HomeMy WebLinkAboutR-364603H u CL a J Ir 0 VJ w V) M0 J W 2 SOURCE: CITY OF RENTON AMENDMENTS TO THE KING CO SWDM, REFERENCE 7-B 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED INA SA77SFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENTAND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. B. ANYAREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON APRIL IST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E. G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11. ANYAREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN 7) DAYS. 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. HN IN FILTER FABRIC NNAUL BE SPLICED FIN. FE QL.FNTr..FxFI9R:C TO MRr ISIN `^ E )-- M clx Fnewc FI 2Y WP]O DApi1LLnEMN M1111 wsTSP,cwcmwv BE lNCRFwsFD xanrs sDL / r wsFexce / Po6T5, RFHI.4ORB.I.BEOYVAt£N! NOTES1. CONDRIONOFUSE 11. 1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 2 SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENOEDTO TREAT SUBSTANTIALAMWNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TOA SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTE%TILE USED MOST MET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE AVAILABLE ON SITE, soslurmwml sl[v-.e`.EWMN`esnrnun bio PY IRIP JD1 AWUO cert aTms. N' 13B Re RESTANDARDSTNIGHTFAIRC R I ro:M 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EKTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED. THE SLOPES. NOT BE STEEPERTHAN 2HAV 24. IFA WPICAL SILT FENCE IS USED, THE STANDAR04M TRENCH MY NOT BE REDUCED AS LONG AS THE BOTTOMS INCHES OF THE SILT FENCE IS WELL BURIED AND SECURE INA TRENCH THAT STABILIZES THE FENCE AND GOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 3. MNNTENANCESTANOAROS 3.1. MY DAMAGE SHALL BE REPAIR IMMEDIATELY. 3 IF CONCENTRATED FLOES ARE EVIDENT UPHILL 00 THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TOA SEDIMENT TRAP OR PWO. B3 IT IS IMPORTANT RRITOCHECKTHEUPHILLSIDEOFTHEFENCEFORSIGNSOFTHEFENCECLOGGINGANDACTINGASABAER TO FLOWAND THEN CAUSING CHANNELIZATION OF ROWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP SEDIMENT. 31, SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS B INCHES HIGH. 3.5. IF THE FILTER FABRIC NGEOTEMILE) HAS DETERIORATED DUE TO ULTRAVIOLET OREPI(DOWN.IT SHALL BE REPLACED 4/ .6 SID. PLAN - 214.ODTPUBLICSILTFENCE MARCH 2008 DEPARTMENT ga P<Y6D TD -EDGEEE C clow NSHR rnoNENTRVFCTO. ErxF fJs CANASNOOFmEnwP,YAY D E1.1RC F.2V MIN BEEFOM'ED Be TINTANIDRNxsOFFTIEPED 8. AT DER U.v sFn r. As PFn GM1ROMsrumNas savant sews GEOrE%RE ISNW 1Nq(IE66 \ gpV,DE"'..MDF xorBB ixcRssshDuss NPA 1. CONDRIONOFUSE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILQED WHENEVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WTRIIN 1,000 FEET OF THE SITE. 2. DESIGNANDINSTALLATIONSPECIRCATIONS 2.1. HOG FUEL NWOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY ATANYTIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 22. FENCINGSHALLBE ANCE. INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTR 23. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM. COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REWCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PPD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 32. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE. OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED. R SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK. AND WASHED WATER SHALL GRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SUE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, UCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS ATHREAT TO PUBLIC SAFETY IF IT NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONDUCTED. THE SEDIMENT MOULD THEN BE WASHED INTO THE SUMP WHERE U CAN BE CONTROLLED AND DISCHARGEDAPPROPRNTELY. 3.4. ANY QUARRY SPALLS THAT ME LOOSENED FROM THE PAD AND ENO UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SUES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC, PUBLIC WORKS STABILIZED STD. PIAN - 216.10 DEPARTMENT CONSTRUCTION ENTRANCE MARCH 2008 1. CONDITIONOFUSE 1.1. SHALL BE PROVIOED FOR ALL STORM DRAIN INLETS DOMISLOPE AND WIlHN SCO FEET OF A DISTURBED OR CONSR,IICTIDNAREA UNLESS THE RUNOFF THAT ENTERS THE CATCHBASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRM. I2 MAY SE WED MYW'NERE AT THE APPLICANTS DISCRETION TO PROTECT DRAIII SYSTEM 1.3. THE CONIRIBUTING DRNNAGE AREA MOST NOT BE URGER THAN I ACRE 2. DEBWHANDINSTALLATNINSPEWIGTNN,6 2.1. FILMRFMRICBONLYALLOWEOWEREPONDINGWILLNOTBEATR.YFFICCONCERNANDVABME$CPEEROSICNNVLNDTRESULTWME CURB IS OVERTOPPED BY PONDEO WATER 2.2 THE PLACEMENT OFA RLWRFABRIC UNDER GRATES IS GENERALLY PROBSITEDANDTHE USE OF FILTER FABRICOJER(tlU MSTRICRY LIMITED AND DISC W RAGED. 1 M/JNIEMMICEBTANDARDB 3.1. AWACCUMULATEDSEDIMENT ON BR AROUND INLET PROTECTION SHALL BE REMOVED IMIEDNTELY. SFDMFM SINLL NOT BE REMOVED MH WATER AND ALL SEDIMENT MUST BE DISPOSED OF AS FlLL ON SIZE M H1LLED OFF SITE PUBLIC WORKS FILTER FABRIC PROTECTION ' PLAN - 216'20 DEPARTMENT MARCH 2008 ONES EEENOTE1 VArors SECONNUCTPIANS mm') GROOMED N'E%I BER ONr IrYRI-IVENMY p rIEi INORU'Ri-' BE A. SEENME Imo' P.B.FlNIY4IttP1 EN".' BE.6PF FdNCONIRfL11- 6ff arArneNDnaxo-laNa J 6IDEwPLKmPi CENIENTOORKE CAMe. CENFEIE rcol ITEPI-E NAE CONTRA TFNIDrH NZ FSFEmx T Iw4sIFF- I cENA31i CAN61ETE cuRe J ` CENvNWBR nthYa PLV, VIEW B. cPvsNmFlt eIF aONnER l6EE.xarexT 5'.v x':6 1 TYPE.'i ..Te.JCNENMMNOTES : EYE) ME) D ... 0 6LED'E"'I 14 MX 6EF mrEa VME6 sE2 I, Aheel Ne III Width eAseeM 15}eet mnabue afull Seem PLANVIEW CONTPAEr P4N5. TYPESN, SMIWip PLN F.10,(KtmEM:: erplJoIns llne. N¢- 1I1141EEPE0.IN WI BR K P+T^MI Bite HIS MrlerYl0ffi UI 16 feel TEST. EEEGNURAIIPLANS SEE CONrRAGr RIMSf/ P VAa LIPEETNEd da{`Wk bIE - RLNOORnOF B3NIMA' : WEtleB MtAnalMWaY.WblM axmeU30 bM. ^ :p.0'NM "+.. : •. j YRWiMCiHAY6 2. SM Slanehl Plan iFMt0 W alewalN!MEIN. IT R. MPU IT^ OEPRFbtiE.N., 1EOE51RLLV RNP 3. QM.W 5uM)M .h.; IFS Sol Fane fO See ] Di_NAZ • IC / q'RIEn 16EE NOTE S1 l FE SIINW RA'P1% OMDE .38'FIOAISpXAINi1ttP.1 cluDea"..Bacmat. GBe BhMRM penF 10.12 S - . TFlldiOtlMAETE O _ Av CUM dMth, E EE NOTEY mEWNK(Mj. SNgAK SECTION A-•6EErtA1tlEOxIMF.]L10 SEE xmE TI mEwAix d AwbplaoNg ErelnSpD abugla illa101 nbDHz y6'. EXPNL4NNN lCq!(Nml- \INW''WF`T fYYP1)Y NU[uP:BElNSF11 her btrlWut fElwx-em..buClR Beem..6EE siAwubPux Fe¢IO Y`CTION OC aoAlxv,Ar TAnTMIa wRe, EEE f £EE MRe l`qe SFT: LgRMpT RW6 6. See neWI' th SRI adaant SL Ol4NM1eesS ll W flet Gla 1?0. P.M.RAxs PUHs. 4q tehwn tlx M atllNsenl surhm plants stay be flush. cePAEssEDcueN The _ _ lfYP! 660 CCNtRaeT PlAnvc aAxsVxL b r T 6 ranp' wpIMile W xrANtl lS faNtV Sees NNfleing lnBr, slpT¢INS LEGEND Z N4eNrimN wNaNrmn bete Sletles V.Nenstl6 bstiLCPEM NINE40gECTgM DRn'Evur IUYP'•. T •....•.. ...': :' of v rnaN 16 Net max RONBee r nMrg bpe BY L. BgR P slMll Ile M flat as IeauhY. 4g' ra Y,3y, - , L IMNBWY SgIXnPuaRn'PUN Em. T. PmE coeemlbclWetlrlwweY O'P jilt l (SEEmtE]f OSECTION See CmPatl PlxM. cNExr ETYPG PAY US + tumor cOrI6 I? Almwv ENIMNCETYPE t'PAY WIIS.I ErtP4iCe ttFEPPAnlaxls DRUISMQ, OTMfl leEEmrBA EE mrEf - N6D` -^' CEMENT CONCRETE 3 MYLARS I BML 2 REVTSED PER CTTY OF RENTON COMMENTS, DATED 06/16/2014 BML 1 REVISED PER CITY OF RENTON COMMENTS, DATED 06/11/2014 BML NO. REVISION BY DRIVEWAY ENTRANCE a,DobeoxcRElE CL V CONCRETE TYPES 1, 2, 3 1114 PER ATANIY.Mt .. FTR .srtGFA6.i STANDARD PLAN F•11110.1042 6HEElIOFx6HEET3 MPROKS FOR PIALIWTp1 PaaeD BaANRkh 111 0.L15-12 ETWICNEW ISOMETRIC VIEW mm0`°°A ` TYPE t PAY UIIFM TYPE 2- PAY LIMITS w..w.•.>•.°wr*..Y l..o.r. SORMEBD: SVNF. BEYLER CONSULT.wDN:a HARD 1m6 O sM m 1.1 =201=2D' Nolaxim : TMD IM3/1aa1 08/13/14 BML 06/22/14 SAP 06/27/14 o¢1MD, I BML DATUM SECTORS. E T O SOLE DATE APPR 3w mm wN- Emod E ""`Lr LCB CITY OF NIL RENTON Planning/Building/Public Works Dept. R-374603 CITY OF RENTON APPROVED BY: APPROVED APPROVED MELROSE SHORT PLAT CONSTRUCTION PLANS U14002532 TESC NOTES AND DETAILS CD: 2_ '3'7u603 DATE: GATE: DATE: 5/6/2014 A"D NA DM.xO C3 MN4T: 3 .7 NNNNA