EROSION /SEDIMENTATION CONTROL NOTES
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS -SITE IMPROVEMENTS, SURFACE WATER
UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION
MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
CONDITIONS FOR WET SEASON CONSTRUCTION
1. ANY CONSTRUCTION THAT WILL RESULT IN DISTURBED AREAS ON OR WITHIN A
CRITICAL AREA OR ASSOCIATED BUFFER, SHALL BE SUBJECT TO THE "CRITICAL AREA
RESTRICTIONS CONTAINED IN THE ESC STANDARDS. THESE PROVISIONS INCLUDE
PHASING THE PROJECT WHENEVER POSSIBLE SO THAT CONSTRUCTION IN THESE
AREAS IS LIMITED TO THE DRY SEASON.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL
BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN
12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE
3.
THEBOUNDARIESOfTHECLEARINGUMITSANDAREAS OFVEGETATIONPRESERVATIONAS PRESCRIBED
BE REVIEWED
TO IDENTIFY
WHICH ONES CAN BE SEEDED IN
PREPARATION FOR THE
ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE
2.
DURING CONSTRUCTION, ESC PLANS SHALL BE REVISED AS NECESSARY BY THE ESC
ONE WEEK OF THE
BEGINNING OF
FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
AREAS TO BE SEEDED AND
SUPERVISOR OR AS DIRECTED BY THE CITY TO ADDRESS CHANGING SITE
TO REMAIN
UNCOVERED SHALL BE SUBMITTED
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE
FOR REVIEW.
CONDITIONS, UNEXPECTED STORM EVENTS, OR NON - COMPLIANCE WITH THE ESC
4
MYLAIR StlBMIlTTAL
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
1t, A114
PERFORMANCE CRITERIA IN SECTION D.4.1 (P. D -69). IF NON - COMPLIANCE WITH
�I�
v/
REVISION
BY
DATE
THE ESC PERFORMANCE CRITERIA OCCURS, THE PLAN DUST BE UPDATED WITHIN 48
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE
HOURS (FAILURE TO DO SO COULD RESULT IN A "STOP WORK" ORDER AS
Z
CONJUNCTION WITH SEEDING.
APPLICANT /ESCSUPERVISOR FOR THE DURATION OF CONSTRUCTION.
NO GROWTH INHIBITING
DETERMINED BY THE CITY INSPECTOR) OF INSPECTIONS OR INVESTIGATIONS.
J4.
CELLULOSE
FACTORS
PER 1000 SF OR
IMPLEMENTATION OF THE ONSiTE CHANGES MUST OCCUR WITHIN 5 DAYS.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
UNLESS THE APPLICATION RATE IS AT LEAST
a
ACRE
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
FIBERS CAN BE EFFECTIVE AT LOWER
MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
3.
ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR BASIS AS
S
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO
PRESCRIBED IN THE MAINTENANCE REQUIREMENTS FOR EACH BMP AND IN THIS
�
NO VISIBLE WATER OR
ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
SECTION. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY DURING
DUST DURING
APPROX. 100 TONS
INCREASING THICKNESS TO 3". EXCELLENT
THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS. IN GENERAL, A
O
5.
ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND
PURCHASED FROM
SIGNIFICANT STORM IS ONE WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR
LESS. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT
LANDSCAPING BECAUSE IT CAN BE DIRECTLY
IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
'^
WASTE HANDLING
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
AMENDMENT. SOURCES FOR COMPOST ARE
v�
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
06
FOR MARKETING RECYCLABLE MATERIALS AT
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS
(206) 296 -4439.
CHIPPED SITE
COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION,
WET SEASON PROVISIONS
Q
VEGETATION
MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL
THICKNESS
DEBRIS FROM CLEARING AND GRUBBING, AND IT
Q
SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET
O
BURNING. GENERALLY, IT SHOULD NOT BE USED
SEASON (OCTOBER 1 -APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES.
THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
ITS TENDENCY TO BE TRANSPORTED BY RUNOFF.
INTENDED TO BE MINIMUM REQUIREMENT'S TO MEET ANTICIPATED SITE CONDITIONS. AS
1.
THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN
LL
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
(SECTION D.3.2).
Q
WILL BE NECESSARYTO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
2.
STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED
w
IMPORTANT TO GRASS ESTABLISHMENT.
DURING THE COURSE OF CONSTRUCTION, R SHALL BE THE OBLIGATION AND
FOR MORE THAN 12 HOURS (SECTION D.3.2).
J
RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
3.
COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED
Z
CREATED BY THE ACTMTIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
ON SITE (SECTION D.3.2).
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
W
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
4.
ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED
W
WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5).
7.
APPROVAL OF THIS PLAN IS FOR EROSION /SEDI M ENTATI ON CONTROL ONLY. IT DOES NOT
5.
MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1).
r�
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES,
v
RESTRLCTORS, CHANNELS, OR RETENTION FACILITIES.
6.
FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF
DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1).
8.
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
7.
CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH
UNLESS THE SITE IS UNDERLAIN BY COARSE- GRAINED SOIL (SECTION D.3.4.2).
30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30)
SHALL BE IMMEDIATELY STABILIZED WfTH THE APPROVED ESC COVER METHODS (E.G.,
8.
SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR
SEEDING, MULCHING, PLASTIC COVERING, ETC.).
THE SPECIFIED DESIGN FLOW (SECTION D.3.5).
9.
SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS
9.
WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6).
CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
gyp,
PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3).
10.
COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE
11.
ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE
SURFACE WATER DESIGN MANUAL.
SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND
FILTER SYSTEMS, OR HOLDING TANKS.
11.
ANY AREA NEEDING ESC MEASURES, NOT REQULRINQ IMMEDIATE ATTENTION, SHALL BE
12.
THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY
ADDRESSED WITHIN SEVEN (7) DAYS.
(SECTION D.5.4).
12.
THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL
BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN
12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE
BEGINNING
OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL
BE REVIEWED
TO IDENTIFY
WHICH ONES CAN BE SEEDED IN
PREPARATION FOR THE
WINTER RAINS.
DISTURBED
AREAS SHALL BE SEEDED WITHIN
ONE WEEK OF THE
BEGINNING OF
THE WET SEASON. A SKETCH MAP OF THOSE
AREAS TO BE SEEDED AND
THOSE AREAS
TO REMAIN
UNCOVERED SHALL BE SUBMITTED
TO THE CITY OF RENTON
FOR REVIEW.
2 -3 TONS PER ACRE
4
MYLAIR StlBMIlTTAL
cr z workr,o Days error You CV
811
WArAna;wN
IL
7 r
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT -OF -WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
0
CONSULTING ENGINEERS L L C
mm
40 Ot Avenue South
10 ( I I
Suite
EARLY CLE*AM & a� LfflM
Federal Way, WA 98003
E
FEDEJML INY (253) iJt -1113
www.esmcivii.com (425) 297 -99M
Civil Engineering
Lond Surveying Land Planning
Public Works
I Project Monogelnent I Landscape Architecture
ESM
JOB #258 -044 -013
IL
7 r
STRUCTURAL NOTES
1. THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY.
PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A
SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT -OF -WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
0
F'W SLO TAL
ESM
APPLICATION
1
EARLY CLE*AM & a� LfflM
ESM
E
STRAW
2
PLAN CHANCE /1
Eli
M4
4
UNDESIRABLE SEED
3
PLAN CF #AW #2
ESM
AND COARSE MATERIAL
2 -3 TONS PER ACRE
4
MYLAIR StlBMIlTTAL
ESM
1t, A114
BLOWN STRAW. STRAW SHOULD BE CRIMPED TO
N0.
REVISION
BY
DATE
I APPR
DESIGNS
DRAWN:
Q
CHECKED:
APPROVED:
Nm
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
MULCH STANDARDS AND GUIDELINES
MULCH
QUALITY
APPLICATION
MATERIAL
STANDARDS
RATES
REMARKS
STRAW
AIR - DRIED; FREE FROM
2" -3" THICK; 2 -3
COST- EFFECTIVE PROTECTION WHEN APPLIED
UNDESIRABLE SEED
BALES PER 1000 SF OR
WITH ADEQUATE THICKNESS. HAND- APPLICATION
AND COARSE MATERIAL
2 -3 TONS PER ACRE
GENERALLY REQUIRES GREATER THICKNESS THAN
BLOWN STRAW. STRAW SHOULD BE CRIMPED TO
AVOID WIND BLOW. THE THICKNESS OF STRAW
MAY BE REDUCED BY HALF WHEN USED IN
CONJUNCTION WITH SEEDING.
WOOD FIBER
NO GROWTH INHIBITING
APPROX. 25 -30 LBS
SHALL BE APPLIED WITH HYDROMULCHER. SHALL
CELLULOSE
FACTORS
PER 1000 SF OR
NOT BE USED WITHOUT SEED AND TACKIFIER
1000 -1500 LBS PER
UNLESS THE APPLICATION RATE IS AT LEAST
ACRE
DOUBLED. SOME WOOD FIBER WITH VERY LONG
FIBERS CAN BE EFFECTIVE AT LOWER
APPLICATION RATES AND WITHOUT SEED OR
TACKIFIER.
COMPOST
NO VISIBLE WATER OR
2" THICK MIN.;
MORE EFFECTIVE CONTROL CAN BE OBTAINED BY
DUST DURING
APPROX. 100 TONS
INCREASING THICKNESS TO 3". EXCELLENT
HANDLING. MUST BE
PER ACRE (APPROX.
MULCH FOR PROTECTING FINAL GRADES UNTIL
PURCHASED FROM
800 LBS PER YARD)
LANDSCAPING BECAUSE IT CAN BE DIRECTLY
SUPPLIER WITH SOLID
SEEDED OR TILLED INTO SOIL AS AN
WASTE HANDLING
AMENDMENT. SOURCES FOR COMPOST ARE
PERMIT.
AVAILABLE FROM THE KING COUNTY COMMISSION
FOR MARKETING RECYCLABLE MATERIALS AT
(206) 296 -4439.
CHIPPED SITE
AVERAGE SIZE SHALL
2" MINIMUM
THIS IS A COST- EFFECTIVE WAY TO DISPOSE OF
VEGETATION
BE SEVERAL INCHES.
THICKNESS
DEBRIS FROM CLEARING AND GRUBBING, AND IT
ELIMINATES THE PROBLEMS ASSOCIATED WITH
BURNING. GENERALLY, IT SHOULD NOT BE USED
ON SLOPES ABOVE APPROX. 10% BECAUSE OF
ITS TENDENCY TO BE TRANSPORTED BY RUNOFF.
IT IS NOT RECOMMENDED WITHIN 200 FEET OF
SURFACE WATERS. IF SEEDING IS EXPECTED
SHORTLY AFTER MULCH, THE DECOMPOSITION OF
THE CHIPPED VEGETATION MAY TIE UP NUTRIENTS
IMPORTANT TO GRASS ESTABLISHMENT.
VERTICAL NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
8' - 10'
nA1 %1A►11-7r -n ui1r%r
J 1 LLL. 1 LI11 .I L. r V.J 1
OR 2' x 2' WOODEN POST
r
TEMPORARY CONSTRUCTION FENCE DETAIL
NOT TO SCALE
!4, R
CITY OF
RENTON
Planning /Building /Public Works Dept.
* .n ; J
R- 380807
CHECKED FOR COMPLIANCE TO CITY STANDARDS
GREENLEAF
GRADING & T.E.S.C. DETAILS & NOTES
UTILITY PERMIT #14004398
am-
1?,/30/201
GR-02'
Er: o s
•
L
z
C
m
Z
71
m
D
'11
l.!
,z
Z
D
t
L
I
L
3
L
7
J
J
l
O
D
Z
G1
Z
C
m
x ^;
J
77 j
0
yT�1
U O
m
D