Loading...
HomeMy WebLinkAboutR-380904LIJ z U LLJ Of a- a N ch 0 N _o N w 0 a. 0 J Y m Q_ CL X w L 0 z Q ro V 0 0 J Cn S Y m a C O a X LIJ n� 5 t W C a) U a 4i W J �- t- (n i CL TEMPORARY SEDIMENTATION 20 10 0 20 40 SCALE IN FEET EROSION AND CONTROL: 10. 11. 12. 13. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. DURING THE TIME PERIOD OF OCTOBER 1ST INSTALL APPROX. 150± LF PERIMETER PROTECTION A /C07 1. BEFORE ANY CONSTRUCTION OR E /C07 THROUGH MARCH 30TH, ALL PROJECT INSTALL APPROX. 222± LF PERIMETER PROTECTION A /C07 DEVELOPMENT ACTIVITY OCCURS, A z DISTRIBUTED SOIL AREAS GREATER, THAT �o INSTALL TEMPORARY STORM DRAIN INLET PRE - CONSTRUCTION MEETING MUST BE HELD 3 ARE TO BE LEFT UN- WORKED FOR MORE C /C07 WITH THE CITY OF RENTON, PUBLIC WORKS THAN 12 HOURS, SHALL BE COVERED BY PROTECTION ON ALL CATCH BASINS & INLETS IN EX C /C07 DESIGN ENGINEER. PARKING AREA MULCH, SODDING OR PLASTIC COVERING. O 2. THE BOUNDARIES OF THE CLEARING LIMITS 14. ANY PERMANENT RETENTION /DETENTION J AND AREAS OF VEGETATION PRESERVATION FACILITY USED AS A TEMPORARY SETTLING 0 - AS PRESCRIBED ON THE PLAN(S) SHALL BE INSTALL APPROX. 87± LF OF TEMPORARY TREE BASIN SHALL BE MODIFIED WITH THE 7 PROTECTION FENCING (CHAIN LINK) CLEARLY FLAGGED BY SURVEY TAPE OR NECESSARY EROSION CONTROL MEASURES Z 8 FENCING IN THE FIELD PRIOR TO B/C07 AND SHALL PROVIDE ADEQUATE STORAGE Y - CONSTRUCTION IN ACCORDANCE WITH INSTALL APPROX. 161± LF PERIMETER PROTECTION CAPACITY. IF THE PERMANENT FACILITY IS TO APPENDIX D OF THE SURFACE WATER DESIGN 11 FUNCTION ULTIMATELY AS AN INFILTRATION A /C07 MANUAL AND OBSERVED DURING E /C07 SYSTEM, THE TEMPORARY FACILITY MUST BE Q CONSTRUCTION. DURING THE CONSTRUCTION PROTECTION FENCING (CHAIN LINK) ROUGH GRADED SO THAT THE BOTTOM AND 0. CLEARING LIMITS PERIOD, NO DISTURBANCE BEYOND THE SIDES ARE AT LEAST THREE FEET ABOVE THE z 14 CLEARING LIMITS SHALL BE PERMITTED. THE - FINAL GRADE OF THE PERMANENT FACILITY. O CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC SUPERVISOR FOR THE 15. PRIOR TO THE BEGINNING OF THE WET 16 INSTALL APPROXIMATELY 213 LF STRAW WATTLES E /C07 17 SEASON (OCT. 1), ALL DISTURBED AREAS I­' DURATION OF CONSTRUCTION. SHALL BE REVIEWED TO IDENTIFY WHICH Z 3. STABILIZED CONSTRUCTION ENTRANCES ONES CAN BE SEEDED IN PREPARATION FOR w SHALL BE INSTALLED AT THE BEGINNING OF THE WINTER RAINS. DISTURBED AREAS SHALL CONSTRUCTION AND MAINTAINED FOR THE BE SEEDED WITHIN ONE WEEK OF THE DURATION OF THE PROJECT. ADDITIONAL BEGINNING OF THE WET SEASON. A SKETCH MEASURES, SUCH AS CONSTRUCTED WHEEL MAP OF THOSE AREAS TO BE SEEDED AND U) WASH SYSTEMS OR WASH PADS, MAY BE THOSE AREAS TO REMAIN UNCOVERED SHALL (n REQUIRED TO ENSURE THAT ALL PAVED BE SUBMITTED TO THE CITY OF RENTON FOR Uj AREAS ARE KEPT CLEAN AND TRACK OUT TO REVIEW. ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. X 4. ALL REQUIRED SEDIMENTATION /EROSION w CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING W AND /OR CONSTRUCTION TO PREVENT U TRANSPORTATION OF SEDIMENT TO SURFACE �- WATER, DRAINAGE SYSTEMS AND ADJACENT �- PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A Z SATISFACTORY CONDITION UNTIL SUCH TIME �' U) THAT CLEARING AND /OR CONSTRUCTION IS < COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. 5. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE o °` INTENDED TO BE MINIMUM REQUIREMENTS TO w MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND ° '"�' UNEXPECTED OR SEASONAL CONDITIONS I �..:,. DICTATE, THE PERMITTEE SHALL ANTICIPATE ... THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON zz THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE X PERMITTEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE X, ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO r- "''\ PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. -X',- ��bHT X-1 6. APPROVAL OF THIS PLAN IS FOR o EROSION /SEDIMENTATION CONTROL ONLY. IT ` DOES NOT CONSTITUTE AN APPROVAL OF 19 \\ , STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS OR RETENTION FACILITIES. 7. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE a. ° LLL DISTURBED FOR TWO DAYS DURING THE WET :....: ' a SEASON (OCTOBER 1 ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY =-=... _ .............................: :.......... :::.................... SEASON (APRIL 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODSs,r (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). ...... ................ ............... ........... 8. WET SEASON SEASONAL EROSION AND =. . - SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 9. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. _,: BEFORE YOU DIG Av 1- 800 -424 -5555 C.> (UNDERGROUND UTILITY LOCATIONS ARE APPROX.) BASE MAP/TOPOGRAPHY PROVIDED BY OTHERS. DCG CANNOT BE HELD LIABLE DAVIDO FOR ACCURACY. CONTRACTOR SHALL CONSULTINGGROUP, INC. FIELD VERIFY GRADES. UTILITIES. AND ALL OTHER EXISTING FEATURES AND Civil • Structural ■ Land Use CONDITIONS. IF CONDITIONS ARE NOT AS SHOWN AND /OR PLANS CANNOT BE 1501-9 Bothell Way NE. Suite 600 CONSTRUCTED AS SHOWN, CONTACT Lake Forest Park, WA 98155 DCG PRIOR TO CONSTRUCTION. '106.5-233.0024 P.O. Box 1132 Freeland, WA 98249 360.331.4131 CONSTRUCTION ACTIVITY SCHEDULE- 1 . PRE - CONSTRUCTION MEETING. 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN). 3. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION IF REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7. CONSTRUCT SEDIMENT PONDS AND TRAPS. 8. GRADE AND STABILIZE CONSTRUCTION ROADS. 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. :....: R... . S. DA ._ of W , �O O 33723 GI S T ERA NAL NO. REVISION KEY NOTES KEY DESCRIPTION DETAIL /SHEET 1 INSTALL APPROX. 150± LF PERIMETER PROTECTION A /C07 z C z E /C07 2 INSTALL APPROX. 222± LF PERIMETER PROTECTION A /C07 A z E /C07 �o INSTALL TEMPORARY STORM DRAIN INLET SURFACE WATER DESIGN MANUAL. 3 PROTECTION C /C07 INSTALL TEMPORARY STORM DRAIN INLET 4 PROTECTION ON ALL CATCH BASINS & INLETS IN EX C /C07 PARKING AREA D INSTALL APPROX. 107± LF OF TEMPORARY TREE 5 PROTECTION FENCING (CHAIN LINK) D /C07 USE EX CONC DRIVEWAY AS CONSTRUCTION 6 ENTRANCE - INSTALL APPROX. 87± LF OF TEMPORARY TREE 7 PROTECTION FENCING (CHAIN LINK) D /C07 INSTALL TEMPORARY STABILIZED CONSTRUCTION 8 ENTRANCE B/C07 9 REMOVE EXISTING TREE - 10 INSTALL APPROX. 161± LF PERIMETER PROTECTION A/C07 E /C07 11 INSTALL APPROX. 68± LF PERIMETER PROTECTION A /C07 E /C07 INSTALL APPROX. 54± LF OF TEMPORARY TREE 12 PROTECTION FENCING (CHAIN LINK) D /C07 13 CLEARING LIMITS - CONTRACTOR TO SWEEP STREET DAILY OR MORE 14 OFTEN IF NECESSARY TO REMOVE TRACKED - SEDIMENT FROM THE SITE 15 INSTALL APPROXIMATELY 154 LF STRAW WATTLES E /C07 16 INSTALL APPROXIMATELY 213 LF STRAW WATTLES E /C07 17 INSTALL APPROXIMATELY 40 LF STRAW WATTLES E /C07 ..... .... ........._.._._....... ._.................._....._.... _....._.............._ ......_....,.__...... .. ._.. .... -.. __ _. ..........,.._.... __._.._ 14 SW 16TH STREET SURVEYED: DESIGNED: TIM GABELEIN DRAWN: NATHAN DAVIS CHECKED: ERIK DAVIDO BY DATE APPR AEON ERIK DAVIDO SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL NAD 1983/1991 DATU M � - CITY OE RENTON Planning /Building /Public Works Dept. CONTRACTOR 1. STAKE OFF AND MARK INFILTRATION AREAS TO PREVENT COMPACTION BY EQUIPMENT AND TRAFFIC. 2. SEDIMENT AND RUNOFF MUST BE KEPT AWAY FROM INFILTRATION AREAS. 3. ONLY LOW PRESSURE TIRE OR TRACK VEHICLES SHALL BE OPERATED OVER THE INFILTRATION SYSTEMS DURING CONSTRUCTION. COMPACTION EQUIPMENT SHALL BE LIMITED TO A MAXIMUM GROSS VEHICLE WEIGHT OF SIX (6) TONS. TRIAXIAL DUMP TRUCKS AND DIRT PANS SHALL NOT BE OPERATED IN THE INFILTRATION SYSTEM FOOTPRINT AT ANY TIME. WHERE NECESSARY, THE HEAVY EQUIPMENT SHOULD UNLOAD IN AN AREA ADJACENT TO THE INFILTRATION SYSTEM AND THE MATERIAL SHOULD BE MOVED OVER THE SYSTEM WITH TRACKED EQUIPMENT. WINTER GRADING NOTE: 1. FROM OCTOBER 1 THROUGH APRIL 30, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN 2 DAYS. FROM MAY 1 THROUGH SEPTEMBER 30, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN 7 DAYS. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT OR STORMWATER RUNOFF BY VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS, FILTERS, BERMS, OR OTHER SUITABLE METHOD TO INSURE THEIR PROPERTY IS NOT DAMAGED. R- 380904 IN COMPLIANCE WITH CITY OF RENTON STANDARDS BY Date: • Zv /= BY: Date: BY: Date: BY: Date: DATE: SHUTTLE EXPRESS - RENTON PARKING LOT 2/10/2015 800 SW 16TH ST nano°°" PAGE RENTON, WA 0PAIIIIIIINIG No: TESC PLAN C04 am: g OF: �\,.IIN I N\,' N\'�' s m z � z Z D 0 D Z G1 Z C 9 m m t x T 8 ": -- x z C z Z f 1 *INSTALL PERIMETER PROTECTION SUCH AS SILT FENCING, COMPOST SOCKS OR A z STRAW WATTLES IN ACCORDANCE WITH APPENDIX D OF THE 2009 KING COUNTY �o SURFACE WATER DESIGN MANUAL. z m m INFILTRATION PROTECTION AREA GENERAL NOTES FOR D CONTRACTOR 1. STAKE OFF AND MARK INFILTRATION AREAS TO PREVENT COMPACTION BY EQUIPMENT AND TRAFFIC. 2. SEDIMENT AND RUNOFF MUST BE KEPT AWAY FROM INFILTRATION AREAS. 3. ONLY LOW PRESSURE TIRE OR TRACK VEHICLES SHALL BE OPERATED OVER THE INFILTRATION SYSTEMS DURING CONSTRUCTION. COMPACTION EQUIPMENT SHALL BE LIMITED TO A MAXIMUM GROSS VEHICLE WEIGHT OF SIX (6) TONS. TRIAXIAL DUMP TRUCKS AND DIRT PANS SHALL NOT BE OPERATED IN THE INFILTRATION SYSTEM FOOTPRINT AT ANY TIME. WHERE NECESSARY, THE HEAVY EQUIPMENT SHOULD UNLOAD IN AN AREA ADJACENT TO THE INFILTRATION SYSTEM AND THE MATERIAL SHOULD BE MOVED OVER THE SYSTEM WITH TRACKED EQUIPMENT. WINTER GRADING NOTE: 1. FROM OCTOBER 1 THROUGH APRIL 30, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN 2 DAYS. FROM MAY 1 THROUGH SEPTEMBER 30, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN 7 DAYS. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT OR STORMWATER RUNOFF BY VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS, FILTERS, BERMS, OR OTHER SUITABLE METHOD TO INSURE THEIR PROPERTY IS NOT DAMAGED. R- 380904 IN COMPLIANCE WITH CITY OF RENTON STANDARDS BY Date: • Zv /= BY: Date: BY: Date: BY: Date: DATE: SHUTTLE EXPRESS - RENTON PARKING LOT 2/10/2015 800 SW 16TH ST nano°°" PAGE RENTON, WA 0PAIIIIIIINIG No: TESC PLAN C04 am: g OF: �\,.IIN I N\,' N\'�' s m z � z Z D 0 D Z G1 Z C 9 m m T 8 ": -- x O v 2 z 1 D z �o T 8 O D - C