SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE
IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY
OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH
THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF
VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S)
SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN
THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH
APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND
OBSERVED DURING CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS
SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR
FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED
AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES,
SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH
PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS
ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY
DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL
FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR
TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
TRANSPORTATION OF SEDIMENT TO SURFACE WATER,
DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL
EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED
INA SA77SFACTORY CONDITION UNTIL SUCH TIME THAT
CLEARING AND/OR CONSTRUCTION IS COMPLETE AND
POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE
IMPLEMENTATION, MAINTENANCE, REPLACEMENTAND
ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS
SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS
DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT
MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
WILL BE NECESSARY TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW
CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND
TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT
ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION
CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF
STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
B. ANYAREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO
DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH
MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON
APRIL IST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESC COVER METHODS (E. G.,
SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL
REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES
CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE,
UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN
ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH
APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
11. ANYAREA NEEDING ESC MEASURES, NOT REQUIRING
IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN
7) DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED
AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN
24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE
ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED
PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT
FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM
SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH
30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT
ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS,
SHALL BE COVERED BY MULCH, SODDING OR PLASTIC
COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A
TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE
NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY IF THE PERMANENT
FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED
SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET
ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL
DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH
ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE
WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH
MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF
RENTON FOR REVIEW.
HN IN FILTER FABRIC NNAUL BE SPLICED
FIN. FE
QL.FNTr..FxFI9R:C TO
MRr ISIN `^
E )--
M
clx Fnewc
FI
2Y WP]O
DApi1LLnEMN M1111
wsTSP,cwcmwv BE lNCRFwsFD
xanrs sDL /
r wsFexce /
Po6T5, RFHI.4ORB.I.BEOYVAt£N!
NOTES1. CONDRIONOFUSE
11.
1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
2 SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENOEDTO TREAT SUBSTANTIALAMWNTS OF OVERLAND FLOW.
ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TOA SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTE%TILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE
AVAILABLE ON SITE,
soslurmwml
sl[v-.e`.EWMN`esnrnun
bio PY IRIP JD1 AWUO
cert
aTms.
N' 13B Re RESTANDARDSTNIGHTFAIRC
R I ro:M
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE WIRE BACKING OR CLOSER POST
SPACING MAY BE REQUIRED FOR EKTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS INSTALLED. THE SLOPES. NOT BE STEEPERTHAN 2HAV
24. IFA WPICAL SILT FENCE IS USED, THE STANDAR04M TRENCH MY NOT BE REDUCED AS LONG AS THE BOTTOMS INCHES OF THE SILT FENCE
IS WELL BURIED AND SECURE INA TRENCH THAT STABILIZES THE FENCE AND GOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT
FENCE.
3. MNNTENANCESTANOAROS
3.1. MY DAMAGE SHALL BE REPAIR IMMEDIATELY.
3 IF CONCENTRATED FLOES ARE EVIDENT UPHILL 00 THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TOA SEDIMENT TRAP OR PWO.
B3 IT IS IMPORTANT RRITOCHECKTHEUPHILLSIDEOFTHEFENCEFORSIGNSOFTHEFENCECLOGGINGANDACTINGASABAER TO FLOWAND
THEN CAUSING CHANNELIZATION OF ROWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP
SEDIMENT.
31, SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS B INCHES HIGH.
3.5. IF THE FILTER FABRIC NGEOTEMILE) HAS DETERIORATED DUE TO ULTRAVIOLET OREPI(DOWN.IT SHALL BE REPLACED
4/ .6 SID. PLAN - 214.ODTPUBLICSILTFENCE
MARCH 2008
DEPARTMENT
ga
P<Y6D TD -EDGEEE
C
clow
NSHR rnoNENTRVFCTO.
ErxF
fJs
CANASNOOFmEnwP,YAY
D E1.1RC
F.2V MIN BEEFOM'ED Be TINTANIDRNxsOFFTIEPED
8.
AT DER U.v sFn r. As
PFn GM1ROMsrumNas
savant sews
GEOrE%RE
ISNW 1Nq(IE66 \ gpV,DE"'..MDF
xorBB ixcRssshDuss NPA
1. CONDRIONOFUSE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILQED WHENEVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WTRIIN 1,000 FEET OF THE SITE.
2. DESIGNANDINSTALLATIONSPECIRCATIONS
2.1. HOG FUEL NWOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED
FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY
ATANYTIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
22. FENCINGSHALLBE ANCE. INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTR
23. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM. COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY
INCREASE THE EFFECTIVENESS OF THE PAD AND REWCE THE NEED FOR MAINTENANCE.
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PPD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
32. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE
STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE
ENTRANCE. OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED. R SHALL BE DONE ON AN AREA COVERED WITH
CRUSHED ROCK. AND WASHED WATER SHALL GRAIN TO A SEDIMENT TRAP OR POND.
3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY
SWEEPING SHALL BE REMOVED OR STABILIZED ON SUE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
UCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS ATHREAT TO PUBLIC SAFETY IF IT NECESSARY TO WASH THE STREETS, A
SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT MOULD THEN BE WASHED INTO THE SUMP WHERE U CAN BE CONTROLLED AND
DISCHARGEDAPPROPRNTELY.
3.4. ANY QUARRY SPALLS THAT ME LOOSENED FROM THE PAD AND ENO UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING OR EXITING THE SUES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE
INSTALLED TO CONTROL TRAFFIC,
PUBLIC WORKS STABILIZED
STD. PIAN - 216.10
DEPARTMENT CONSTRUCTION ENTRANCE
MARCH 2008
1. CONDITIONOFUSE
1.1. SHALL BE PROVIOED FOR ALL STORM DRAIN INLETS DOMISLOPE AND WIlHN SCO FEET OF A DISTURBED OR CONSR,IICTIDNAREA UNLESS
THE RUNOFF THAT ENTERS THE CATCHBASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRM.
I2 MAY SE WED MYW'NERE AT THE APPLICANTS DISCRETION TO PROTECT DRAIII SYSTEM
1.3. THE CONIRIBUTING DRNNAGE AREA MOST NOT BE URGER THAN I ACRE
2. DEBWHANDINSTALLATNINSPEWIGTNN,6
2.1. FILMRFMRICBONLYALLOWEOWEREPONDINGWILLNOTBEATR.YFFICCONCERNANDVABME$CPEEROSICNNVLNDTRESULTWME
CURB IS OVERTOPPED BY PONDEO WATER
2.2 THE PLACEMENT OFA RLWRFABRIC UNDER GRATES IS GENERALLY PROBSITEDANDTHE USE OF FILTER FABRICOJER(tlU MSTRICRY
LIMITED AND DISC W RAGED.
1 M/JNIEMMICEBTANDARDB
3.1. AWACCUMULATEDSEDIMENT ON BR AROUND INLET PROTECTION SHALL BE REMOVED IMIEDNTELY. SFDMFM SINLL NOT BE REMOVED
MH WATER AND ALL SEDIMENT MUST BE DISPOSED OF AS FlLL ON SIZE M H1LLED OFF SITE
PUBLIC WORKS FILTER FABRIC PROTECTION '
PLAN - 216'20
DEPARTMENT
MARCH 2008
ONES EEENOTE1 VArors SECONNUCTPIANS
mm')
GROOMED
N'E%I BER ONr IrYRI-IVENMY
p rIEi INORU'Ri-' BE A. SEENME Imo' P.B.FlNIY4IttP1 EN".'
BE.6PF FdNCONIRfL11- 6ff arArneNDnaxo-laNa
J 6IDEwPLKmPi
CENIENTOORKE CAMe. CENFEIE
rcol ITEPI-E
NAE CONTRA
TFNIDrH
NZ FSFEmx T
Iw4sIFF-
I cENA31i CAN61ETE cuRe J ` CENvNWBR nthYa
PLV, VIEW B. cPvsNmFlt eIF aONnER l6EE.xarexT 5'.v x':6 1
TYPE.'i ..Te.JCNENMMNOTES : EYE) ME)
D ... 0 6LED'E"'I
14 MX 6EF mrEa VME6 sE2
I, Aheel Ne III Width eAseeM 15}eet mnabue afull Seem PLANVIEW
CONTPAEr P4N5.
TYPESN, SMIWip PLN F.10,(KtmEM:: erplJoIns llne.
N¢- 1I1141EEPE0.IN WI
BR K P+T^MI Bite HIS MrlerYl0ffi UI 16 feel TEST. EEEGNURAIIPLANS SEE CONrRAGr
RIMSf/
P VAa LIPEETNEd
da{`Wk bIE - RLNOORnOF B3NIMA' : WEtleB MtAnalMWaY.WblM axmeU30 bM. ^ :p.0'NM "+.. : •. j YRWiMCiHAY6
2. SM Slanehl Plan iFMt0 W alewalN!MEIN. IT R. MPU IT^ OEPRFbtiE.N.,
1EOE51RLLV RNP 3. QM.W 5uM)M .h.; IFS Sol Fane fO See ]
Di_NAZ • IC / q'RIEn 16EE NOTE S1
l FE SIINW RA'P1% OMDE .38'FIOAISpXAINi1ttP.1
cluDea"..Bacmat. GBe BhMRM penF 10.12 S - .
TFlldiOtlMAETE O _ Av
CUM
dMth,
E EE
NOTEY
mEWNK(Mj. SNgAK SECTION A-•6EErtA1tlEOxIMF.]L10
SEE xmE TI mEwAix
d AwbplaoNg ErelnSpD abugla illa101 nbDHz y6'. EXPNL4NNN lCq!(Nml- \INW''WF`T fYYP1)Y NU[uP:BElNSF11 her btrlWut fElwx-em..buClR Beem..6EE siAwubPux Fe¢IO Y`CTION OC
aoAlxv,Ar TAnTMIa wRe,
EEE f £EE MRe l`qe SFT: LgRMpT RW6 6. See neWI' th SRI adaant SL Ol4NM1eesS ll W
flet
Gla
1?0.
P.M.RAxs PUHs. 4q tehwn tlx M atllNsenl surhm plants stay be flush.
cePAEssEDcueN
The _ _ lfYP!
660 CCNtRaeT PlAnvc aAxsVxL b
r
T 6 ranp'
wpIMile
W xrANtl lS
faNtV
Sees NNfleing
lnBr,
slpT¢INS LEGEND
Z N4eNrimN wNaNrmn bete Sletles V.Nenstl6
bstiLCPEM
NINE40gECTgM
DRn'Evur IUYP'•.
T •....•.. ...': :'
of v rnaN 16 Net max RONBee r nMrg bpe BY L. BgR
P slMll Ile M flat as IeauhY. 4g' ra Y,3y, - , L IMNBWY SgIXnPuaRn'PUN Em. T. PmE coeemlbclWetlrlwweY O'P jilt
l (SEEmtE]f OSECTION
See CmPatl PlxM.
cNExr ETYPG PAY
US +
tumor cOrI6 I?
Almwv
ENIMNCETYPE t'PAY WIIS.I ErtP4iCe ttFEPPAnlaxls
DRUISMQ, OTMfl
leEEmrBA EE mrEf - N6D` -^' CEMENT CONCRETE
3 MYLARS I BML
2 REVTSED PER CTTY OF RENTON COMMENTS, DATED 06/16/2014 BML
1 REVISED PER CITY OF RENTON COMMENTS, DATED 06/11/2014 BML
NO. REVISION BY
DRIVEWAY ENTRANCE
a,DobeoxcRElE CL V CONCRETE TYPES 1, 2, 3 1114
PER ATANIY.Mt .. FTR .srtGFA6.i
STANDARD PLAN F•11110.1042
6HEElIOFx6HEET3
MPROKS FOR PIALIWTp1
PaaeD BaANRkh 111 0.L15-12
ETWICNEW ISOMETRIC VIEW
mm0`°°A `
TYPE t PAY UIIFM TYPE 2- PAY LIMITS
w..w.•.>•.°wr*..Y l..o.r.
SORMEBD: SVNF.
BEYLER CONSULT.wDN:a HARD 1m6
O sM m
1.1 =201=2D' Nolaxim : TMD IM3/1aa1
08/13/14 BML
06/22/14 SAP
06/27/14 o¢1MD, I
BML
DATUM
SECTORS. E T O SOLE
DATE APPR 3w mm wN-
Emod
E ""`Lr
LCB
CITY OF
NIL RENTON
Planning/Building/Public Works Dept.
R-374603
CITY OF RENTON
APPROVED BY:
APPROVED
APPROVED
MELROSE SHORT PLAT
CONSTRUCTION PLANS
U14002532
TESC NOTES AND DETAILS
CD: 2_ '3'7u603
DATE:
GATE:
DATE:
5/6/2014
A"D NA
DM.xO
C3
MN4T: 3 .7