1, CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE..
GRAB TENSRf 5TRESNGTX IA5TM OtT 53
1 W PL MN;
GMBTENAIE ELONGATION IASTM 096321
MMA)r.
NUII£N SURSfSTRENGTN ASTM0.TT8681W
9WP51 INN
4GSiA5TMDfTSD
2 4SJUS.STANDARDSI F EFL I
D4YklVAX65HFLL0EPAV£O'N.nIEED61
EXTERIOR USE ONLY
_gyp
^
C.ST" Z,,k1 R.C.E10I DFTJ1[
OONbYNL1t119R 6NiR4J0F. SOPVG9
v
CONNECT TO STORM a:
C� ��
tlAplAGlx(;ylp lid RtlAUNAY
CONVEYANCE SYSTEM.
i N
ITT RFf. MAT THE
BUILDING FOOTING:
R"25'IAV, \
ESE CiIEDWAE
TCR9D BOTYA2
SEE STRUCT'L PLANS
ro
RIM."OFF DRmkS OFF T{E Vl,a
MTNt O.iVE'NAYCHLVEPTWF Vk6
I6 A i 9Nl9DE C9iCN %ic6FAT. AS
PER dTY ftOAgSl0.VpNi0.5
l'd'gUARRY6PPLL5 '
GFAWmRq \
�F
iruuTwavEss PRovIDr Fl,u wvmnlcF
N DTP$ w'GReS .RE53 ARBA
1, CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE..
GRAB TENSRf 5TRESNGTX IA5TM OtT 53
1 W PL MN;
GMBTENAIE ELONGATION IASTM 096321
MMA)r.
NUII£N SURSfSTRENGTN ASTM0.TT8681W
9WP51 INN
4GSiA5TMDfTSD
2 4SJUS.STANDARDSI F EFL I
2 DESIGN AND INSTALLATION SPEdFlCATIONS
2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBST.
FOR PERMANENT ROADS. HOG FUEL IS NOT RFC(
AT ANYTIME REQUIRE THE USE OF QUARRY SPA]
PAVEMENT OR IF THE HOG FUEL 19 BEING CARRIE
22. FENCING SHALL BE INSTALLED AS NECESSARY TC
22. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE
INCREASE THE EFFECTIVENESS OF THE PAD AND
3. MAINTENANCE STANDARDS
3.1.
32
33,
3A.
3.5.
CAN SUBSTANTIALLY
PUBLIC WORKS STABILIZED
.DEPARTMENT CONSTRUCTION. ENTRANCE
STD. PLAN — 216.10
MARCH 2008
SOI
NT$ 6Construction Entrance
L LAGGING - ' 6EI WEEN P
BIDDER DESIGN 3" PVC TIGHTUNE
SHORING -
BIDDER DESIGN
4" PVC FOOTING DRAIN
CONCRETE WALL
SEE STRUC'L PLANS
STRUCTURAL SLAB
ELEVATION VARIES
CONTINUOUS DRAINAGE MAT
PER ARCH'L SPECIFICATIONf
3" PJC TIGHTLINE
PROVIDE DRAINAGE MAT
AND WATERPROOFING
PER ARCH'L SPECIFICATIONS
SHORING BEAM,
LAGGING, & STUDS
BIDDER DESIGN
DRAIN GRATE
_ u
u
u
_y u
u
u
NOTE: - ii 3" PVC TIGHTLINE
PROVIDE HYDRAULIC CONNECTION
BETWEEN DRAIN MAT AND 6"
TIGHTLINE USING MIRADRAIN QUICK ii OPTION 'B'
DRAIN CONNECTION OR SIMILAR
MANUFACTURER APPROVED CONNECTION. ��% /ice//i�i� ii 6" SCM 40 PVC FORTUNE
TO SUMP PUMP
FOUNDATIONS
PER STRUC'L DRAWINGS MS
Typical Internal Footing Drain
MAK
3 DRAquat�Gw.TE 1Toni,
I I
GRATE FRAIAE
a :a
�P
SEDIMENY AM DERMS: _
A RFLM 3YPA5R
p P - SELOWINLETGWEDEOCE
FILTERED
WATER
� A
SEOTIONMEW
DRAINAOEGRATE
REMANGDNRGRATE6{WWN RETREYALSYSTHSI(TY4.)
DEtow wLET GRAT£OEVIDE OWWoriHVPASS(m)
ISDMETRICNEW
NOTES
1. SIze 111.ma.[Ole Grow D". IBIDD)]or lha6Tenn•.eaterew ro SMI,mce.
z. TM BIGD snail"ve e, WIHn N9Dldo refe sy9rem(ovei byyusry
I. The reMeval sme. roue dowremovdorin MOP uftw Nr1I lnecdecteo m"e.
.0 Petlormmalnlenance h'emDleslae Am Scaonw SpedtrnBcn 6flTd(15}:
STD. PLAN — 218:90
PUBLIC WORKS CATCH BASIN FILTER
♦y`� DEPARTMENT MARCH 200E
NTS
Catch Basin Filter 7
FABRIC SIDE OF WATERPROOFING
TOWARDS LAGGING
SEE ARCH'L
U NTS
Wall Drainage to Footing Drain Connection
COMPACTED BACKFILL SLOPE
MEETING GRADATIONREQ'TS BUILDING WALL
FOR STRUCT'L FILL (SEE NOTE 2) SEE STRUCT'L PLANS
SLOPE TO DRAIN AWAY
GRAVEL BACKRLL FOR DRAINS
00
WATERPROOFING PER ARCH'L
AND GEOTECHNICAL
PER WSDOT 9-03.12(4).
m 3
GEOTEXTILE FABRIC
6" SCH 40 PVC PERF PIPEMIRAFI
m
RECOMMENDATIONS
EXTERIOR USE ONLY
D
EQUIVALENT
v
CONNECT TO STORM a:
C
r'.2" WIN
CONVEYANCE SYSTEM.
i N
DRAIN GRATE
BUILDING FOOTING:
N
-
6" MIN
SEE STRUCT'L PLANS
6" WIN -> d
NOTES:
6" MIN
6" MIN-�
1. SEE ARCHITECTURAL PLANS FOR DRAINAGE GRAVEL
BENEATH BUILDING SLAB.
SUBDRAIN PIPE
2. STRUCTURAL FILL SHOULD CONSIST OF WELL -GRADED
1.
6" MINIMUM DIAMETER PERFORATED OR
GRANULAR SOIL WITH NOT MORE THAN 20% FINES
SLOTTED PIPE; TIGHT JOINTS; SLOPED TO DRAIN
(BY WEIGHT BASE ON 3/4" PORTION) PASSING NO. 200
(67100' MIN SLOPE); PROVIDE CLEAN -OUTS.
SIEVE (BY WEIGHT SIEVING) WITH NO PLASTIC FINES.
2.
PERFORATED PIPE HOLES (3/16" TO 1/4" 0)
3. BACKFILL WITHIN 18" OF WALL SHOULD BE COMPACTED WITH
TO BE IN LOWER HALF OF THE PIPE WITH
HAND -OPERATED EQUIPMENT. HEAVY EQUIPMENT SHOULD NOT
DISCHARGE PIPE
LOWER QUARTER SEGMENT UNPERFORATED
BE USED FOR BACKFILL, AS SUCH EQUIPMENT OPERATED
SIZED BY ARCH'L
U NTS
Wall Drainage to Footing Drain Connection
COMPACTED BACKFILL SLOPE
MEETING GRADATIONREQ'TS BUILDING WALL
FOR STRUCT'L FILL (SEE NOTE 2) SEE STRUCT'L PLANS
SLOPE TO DRAIN AWAY
GRAVEL BACKRLL FOR DRAINS
00
9
PER WSDOT 9-03.12(4).
m 3
GEOTEXTILE FABRIC
6" SCH 40 PVC PERF PIPEMIRAFI
m
140N OR
EXTERIOR USE ONLY
D
EQUIVALENT
v
CONNECT TO STORM a:
C
r'.2" WIN
CONVEYANCE SYSTEM.
i N
1
BUILDING FOOTING:
N
-
6" MIN
SEE STRUCT'L PLANS
6" WIN -> d
NOTES:
6" MIN
6" MIN-�
1. SEE ARCHITECTURAL PLANS FOR DRAINAGE GRAVEL
BENEATH BUILDING SLAB.
SUBDRAIN PIPE
2. STRUCTURAL FILL SHOULD CONSIST OF WELL -GRADED
1.
6" MINIMUM DIAMETER PERFORATED OR
GRANULAR SOIL WITH NOT MORE THAN 20% FINES
SLOTTED PIPE; TIGHT JOINTS; SLOPED TO DRAIN
(BY WEIGHT BASE ON 3/4" PORTION) PASSING NO. 200
(67100' MIN SLOPE); PROVIDE CLEAN -OUTS.
SIEVE (BY WEIGHT SIEVING) WITH NO PLASTIC FINES.
2.
PERFORATED PIPE HOLES (3/16" TO 1/4" 0)
3. BACKFILL WITHIN 18" OF WALL SHOULD BE COMPACTED WITH
TO BE IN LOWER HALF OF THE PIPE WITH
HAND -OPERATED EQUIPMENT. HEAVY EQUIPMENT SHOULD NOT
LOWER QUARTER SEGMENT UNPERFORATED
BE USED FOR BACKFILL, AS SUCH EQUIPMENT OPERATED
FOR WATER FLOW.
NEAR THE WALL COULD INCREASE LATERAL EARTH PRESSURES
3.
SLOTTED PIPE TO HAVE 1/8" MAXIMUM
AND POSSIBLY DAMAGE THE WALL.
WIDTH SLOTS.
4. ALL BACKFILL SHOULD BE PLACED IN LAYERS NOT EXCEEDING
6" LOOSE THICKNESS AND DENSELY COMPACTED. BENEATH
PAVED OR SIDEWALK AREAS, COMPACT TO AT LEAST 95%
NTS
MODIFIED PROCTOR MAXIMUM DENSITY (ASTM: D1157).
Footing Dram J
OTHERWISE COMPACT TO 90% MINIMUM.
R-37521 I
Approved By: Date: ft..zmeo
Approved By: OU Date: 4 (1 f
Approved By: Date:
Approved By: Date:
ARCHITECTS
T H A
A f` C i I E
CONSULTANT
COUGHLIN
PORTER
LUNDEEN
801 SECOND AVENUE - SUITE 900
SEATTLE, WA 98104
R 206/343-0960
F: 206/343-5691
A CONSULTING
STRUCTURAL AND CIVIL
ENGINEERING CORPORATION
STAMP
REVISION NO.
Ai PERMIT RESUBMITTAL
Q2 PERMIT RESUBMITTAL
03 PERMIT RESUBMITTAL
Renton Highlands
Library
Renton WA
ISSUANCE
BID DOCUMENTS
PROJECT NUMBER
C131436-01
DATE
SEPTEMBER 9, 2014
SCALE
As Shown
DRAWING TITLE
TESC DETAILS
SHEET NUMBER
C-210
C D ' 42 - -? 7;? ( I
DATE
5/19/14
7/11/14
9/9/14
I(I
I
I
00
9
C
m 3
♦j)
z
m
@
Gz,�
D
I(I
I
I
00
�y
z
z
NT
C
@
Gz,�
mp
y _oz
<
r
C
E
I
w
i N
m
-mac
I
I
N
I �
D
�
I(I
I
I
�y
z
z
NT
e z O
mp
y _oz
<
r
I .,
E
I
w
-mac
I
I
N
I