Loading...
HomeMy WebLinkAboutR-3762125 4 STA. 30+00.00 END OF SHARED DRIVEWAY CO CO TG-512.04TG=512.05 IE=506.54, 6"0� I[:/ -IE -508.42. 6"0 GO TG=512.03 IE -507.97. 6"0 8"0 S.D. 0 1.0% (TYP.) 00 TG=511.51 IE=507.20, 6'0 22' PUBLIC SHARED I EX. 10' ACCESS EASEMENT" REC. NO. 8101160238 1 1 A PORTION OF THE SW 1/4 OF THE SW 1/4 OF SECTION 33, TWP 23 N., RGE 5 E. KING COUNTY, WA 10' PRIVATE JOINT UTILITY ESM'T. (TYP.) 23 LF, 12"0 SD--\ \ / 31+00 +310+40.00, 10.00' T I 1 I 3' MIN. (NP.) 1 7 �'... 10' WATER EASEMENT 8 ACCESS EASEMENT (SHARED ACCESS EASEMENT) SEE SHEET RD -03 X17, j SHEET RD -01 PROPOSED - WATER LF, 12"0 SO PROPOSED SEWER I I 13 I I JOINT UTILITY TRENCH t (TYP.) I ' 12 520 - - - io �Irn N NIS �� Nor- �N 00 n �I� M J0 tel;mw; SIN o 016 �N °r° a &C3 NN s rn�°0 SIO NN L I ^lOR ROO �� - u0 ,a:a pio I�lo cl� O6 U) <i'o 0OeOd �I$ F 520 G 504.77 H STA. 30 +00 -- - 00. 0. 00, -- o LOT OWNER. 3. ----�0 s nm INSTALLATION PER THE FOLLOWING PROCEDURE: A) END OF S ELEV: 511.98 RED DRIVEWAY 515 z CCN INSPECTION SHALL INCLUDE ALL PROJECT STORM i Nz DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE m STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED n AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN CENTER 3rA_._T5 OF CUL-DE-SAC U77 515 I COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS /V ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO RINl�lE3 R>✓Qr� PLAYER NITEXP. VIDEO VIDEO FORMAT) WITH GRAMPG SH LLL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND ELEV: 539.68 IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION a PLANB) THE COSTS INCURRED IN MAKING THE INITIAL CCN INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND PROPOSED GRADE 0 (� ADDITIONAL CCN INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQUIRED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. 510--- THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCN INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. - _ 4. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS 1-. THAN 1 FOOT. 510 EXING GRADE 0 505 ----- 505TI 500 OPO ---i i ( - II - 500 23 LF, 12"0 SO ® =2.00% 495 495 '� fA 30+00 Cd 2 Waktlp Dari W" You Dip 811 umme WldOfQOV11d Locamm Calor OD,A rMORWA) 30+40 30+80 31+20 1 k CONSULTING 20ENGINEERS LLC 4!'�� 33000 BIn Avenue Same I ® 10 I�I q Sutte 5 Fadere Way, WA 98003 Ewww.esmcivil.com ,q hdic WwMe in,ftwI PrupclBUYamgenwnl I LaMeeeps N"OMIIwW,s �C/girl ESM JOB #1670-003-013 s�OI KiIQYfL�YZEIII) 10 5' 8 I +-K STA. 51+76.10, 16.00 RT. OO� O ® EL.=504.41' ri -� O ooDOoao " r -7M- RAMP #1 i 4' WN W` `8 0 0 / Q + J D=8Q 8'45'14" R=35.00'= o m L=54.22' O w N� ® ROAD A I T RAMP #2 (LIMITED RESIDENTIAL ACCESS) >4 STA. 14+27.40, 10.00 LT. RAMP #2 SPOT ELEVATION CHART POINT ELEVATION A 504.07(0 FL) B 504.09(0 FL C 504.10 D 504.12 E 504.70 F 504.72 G 504.77 H 504.79 CURB RAMP DETAIL SCALE: 1"=10' CURB RAMPS TO BE WSDOT STD PLAN F-40.15-02 TYPE PERPENDICULAR B STORM NOTES: 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS A CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION MUST B IMPLEMENT FLOW CONTROL BMPS, UNLESS CONSTRUCTED AS C PART OF THIS SUBDIVISION. COMPLIANCE WITH THIS D REQUIREMENT WILL BE ADDRESSED IN THE DRAINAGE PLAN E SUBMITTED FOR RESIDENTIAL BUILDING PERMIT DRAINAGE F REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FAMILY G RESIDENTIAL BUILDING PERMIT FOR EACH LOT. 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS SHALL BE c OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH o LOT OWNER. 3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING s nm INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE C CCN INSPECTION VIDEOS AND WRITTEN REPORTS. THE z CCN INSPECTION SHALL INCLUDE ALL PROJECT STORM i Nz DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE m STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED n AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE m STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND I COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS /V ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO RINl�lE3 R>✓Qr� PLAYER NITEXP. VIDEO VIDEO FORMAT) WITH GRAMPG SH LLL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SHOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION a PLANB) THE COSTS INCURRED IN MAKING THE INITIAL CCN INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCN INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCN INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQUIRED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCN INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 4. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. RAMP #1 SPOT ELEVATION CHART POINT ELEVATION A 504.40(0 FL) B 504.42(0 FL) C 504.43 D 504.45 E 505.03 F 505.05 G 505.10 H 505.12 n -in 4 SCALE: 1"-2U xa62. 1"-5' VERT. 20 10 0 20 40 ALLOWABLE PIPE MATERIALS 1. REINFORCED CONCRETE PIPE 2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52) 3. SOLID WALL POLYETHYLENE PIPE (SWPE; ALSO KNOWN AS HDPE PIPE OR HOPP) 4. CORRUGATED POLYETHYLENE PIPE (CPEP) (NOT FOR MAIN CONVEYANCE) k. 14+27.47, =504.11' RAMP #3 ... ...?\ .................. .. 1 RAMP #4 RAMP #3 SPOT ELEVATION CHART POINT ELEVATION A 504.15(0 FL) B 504.07(0 FL C 504.18 D 504.16 E 504.78 F 504.76 G 504.85 H 504.83 ROAD A " RT. (LIMITED RESIDENTIAL ACCESS) W� S �W W8 Q F D=91'14'46" = o R=35.00' L=55.74' p w N� I, T STA. 52+66.12, 16.00 RT. 1AL_ 8 EL 505.01' CURB RAMP DETAIL SCALE: 1"=10' CURB RAMPS TO BE WSDOT STD PLAN F-40.15-02 TYPE PERPENDICULAR B R-316212 CHECKED SPOT ELEVATION CHART POINT ELEVATION A 505.02(0 FL) B 504.98(0 FL C 505.05 D 505.01 E 505.65 F 505.61 G 505.72 H 505.68 1 CITY STANDARDS y 8 s � m I O �0 1z,.1 n D v C 9ov CC p m m c o SF z5 D s nm z 1 CITY STANDARDS y 8 I O �0 1z,.1 n D v C 9ov CC p G m9 c z SF z5 3 s nm z K, N- C � z i Nz m oa m g n m m m I 1 CITY STANDARDS y g I oC 1z,.1 t 9ov a m c SF D s nm N �> N- Baa � z m oa = g n m N a N I I ^ COMPLIANCE TO CITY STANDARDS I g I t 9ov a m tr.tr L.�9 TIS no T D z g .'9m RYLEE'S PLACE 08/18/201, '�"""°"""°"'°°' CITY OF 1 SECOND SUBMITTAL L ESM 06/05/14 � 1"=20' p C I� I� 2 THIRD SUBMITTAL ESM 07/17/14 LGB \ L �1 TO V °im"�'� 3 MVLAR SUBMITTAL ESM 08/16/14 wwm: CJR wE na DATUM ROAD AND STORM PLAN AND PROFILE 9lwrc 99: ul uu wE Planning/Building/Public Warks Dept. AND CURB RAMP DETAILS RD -04 F NOi p!E INpI NO. REVISION BY DATE APPR "A""� �'1E "C01�""-' -y I: 12 =:21