L3 I ' � CMICREfE WPLK� /
— ° - C
T W _
I
CD co
i
- _.. _- - -� _ -- - -- - -_ _- IXUYONGISSUE
>- \ \, - _ = - - - - _ _ - _ - — -- - -- - _ -_ ° - - - / / % DESIGN DEV. 11108113
�' COORDINATION 01/15/14
BID SET 05115114
�\ t- -'' �- __ _- � "�/ �' -- - - -- _ -" - -- ` <- __ - - _ - - -- _ \ �s�lry /`3'��� i- LAND USE REVISION 06105114
�. Al ADDENDUM #1 06112114
o-
—
_ -
''. ,I s, I•,,,,, ii` \`l, t,l \.`.I\ \. ' ��-- -aee_ / / ,- _ 39v - - " -' -- - -I_ .- r__ -I -t7 A2 ADDENDUM#4 07/02114
\ ` \ '•s =i "„ I i ,'1\\ \ \' - _'/ �- _ _ _ __ \�a: — _� - -_ _ ->_ -._ % /. / -,�/ ia,� s��
UTILITY SET 07 116114
y
PERMIT REVISION / 08118114
z ,• ., 1 „ \ \ \ :• \ . _ _` / - _ / / ' / ' _ i / /j/ /� ' // ! ,� / �9., rlx o 0 15 30 60 MYLAR
`q
E 'M):r ' s 1 inch = 30 fC¢t
\\\\, CITY OF RENTON
Approved by -Rate: 8Z4'/
NO
REV
DATE
1
PEAMnR Slm
0..07.14
3
PERMIT REVISION
07.16.14
4
PERMIT REVISION I MYIM
W.19.14
D
!
n C
/ ' _ /"mil �.-
7.
4wx Call 811
Approved y Date. before n,' Y 9 Y
� _� -� $
A� AA Yc �:� vAA. a �� v _� _ -sn oar _ - -- �'C
\\ ✓ \ \ " - �'_ _ ;\`S�� .� «< SCALE: AS NOTED
! -'asE - -- - _ " — �yU� -a,. -° °" _ -CS-cr i `�..� - . % i % '\ Approved by: Date: PLOT DATE:
PROTECV SLOPE DURING CONSTRUT a r a,.,, J ` r - - -� g" _ 08/19/14
_ r,�=a PRINCIPAL
OF SANITARY'SEWER PER EROSION __- MAV
\ - - - - s: _ PROJ. MGR:
CONTROL -NOTES AND /OR AS REQUIRED j� fi a 3 _ _ y� _ _ Approved by: Date: AGC
CITY /BOOS CREE�C INSPElTOR SEE \ _ -_ _ _ _ _ «! ' _' s \ „ „ .^ P 64 DRAFTER TAD
LANDSCAPE F> RESTCfRAT10N DETA16S , `vim s - TRIAD w ;� ,,, b4e
- JIM CITY OF VANTAGE POINT APARTMENTS
o. AS NOTED D��T 8 -19 -2014
AGC SZ 1�G1� 1l/l�
ON SITE IMPROVEMENT PLANS
TAD �� DATUM arlo Nz
SZ Planning /Building /Public Works Dept. TESC PLAN C2,0
NO. REVISION BY DATE APPR
AM � � '�` 3 °5 61
CD: r2- 3 7 kt I 0-;�,
y
oa
D
!
n C
a
zJ
g�