HomeMy WebLinkAboutD-374005S
N
N
I J
°' O w
0
�0 z
w Q
O�z cn
Z
w Q
co
z 3 z
m
Lu
� O
8!j
wow U
IZ
cL Q D
Z
O
a U
a
I�
O �
n
�
o
s
a
0
3
~
[
�z
U
U
w
1�y
C
c
z
MATERIAL COMPACTED
v
ED
a
9411
c
s
c
TO 95% OF MAX.
c
0
a
as
a 4' �
o A
a o
r-a
z
z
0
N
af.. -n:
U
U
U
U
j
z
MATERIAL COMPACTED
�I?
z
z
0
N
af.. -n:
U
U
U
U
MATERIAL COMPACTED
�I?
T
�
TO 95% OF MAX.
a
w
w
n
a
DENSITY
$
a
a
d
z
¢O r
0
0
°
K
w
N
w
m
o�Q
VARIES
_N
0
w z z
a
¢
¢
w
a
FILL MATERIAL COMPACTED
j
p
((77
o`oo 6
0
TO 90% OF MAX. DENSITY
FI!g
M
N
^
Z
w
FL
o
0
N
a
000oC
CAo( o
O
I---
y
_
_ _)
MIN. ..
GRAVEL BACKFILL FOR
V
$Q
U
m
z
z
0
N
CITY OF RENTON
STORMWATER DRAINAGE NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE
HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBUC WORKS, DESIGN ENGINEER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE '1988 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE
AND MUNICIPAL CONSTRUCTION' PREPARED BY WSDOT AND THE AMERICAN PUBUC WORKS ASSOCIATIONS
(APWA), AS AMENDED BY THE CITY OF RENTON DEPARTMENT OF PUBUC WORKS.
3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE
ON FILE IN THE DEPARTMENT OF PUBUC WORKS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE
WRITTEN APPROVAL FROM THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR
STORM WATER UTLTIY.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. DATUM SHALL BE U.S.G.S UNLESS OTHERWISE APPROVED BY CITY OF RENTON DEPARTMENT OF PUBUC WORKS.
REFERENCE BENCHMARK AND ELEVATION ARE NOTED ON THE PLANS.
6. ALL SEDIMENTATION /EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND
THE POTENTIAL FOR ON -STIE EROSION HAS PASSED.
7. ALL RETENTION /DEZENIION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION
WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBUC WORKS,
STORM WATER UTILITY.
B. GRASS SEED MAY BE APPUED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON
APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE
DEPARTMENT OF PUBUC WORKS, STORM WATER URLTTY.
9. ALL PIPE AND APPURTENANCES SHALL BE WD ON A PROPERLY PREPARE FOUNDATION IN ACCORDANCE WITH
SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE
CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE
FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE
UNYIELDING BASE ALL PIPE BEDDING SHALL BE APNA CLASS 'C; W1TH THE EXCEPTION OF PVC PIPE. ALL
TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95 PERCENT FOR PAVEMENT AND STRUCTURAL FILL
AND 90 PERCENT OTHERWISE PER ASTM 0- 1557 -70. PEA GRAVEL BEDDING SHALL BE 6 INCHES AND OVER AND
UNDER PVC PIPE.
10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT
TREATMENT 11 OR BETTER INSIDE AND OUTSIDE
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING UNE OF ANY STORM DRAINAGE PIPE,
OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL
13. OPEN CUT ROAD CROSSINGS AND E)(ISITNG PUBLIC RIGHT -OF -WAY WILL NOT BE ALLOWED UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON DEPARTMENT OF PUBUC WORKS, DESIGN ENGINEER.
14. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK
PIACED TO A DEPTH OF 1 FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 INCHES TO B INCHES /40
PERCENT TO 70 PERCENT PASSING; 2 INCHES TO 4 INCHES ROCK /30 PERCENT TO 40 PERCENT PASSING; AND -2
INCHES RDCK /10 PERCENT TO 20 PERCENT PASSING.
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM
UNLESS APPROVED BY THE DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR STORMWATER UTILITY. AN
ACCURATELY DIMENSIONED CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED
TO THE CITY OF RENTON UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMIT BY THE CITY OF RENTON DOES NOT REUEVE THE
OWNER OF THE CONTINUING LEGAL OBUGAIION AND /OR LIABILITY CONNECTED WITH STORM SURFACE WATER
DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBUGATION FOR THE PROPER
FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE UFT, HEALTH, AND
SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK
COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT -OF -WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE TRAFFIC ENGINEERING
DIVISION OF THE DEPARTMENT OF PUBUC WORKS. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS
1- 07.23, TRAFFIC CONTROL, SHALL APPLY.
18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER
PROTECTION AREA
EROSION CONTROL NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS,
DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON
THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING
CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
IN OPERATION PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION TO INSURE THAT
SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR
ON -STTE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY
OF THE PERMDTEE.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL
FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION
AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
5. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED
SOIL AREAS GRATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED OF MORE
THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING.
7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK
IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE
IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED
EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS
SEEDING ALONG WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH
SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE
INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR
OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME
PERIOD.
CALL 2 WORKING DAYS
BEKAE� YOU DKr
OI I
CONSTRUCTION NOTES AND DETAILS
HARPER ENGINEERING ADDITION
SW 1/4 SECTION 18, TWP. 23 N., RGE. 5 E., W.M.
EXTRUDED CONCRETE CURB DETAIL
NOT TO SCALE
2" COMPACTED DEPTH -
CLASS 'B' A.C. PAVEMENT
4" COMPACTED DEPTH CRUSHED
ROCK BASE COURSE
ol
pDoo ° ° oo °o o° °8O oo °Q oo db
12" MIN. SUBGRADE COMPACTED
TO 95% DRY DENSITY
TYPICAL ASPHALT PAVING SECTION
NOT TO SCALE
COMPACT
B" DIA. PERFORATED PVC
w/ HOLES DOWN
EL.
WRAP INFILTRATION TREN,
FILTER FABRIC TOP AND
ASPHALT PAVEMENT
/CFF fFf TInm THIC cu FITT)
af.. -n:
U
U
MATERIAL COMPACTED
�I?
T
TO 95% OF MAX.
Li;t
w
w
o�CP o
DENSITY
a
a
d
z
¢O r
0
0
°
w
N
w
m
o�Q
VARIES
_N
0
w z z
¢
¢
w
k
FILL MATERIAL COMPACTED
j
w °
((77
o`oo 6
0
TO 90% OF MAX. DENSITY
FI!g
M
N
^
Z
FL
o
�
CITY OF RENTON
STORMWATER DRAINAGE NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE
HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBUC WORKS, DESIGN ENGINEER.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE '1988 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE
AND MUNICIPAL CONSTRUCTION' PREPARED BY WSDOT AND THE AMERICAN PUBUC WORKS ASSOCIATIONS
(APWA), AS AMENDED BY THE CITY OF RENTON DEPARTMENT OF PUBUC WORKS.
3. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE
ON FILE IN THE DEPARTMENT OF PUBUC WORKS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE
WRITTEN APPROVAL FROM THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR
STORM WATER UTLTIY.
4. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
5. DATUM SHALL BE U.S.G.S UNLESS OTHERWISE APPROVED BY CITY OF RENTON DEPARTMENT OF PUBUC WORKS.
REFERENCE BENCHMARK AND ELEVATION ARE NOTED ON THE PLANS.
6. ALL SEDIMENTATION /EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND
THE POTENTIAL FOR ON -STIE EROSION HAS PASSED.
7. ALL RETENTION /DEZENIION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION
WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE DEPARTMENT OF PUBUC WORKS,
STORM WATER UTILITY.
B. GRASS SEED MAY BE APPUED BY HYDROSEEDING. THE GRASS SEED MIXTURE, OTHER THAN CITY OF RENTON
APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED BY THE
DEPARTMENT OF PUBUC WORKS, STORM WATER URLTTY.
9. ALL PIPE AND APPURTENANCES SHALL BE WD ON A PROPERLY PREPARE FOUNDATION IN ACCORDANCE WITH
SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE
CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE
FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE
UNYIELDING BASE ALL PIPE BEDDING SHALL BE APNA CLASS 'C; W1TH THE EXCEPTION OF PVC PIPE. ALL
TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95 PERCENT FOR PAVEMENT AND STRUCTURAL FILL
AND 90 PERCENT OTHERWISE PER ASTM 0- 1557 -70. PEA GRAVEL BEDDING SHALL BE 6 INCHES AND OVER AND
UNDER PVC PIPE.
10. GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT
TREATMENT 11 OR BETTER INSIDE AND OUTSIDE
11. STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING UNE OF ANY STORM DRAINAGE PIPE,
OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL
13. OPEN CUT ROAD CROSSINGS AND E)(ISITNG PUBLIC RIGHT -OF -WAY WILL NOT BE ALLOWED UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON DEPARTMENT OF PUBUC WORKS, DESIGN ENGINEER.
14. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK
PIACED TO A DEPTH OF 1 FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 INCHES TO B INCHES /40
PERCENT TO 70 PERCENT PASSING; 2 INCHES TO 4 INCHES ROCK /30 PERCENT TO 40 PERCENT PASSING; AND -2
INCHES RDCK /10 PERCENT TO 20 PERCENT PASSING.
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM
UNLESS APPROVED BY THE DEPARTMENT OF PUBLIC WORKS, DESIGN ENGINEER OR STORMWATER UTILITY. AN
ACCURATELY DIMENSIONED CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED
TO THE CITY OF RENTON UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMIT BY THE CITY OF RENTON DOES NOT REUEVE THE
OWNER OF THE CONTINUING LEGAL OBUGAIION AND /OR LIABILITY CONNECTED WITH STORM SURFACE WATER
DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBUGATION FOR THE PROPER
FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE UFT, HEALTH, AND
SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK
COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT -OF -WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE AN APPROVED TRAFFIC CONTROL PLAN BY THE TRAFFIC ENGINEERING
DIVISION OF THE DEPARTMENT OF PUBUC WORKS. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS
1- 07.23, TRAFFIC CONTROL, SHALL APPLY.
18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER
PROTECTION AREA
EROSION CONTROL NOTES
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS,
DESIGN ENGINEER.
2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON
THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING
CONSTRUCTION.
3. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
IN OPERATION PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION TO INSURE THAT
SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL
SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND POTENTIAL FOR
ON -STTE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY
OF THE PERMDTEE.
4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITTEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL
FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION
AND RESPONSIBILITY OF THE PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
5. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED
SOIL AREAS GRATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED OF MORE
THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING.
7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK
IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE
IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED
EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS
SEEDING ALONG WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH
SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, HOWEVER, WHENEVER IT IS IN THE
INTEREST OF THE PERMITTEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR
OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME
PERIOD.
CALL 2 WORKING DAYS
BEKAE� YOU DKr
OI I
CONSTRUCTION NOTES AND DETAILS
HARPER ENGINEERING ADDITION
SW 1/4 SECTION 18, TWP. 23 N., RGE. 5 E., W.M.
EXTRUDED CONCRETE CURB DETAIL
NOT TO SCALE
2" COMPACTED DEPTH -
CLASS 'B' A.C. PAVEMENT
4" COMPACTED DEPTH CRUSHED
ROCK BASE COURSE
ol
pDoo ° ° oo °o o° °8O oo °Q oo db
12" MIN. SUBGRADE COMPACTED
TO 95% DRY DENSITY
TYPICAL ASPHALT PAVING SECTION
NOT TO SCALE
COMPACT
B" DIA. PERFORATED PVC
w/ HOLES DOWN
EL.
WRAP INFILTRATION TREN,
FILTER FABRIC TOP AND
ASPHALT PAVEMENT
/CFF fFf TInm THIC cu FITT)
DOWNSPOUT DRAIN
INFILTRATION TRENCH SECTION
NOT TO SCALE
'2" WASHED GRAVEL
FINISH GRADE
SEAL JOINT PATCH SURFACING TO
MEET AND MATCH EXISTING.
MINIMUM SECTION TO BE `g
V'T 3" A.C. PAVY CL. 8 OVER
IE OF 4" CRUSHED ROCK BASE
TRENCH EDGES
af.. -n:
STRUCTURAL FILL
)T�
MATERIAL COMPACTED
�I?
T
TO 95% OF MAX.
Li;t
o�C�
o�CP o
DENSITY
O O O
O O O
d
z
¢O r
O
T
Ise
o�Q
VARIES
Tie
s
E(II
w z z
SUBGRADE OR STRUCTURAL
> a w
k
FILL MATERIAL COMPACTED
j
w °
((77
o`oo 6
0
TO 90% OF MAX. DENSITY
FI!g
A--_
OOO
JOOO
__-
FL
o
�
000oC
CAo( o
I---
y
_
_ _)
MIN. ..
GRAVEL BACKFILL FOR
PIPE BEDDING COMPACTED
DOWNSPOUT DRAIN
INFILTRATION TRENCH SECTION
NOT TO SCALE
'2" WASHED GRAVEL
FINISH GRADE
SEAL JOINT PATCH SURFACING TO
MEET AND MATCH EXISTING.
MINIMUM SECTION TO BE `g
V'T 3" A.C. PAVY CL. 8 OVER
IE OF 4" CRUSHED ROCK BASE
TRENCH EDGES
NOTES:
1. PROVIDE 4" SAND BLANKET BEDDING FOR RIGID PIPE
2. ALL TESTING OF BACKFILL AND COMPACTION SHALL BE
IN CONFORMANCE WITH ASTM D -1557
PIPE BEDDING DETAIL
NOT TO SCALE
FECOMMeOM
FOR APPROVAL
BY
BY
BY
Date
Date
L 12'
DR V HEGHT
TWO 03 BAR HOOPS FOR 12' HEIGHT
RECTANGULAR ADJUSTMENT SECTION
0.i MR EACH CORN
0 BAR BACH S
1
i
NOTES
1. mvmana'bmebbleW,. whe mfY, MVMa
1012 apuse iMw parka mry Ee weC.
wVe mean wn,bs m pW.a! i, c.eun.
2. mwwaanamewaw na ee ae+a men le.
14btl:cub aW Nn a wY mKMnef a2• miNnun b
2.T mWnun.
3. mnuvnun Eepm nwn iM fi,iYeE9Mebms P%
w Napro V.
/. F,eme eM q,aY nay ne mfebE wim 6vge6 aml
nm aquv tsalia.
s. mo,eonmeopmMs reae,a,nmaep ,
tlro wYb mry b stgvl & e rb W 1:2/ a eYepr.
B. apa:,p NUO ee nbeuupemne sopame PreN bcee
:asnaL
D- 314005
DEVELOPER,
HARPER ENGINEERING
700 SW 7TH STREET
RENTON, WA 98057
ENGINEER:
BARGHAUSEN CONSULTING ENGINEERS
18215 72ND AVENUE SOUTH
KENT, WA 98032
(425)251 -6222
(425)251 -8782 FAX
CONTACT: DAN BALMELLI
SPIV HA('��Z
00 U
Z ?
LP Py
G`rJhG ENG \N�4
NST J. p
i CSaT�`�'a�e
e
/ /v /LTeP° 2
a /JONdL dN4
Lvss ue L Lam
CATCH AININ TIP! 1P
PAMUNO LOT C. B.
PRECAST BASE SECTION BTAFBANO PLAN 67b
as 1a1a�
rs/m,mrrn r„euea,a,
S JNIa j Pabr/go STANDARDDE PLANS
LAST DATE: 06/23/2004
SP PAGE B013
CITY OF RENTON
TJEPARTMENT OF PUBLIC WORKS
CONSTRUCTION NOTES AND DETAILS
C6 GP 6
`a
x`
w
°
a
a
U
II
d
N
Ln
C
0
E
v
Z
m
Q
w
m
>
� T^
m
a
z
n
z �.,..I
m
V
00 .E I
z N
o - P
c
"o w
z
n
X
m ep
z O
0
STRUCTURAL FILL
)T�
MATERIAL COMPACTED
�I?
T
TO 95% OF MAX.
Li;t
o�C�
o�CP o
DENSITY
O O O
O O O
d
z
¢O r
O
Ise
o�Q
VARIES
Tie
s
E(II
w z z
SUBGRADE OR STRUCTURAL
> a w
FILL MATERIAL COMPACTED
j
w °
((77
o`oo 6
0
TO 90% OF MAX. DENSITY
FI!g
Iwi1a
OOO
JOOO
FL
o
000oC
CAo( o
MIN. ..
GRAVEL BACKFILL FOR
PIPE BEDDING COMPACTED
o '
TO 95% OF MAX. DENSITY
PIPING
NOTES:
1. PROVIDE 4" SAND BLANKET BEDDING FOR RIGID PIPE
2. ALL TESTING OF BACKFILL AND COMPACTION SHALL BE
IN CONFORMANCE WITH ASTM D -1557
PIPE BEDDING DETAIL
NOT TO SCALE
FECOMMeOM
FOR APPROVAL
BY
BY
BY
Date
Date
L 12'
DR V HEGHT
TWO 03 BAR HOOPS FOR 12' HEIGHT
RECTANGULAR ADJUSTMENT SECTION
0.i MR EACH CORN
0 BAR BACH S
1
i
NOTES
1. mvmana'bmebbleW,. whe mfY, MVMa
1012 apuse iMw parka mry Ee weC.
wVe mean wn,bs m pW.a! i, c.eun.
2. mwwaanamewaw na ee ae+a men le.
14btl:cub aW Nn a wY mKMnef a2• miNnun b
2.T mWnun.
3. mnuvnun Eepm nwn iM fi,iYeE9Mebms P%
w Napro V.
/. F,eme eM q,aY nay ne mfebE wim 6vge6 aml
nm aquv tsalia.
s. mo,eonmeopmMs reae,a,nmaep ,
tlro wYb mry b stgvl & e rb W 1:2/ a eYepr.
B. apa:,p NUO ee nbeuupemne sopame PreN bcee
:asnaL
D- 314005
DEVELOPER,
HARPER ENGINEERING
700 SW 7TH STREET
RENTON, WA 98057
ENGINEER:
BARGHAUSEN CONSULTING ENGINEERS
18215 72ND AVENUE SOUTH
KENT, WA 98032
(425)251 -6222
(425)251 -8782 FAX
CONTACT: DAN BALMELLI
SPIV HA('��Z
00 U
Z ?
LP Py
G`rJhG ENG \N�4
NST J. p
i CSaT�`�'a�e
e
/ /v /LTeP° 2
a /JONdL dN4
Lvss ue L Lam
CATCH AININ TIP! 1P
PAMUNO LOT C. B.
PRECAST BASE SECTION BTAFBANO PLAN 67b
as 1a1a�
rs/m,mrrn r„euea,a,
S JNIa j Pabr/go STANDARDDE PLANS
LAST DATE: 06/23/2004
SP PAGE B013
CITY OF RENTON
TJEPARTMENT OF PUBLIC WORKS
CONSTRUCTION NOTES AND DETAILS
C6 GP 6
`a
x`
w
°
a
a
U
II
d
N
Ln
C
0
E
v
Z
m
Q
w
m
>
� T^
m
a
z
n
z �.,..I
m
V
00 .E I
z N
o - P
c
"o w
z
n
X
m ep
z O
0