Loading...
HomeMy WebLinkAboutS-035501I MI I I T I� ZZisT. s.a w.N• RA/ _ 40N N.E. 6#7A1 C[ Ef •FM Y •i N. 14 It/ El•SD.N�V• I I EZ. d• .o. LOC. AS 6powN ,� -�( -t l • 141 ..8•p I.P. c S= 0:12° Aa W " P • II e04 I i ME - Ex /ST. AW. sEWEE CO. R #4 =4o -1 I E e;r) � � /. E. (8 4 ACTUAL - 40(o .4o) i I Atm... 5,W, 50wr a N.M. I I RAN/ = 400.40 I I /. E. CQ'Il = •4ioSdS I u I � II NOTE AT ALL SAW CUT ,/OINTS I pi I � /N PA V 'T C LEAN BLOW ,ORY AND SEAL W1 AZ 4000 -5AgAL T I I 1 NI �I I� I o I II IN�II INIiI EX1Sr. ll/. M= 40f. I i E, 115V NJ= �OZ•�L N� /.E. f0o# J 1= 44OZ•3F M� I I QJ0 I Z �) I • ul Q Z 0 Ez d s •A015N/. _ N07f ' EL . OF END OF L NE TO !3E AS- BU��T PA1O.e TO &ACt7"ALL/NG III M � I 9¢' CAP L INE AFTE/Z / r 14AS 5Ec 10 - r OEPT/-� Co VE2EO W1 4S T V /N�PECTED �' ,q /ie N TOP 501L. (USE R/P BAG T) I 0107, CON 57RuCTEP 20 *�SNN SEWS I ES M1' .27¢' 8'� P. V C� •.E.SMT_ r 1.54 % o . I �,c9, � 98'N 8''o P 2 10'y Co D. /. P. 5'! & `0 ,0 / P 96 ZZ/ 2'S �T �4r7 42 4I2 - 70 III I �S.S.Al. H42 EX: C. R 11vf= 410 •32 III I . �I nrw_am� IPP I 21 f= /5'Sg n� ,Elyse E$ M'T L J (=6-,Fr4/01,7 � i .F. 4083 ix-Ex. FIaUSE TO (iE QEMOI/ED N PL. r -1 WrE.• CAPPED Dry SEINNEQ fA(D EC 394.7 16 LOCATED Z/ '/109TH 14.3 • WEST OF At. W 6LD4 COCNER. o�� 404 Furu E G ,�6 9y.C. STue TYP 3 -A.ACr5 \A.S A- FROPOM-D CON ToU2 L /NES : ryP.) F.F. 4/0.6 I \ a I 3 I .5' G.F. 403.7 15 '.5AN. 5EWER ES MT r� 0 P1 E 5� GENERAL NOTES: 1. All work and materials shall be in conformance with the standards and specifications of the City of Renton and APWA Standards and Specifications (1981 Edition) 2, All locations of existing utilities shown are approximate and it shall be the con- tractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. The contractor shall verify locations and depths of existing utilities before disturbing. 4. All construction is subject to the inspection by the City of Renton and the contractor shall notify the City of his schedule in sufficient time to permit inspection prior to and during the work. 5. Prior to beginning work arrangements shall be made with the City of Renton for a PRE - CONSTRUCTION CONFERENCE to be attended by the contractor, City of Renton and other representatives of interested utilities. 6. Side sewers are to be in accordance with the requirements of City of Renton, 6 "min. dia. 7. All manholes not in paved public R/W shall have locking lids. 8. All gravity sanitary sewer pipe (except as noted) shall be integral wall, bell and spigot, rubber gasket joints, un- plastized polyvinyl choride meeting ASTM D -3034 (latest revision). 9. Bedding for all sewer pipe shall be 6" pea gravel over /under pipe. 10. Manholes shall be Standard Plan No. 34 with eccentric cones and single 1" lift hole in cover. 11. New connections to existing manholes /sewers shall be sealed off until upstream con- struction is finished, tested, cleaned and accepted. All construction debris and water shall be removed prior to opening seal. 12. All trenches shall be compacted prior to testing sewer lines for acceptance. 13. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 14. The contractor shall keep an accurate account of all sewer construction including an accurate "AS- BUILT" set of construction drawings. "AS -BUILT DRAWINGS" shall be certified to the owner or his representative after completion of the work and before FINAL PAYMENT for the work. 15. All sewer main construction shall be tested using the low air pressure air test method and shall be T.V.. inspected prior to final acceptance. AROPOkD B "0 O TER MAIA I' • �, �� 2 -4 -8 "0 PVC C• 0.401a" W/ END CAP NOTE: PR /OR 70 CONSTRUCT/ON VERIFY 1E. 4"5.5. [OGA7E0 dP NW C0R. LOT / PLAT OF UNION 600 AND FUi?N/SN AS -8UlLT El. TO DfPT. OF PUBL lC WORKS, CITY OF RENXON. I "PIN N CUWA ................... ........._......... ......... ..... .. �....._ ... ....:......... dE Afff A Lt- -EWLM:U[A-1= 69-AU ..... .. _ . TE ZTX�:L..;. 'FIELD . VEJ IF. M449. P.691 R* TO ;AM. S ..1We. COWSWO ......... _ ......... ::::::::: _ ......... ......... :: : : :: :AGE: :�lEWE..9 Lo. Nag... 5 :1.AIC4WIMIiG::5!D�l .EI?VEZ : •LL:ZE : ?NCA5,E ::::::::: . ::::::::: ......... ......... ::::: ' :: . ....:CD 1 �2E:J`E.: 5`':�E1.T.HE�2:: 1DE : D ': . WATER I 4ANAI: C7eC��11�1G rcE:csslnlc:::: ......... ......... ......... ......... ......... ......... .... .. ....... E' :1.5 1./ G.: CJT�L T : fltilF I�/lA T /0r� . �IAKEAVceom i �'M :BUI�[ ay. C Z : ::::::: ;4 /LAS.G�E .: OL & VAT10 4 N. :W..:A 14 ' EX 15T O1� : U! . �1.,! TIES : 5�i SL�,Q :::::::: ::::::::: � ::::::::: ::::: :::: ::::::::: ::::::::: ::::::::: ::::::::: � fir,�,lr1/ /S1��17 :'1�"v . �'?.E pi¢E GN TA T1 fl0 D.C. AN.D..T.0 7 W: A &Wdt. &Q ON FIELD• V,N. M. 5EWA ......... ......... ......... .MAC t;16 4NCLJZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . ........ ......... ......... ......... . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i . . . . . . . . . . . . . . . . . . . . . . . ........... ......... ......... ......... ......... ......... ......... ......... ...... ............................................... ............................... ZAP- r -T�, S5 W . AWRI. F .... . �ICAM z:'= :Z'::::_'::::• FWWX l i •tom NC saw L John R. Newell Inc. P. S. 231 Williams Avenue South, Renton, Washington 98055 Phone 255-210 1L ---- ......... . ......... 4 �(lsi ........ ......... ... ......... ......... .... ....... 41Q W% V-0 � A s a ! e ■ ■ M ■� I�