Loading...
HomeMy WebLinkAboutR-373722LINE C ABOVE v I � to . of a 4 1 u a <. Ld z v Wa 29.57 - TPI 25.8 n I 1 � f 1 I ` N . ■ bM'FFT28.80 K � � n&72 a a Y LU z w S J 111 r-- -- RIDGEI,IN CANOPY AND STANK SLAB GRADING 1 )SCALE' CON69IE GUTTER SWALE 25..8 a. c TF i c L _ J CONCRETE GUTTER SWALE 1 � C1 C11 v 4a a v . O. a TPI DESCRIPTION Y< ISLAND 28.74 v N 25.8. 1. ELEVATION AT TOP OF ISLAND (PER PLAN) N _ T 00 i 2. PIPING FALL = [(L) x 1/8' PER FQ] 9 v 1 0 WW U _ [(L) x 0.01041 286 x U WHERE L (VAP.) = 222 (PER PLAN) v < I :v 3. PUMP ISLAND (6 IN.) NEW PAVEMENT O 29.79 co CONC. DRIVE SLAB (6 IN.) 0 25.8 PIPE COVER (12 IN.) p 0 0 $ PIPE DIAMETER (3 IN.) ''Q " TANK CONNECTIONS (9 IN.) 0.0 I 0 3.00 FT. 4. GRADE DIFFERENTIAL (#2 + #3) = #4 L _ J 5,29 FT, 5. TOP OF TANKS AT LOWEST POINTS ,,per Via )0`^1"0 V (#1 - #4) = #5 c�i 24.83 6. d O 2857 m LOWEST ELEVATION (PER PLANS) v z 7. DEPTH OF BURY (#6 - #5). = #7 3.74' 4 SINCE (#7) < 4.0', SET TOP OF TANKS Q.: O #6 (28.57) - 4.00' = 24.57 o v 4 C1 C11 v 4a G v . O. C1 C11 v CONCRETE GUTTER SWALE OF CANOPY ASPHALT PAVEMENT CONSTRUCTION DETAILS B• G v . M a I DESCRIPTION Y< ISLAND 28.74 FINISHED GRADE ---- ----------------------- N N 25.8. 1. ELEVATION AT TOP OF ISLAND (PER PLAN) N _ T 00 i 2. PIPING FALL = [(L) x 1/8' PER FQ] 9 i L _J ' WW U _ [(L) x 0.01041 286 x U WHERE L (VAP.) = 222 (PER PLAN) er, CONCRETE GUTTER SWALE OF CANOPY ASPHALT PAVEMENT CONSTRUCTION DETAILS 2 NOT TO TANK BURY CHART SCALE 1/2' RADIUS AT EDGE OF SLAB (TYP.) TACK COAT 10' THICKEN EDGE (TYPA L.STRUCTURAL MATERIAL COMPACTED SEE THIS SHEET TO 95% OR 6' OVER EXCAVATED, FOR PAVEMENT SCARIFIED AND RECOMPACTED SECTION DETAILS SUBGRADE (TYPICAL) REFER TO SOIL ENGINEER'S RECOMMENDATIONS FOR SITE PREPARATION. TYPICAL JOINT SECTION AT CONCRETE AND ASPHALT V NOT TO SCALE CONSTRUCTION JOINTS MUST BE APPROVED BY OWNER'S ENGINEER. PLACE WHEN CONTINUOUS POUR OPERATIONS ARE SUSPENDED FOR MORE THAN 30 MINUTES. • . ° e 747 n Wa1VORK a. n COLD JOINT Y NOT TO SCALE 4' (MIN.) COMPACTED DEPTH WSDOT HOT MIX ASPHALT - 1/2 -INCH CLASS oo o 00 0 opo 00 m o 8' (MIN.) COMPACTED oo °O 00 '0 0'0 0 080 0 0°0 0 DEPTH CRUSHED ROCK oopp0 00 . o BASE (CRB) o • o - o 12' MINIMUM STRUCTURAL FILL a o o o 0 SEE SOILS REPORT FOR OVEREXCAVATION REQUIREMENTS. TYPICAL PAVEMENT SECTION �S NOT TO SCALE CONCRETE SLAB / CONCRETE - I CURB SLOPE d' CONCRETE POST FOOTING, SEE TANK PLANS Profile View 4' THICK CEMENT a CONCRETE SET TOP - ?' ELEVATION TO MATCH 1„ TOP OF ADJACENT CURB '; D/2 a A" CONCRETE CURB -/ Plan dew V VENT RISER PAD DETAIL NOT TO SCALE 0 iV EXPANSION JOINT WHERE EDGE ABUTS PUMP ISLAND OR TANK 6" WIDE STEEL SLAB (TTP) TROWEL FINISH 4- 24"24" 24" 2" ASPHALT OR CONCRETE PAVEMENT (TYP.) o d SLOPES LOPE 77 D .e LAI CONCRETE GUTTER W/6 -x6 -x10" W.W.M. 8" MINIMUM AGGREGATE BASE SUBGRADE. NOTE SEE SHEET Al PREPARATION OF SUBGRADE SHALL BE PER FOR MATCHING OF PROCEDURES OUTLINED IN SOILS REPORT. CONTROL JOINTS n CONCRETE SWALE DETAIL �NOT TO SCALE PAINT (2) COATS TRAFFIC UNE YELLOW ON-SITE n DIRECTIONAL ARROW NOT TO SCALE 0 CAST [RON, RING AND COVER PIPE MATERIAL AS SPECOED BY THE ENGINEER. NOTES.: 1. a" AND'b' CLEAHOUTS. ON SEWER MAINS $"LL BE EAST JORDAN IRON WORKS: INC. No. 3696 OR EQUAL.'CLEAN OUT SHALL BEA WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS. POUR A 1'-Q THICK, 2-0" SQUARE CONCRETE. CLASS '3000 PAD AROUND THE RING.AND CDVER, F Ur WORKS 8:IOR611NCN CLEANAUT M. PLAN - �'1 'j1EPARTMEN'C FORS SANITARY SEWER MAINS SEPTEM]EI6R 2011 8 CLEAN-OUT DETAIL NOT TO SCALE — 5 1 2" 41��G14AIs0�Z O O ZO 2 Py G`1,40 ENG%A 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 (425)251-8782 FAX CIVIL ONi1FFR IG. LAND PLANNING.ENV SURVEYM, NONMENTAL SERVICES T CQ O. 04t0.S 0 � � U C No �NHNh � ONonvl O Tm� Y �8� IL4 1"R /2^ R Y TANK BURY CALCULATIONS G b' M M FURTHEST !:2 DESCRIPTION Y< ISLAND 3 FINISHED GRADE ---- ----------------------- N N (PRODUCT) 1. ELEVATION AT TOP OF ISLAND (PER PLAN) N 30.12 2. PIPING FALL = [(L) x 1/8' PER FQ] N m 12 WW U _ [(L) x 0.01041 z U WHERE L (VAP.) = 222 (PER PLAN) er, 2,29 FT. 3. PUMP ISLAND (6 IN.) NEW PAVEMENT O O co CONC. DRIVE SLAB (6 IN.) 0 '6'6 PIPE COVER (12 IN.) p 0 0 $ PIPE DIAMETER (3 IN.) ''Q " TANK CONNECTIONS (9 IN.) TOTAL 36 IN., OR 3.00' 3.00 FT. 4. GRADE DIFFERENTIAL (#2 + #3) = #4 5,29 FT, 5. TOP OF TANKS AT LOWEST POINTS ,,per Via )0`^1"0 V (#1 - #4) = #5 c�i 24.83 6. TOP OF SLAB ELEV. ABOVE TANKS O O 2857 m LOWEST ELEVATION (PER PLANS) g z 7. DEPTH OF BURY (#6 - #5). = #7 3.74' NOTE: MINIMUM BURY DEPTH = 4.0' SINCE (#7) < 4.0', SET TOP OF TANKS O #6 (28.57) - 4.00' = 24.57 2 NOT TO TANK BURY CHART SCALE 1/2' RADIUS AT EDGE OF SLAB (TYP.) TACK COAT 10' THICKEN EDGE (TYPA L.STRUCTURAL MATERIAL COMPACTED SEE THIS SHEET TO 95% OR 6' OVER EXCAVATED, FOR PAVEMENT SCARIFIED AND RECOMPACTED SECTION DETAILS SUBGRADE (TYPICAL) REFER TO SOIL ENGINEER'S RECOMMENDATIONS FOR SITE PREPARATION. TYPICAL JOINT SECTION AT CONCRETE AND ASPHALT V NOT TO SCALE CONSTRUCTION JOINTS MUST BE APPROVED BY OWNER'S ENGINEER. PLACE WHEN CONTINUOUS POUR OPERATIONS ARE SUSPENDED FOR MORE THAN 30 MINUTES. • . ° e 747 n Wa1VORK a. n COLD JOINT Y NOT TO SCALE 4' (MIN.) COMPACTED DEPTH WSDOT HOT MIX ASPHALT - 1/2 -INCH CLASS oo o 00 0 opo 00 m o 8' (MIN.) COMPACTED oo °O 00 '0 0'0 0 080 0 0°0 0 DEPTH CRUSHED ROCK oopp0 00 . o BASE (CRB) o • o - o 12' MINIMUM STRUCTURAL FILL a o o o 0 SEE SOILS REPORT FOR OVEREXCAVATION REQUIREMENTS. TYPICAL PAVEMENT SECTION �S NOT TO SCALE CONCRETE SLAB / CONCRETE - I CURB SLOPE d' CONCRETE POST FOOTING, SEE TANK PLANS Profile View 4' THICK CEMENT a CONCRETE SET TOP - ?' ELEVATION TO MATCH 1„ TOP OF ADJACENT CURB '; D/2 a A" CONCRETE CURB -/ Plan dew V VENT RISER PAD DETAIL NOT TO SCALE 0 iV EXPANSION JOINT WHERE EDGE ABUTS PUMP ISLAND OR TANK 6" WIDE STEEL SLAB (TTP) TROWEL FINISH 4- 24"24" 24" 2" ASPHALT OR CONCRETE PAVEMENT (TYP.) o d SLOPES LOPE 77 D .e LAI CONCRETE GUTTER W/6 -x6 -x10" W.W.M. 8" MINIMUM AGGREGATE BASE SUBGRADE. NOTE SEE SHEET Al PREPARATION OF SUBGRADE SHALL BE PER FOR MATCHING OF PROCEDURES OUTLINED IN SOILS REPORT. CONTROL JOINTS n CONCRETE SWALE DETAIL �NOT TO SCALE PAINT (2) COATS TRAFFIC UNE YELLOW ON-SITE n DIRECTIONAL ARROW NOT TO SCALE 0 CAST [RON, RING AND COVER PIPE MATERIAL AS SPECOED BY THE ENGINEER. NOTES.: 1. a" AND'b' CLEAHOUTS. ON SEWER MAINS $"LL BE EAST JORDAN IRON WORKS: INC. No. 3696 OR EQUAL.'CLEAN OUT SHALL BEA WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS. POUR A 1'-Q THICK, 2-0" SQUARE CONCRETE. CLASS '3000 PAD AROUND THE RING.AND CDVER, F Ur WORKS 8:IOR611NCN CLEANAUT M. PLAN - �'1 'j1EPARTMEN'C FORS SANITARY SEWER MAINS SEPTEM]EI6R 2011 8 CLEAN-OUT DETAIL NOT TO SCALE — 5 1 2" 41��G14AIs0�Z O O ZO 2 Py G`1,40 ENG%A 18215 72ND AVENUE SOUTH KENT, WA 98032 (425)251-6222 (425)251-8782 FAX CIVIL ONi1FFR IG. LAND PLANNING.ENV SURVEYM, NONMENTAL SERVICES T CQ O. 04t0.S 0 � � U C No �NHNh � ONonvl O Tm� Y �8� IL4 1"R /2^ R Y Y G b' M M M !:2 M Y< r `n 3 FINISHED GRADE ---- ----------------------- N N m_ N N N N N N m e, a WW U = z U er, N pNo 11 NEW PAVEMENT O O co 'z 0 '6'6 0 p 0 0 $ ''Q " 5g, U ,,per Via )0`^1"0 V c�i a o O a m m g z m OL O EXPANSION JOINT AT a••: ,. 20' INTERVALS In 734" r \ Z N M Y YI t0 I� d FLOWUNE OF CONCRETE SWALE NOTE: CEMENT CONCRETE BARRIER CURB 9 M 1. INSTALL EXPANSION JOINTS O Prejed j: 13245 Stare /00459 6" MIN. AGGREGATE BASE AND SUBGRAD 20'-0" O.C. MAX. NOT TO SCALE O < PREPARE AND CONSTRUCT SAME AS BASE 2. SEE SHEET Al FOR \ Designed By: CMF N AND SUBGRADE PER PAVEMENT SECTION OF CONTROL JOINTS 6" WIDE STEEL O 5;I Drewn RDC TROWEL FINISH W cLeakod By JH INTEGRAL CONCRETE SWALE DETAIL 3' T � E Dote: 9.7.2012 A� IV NOT TO SCALE (AT CANOPY) o d x 181, CONCRETE SLAB AND jz z REINFORCING PER W I< ARCHITECTURAL PLANS. z 4 N SLOPE - SLOPE o SLOPE SLOPE G b' m a O O 2� , z 19 r `n 3 y o W m_ I z W O z m m WW U = z U c co 'z n ''Q " 5g, ,,per Via )0`^1"0 V c�i a o a a m m g z m OL In \ Z N M Y YI t0 I� d FLOWUNE OF CONCRETE SWALE NOTE: 1. INSTALL EXPANSION JOINTS O Prejed j: 13245 Stare /00459 6" MIN. AGGREGATE BASE AND SUBGRAD 20'-0" O.C. MAX. < PREPARE AND CONSTRUCT SAME AS BASE 2. SEE SHEET Al FOR MATCHING Designed By: CMF N AND SUBGRADE PER PAVEMENT SECTION OF CONTROL JOINTS Drewn RDC cLeakod By JH INTEGRAL CONCRETE SWALE DETAIL E Dote: 9.7.2012 A� IV NOT TO SCALE (AT CANOPY) o Scale. Disk File: 431 RAINIER AVENUE SOUTH RENTON. WA 98057 CITY OF RENTON Approved by: Date: CONSTRUCTKM DETAILS FRED MEYER Approved by: Date: FUELING FACLRY LPermlt13001730 R 313122 Approved by: Date: Approved by: Date: f 10 i r-3 ( a - -2 7-2 iZ G b' m a O O 2� , z 19 r `n 3 y o 2 I z m z m eLF I I b' m a O O m a •< , 0 19 r `n � y o 2 I `. z eLF z a c co 'z n I I 8 m a O O m a •< , j G Nym O r `n � y o 2 I I � 8 O I� a oa D NN ;: a 2