HomeMy WebLinkAboutR-380908LLJ
Z
LAJ
U
7)
a
M
M
Ln
0
N
0
r-
N
w
Q
0
0
J
a-
3
v
0
J
rn
Y
M
Q_
N
N
N
Q
X
w
a�
t
c�
_z
Q
a:
0
0
0
J
rn
Y
Q_
C
0
C
n�
o:
a
X
w
a>'
t
5i
0
U
Qr
W
W
J
L�
�/
1
�U)
U)
I
0.
0.
J
Z
Y
Q
Z
O
z
w
o�
w
a
X
w
w
z
CURB RAMP WIDTH 4'- 0" MIN_ LANDING TO MATCH
o CURB RAMP WIDTH - SEE CONTRACT PLANS
a
I
GRADE BREAK LANDING ..
m
GRADE BREAK SEE CONTRACT PLANS CURB RAMP
I r'- 4- - 0" MIN. CEMENT CONCRETE SIDEWALK -
SEE CONTRACT PLANS - I Z-CURS
PROMI DE SM OQTH SEE M07E 5 4 - D" MIN. � CEWNT CONCRETE TRANSITION TO SIDEWALK - SEE NOTE 5 VSID WALKP � SEE CONTRACT PLANS - � d' - a" MIN _ wuuc
FLARE3A" EXPANSION JONT (TYP.) M SEE
srANAARO PLAN F X10
GRADE BREAK
N13" EXPANS ION JOINT (TYR.) SEE RAMP
STANDARD PLAN F�Q.10
yr
I
#
MOTES
C IJRB RAMP WIDTH 4' - a "MIN N.
1.
provide a separate Curb Ramp for each awked or unmarked crosswa Ik.
LANDING TO MATCH CURB RAMP
A'/
Curb Ramp location shall be placed within the width of the associaked
WIDTH SEE CONTRACT PLANS
0 -10
cnosswsllk or as shown in the Contract Plans.
0 -5
SLOPE VARIES
� -- GRADE BREAK
2.
1IUflere "G RADE B REAI'C' is ca I led out the enti re length of the g rude
METHOD
� .....�.::.,.,, ,.;..;.....,,
LOW PERMEABILITY
NO. 30 MAX.
break belvween the two s4 ace nt swftce planes shall be flush.
BACKFILL TO
D 4491
3.
Do not place Gratings, J u action Boxes, Access Comers, o r other a pp ur *-
-
D 4632
a,� _
160 LB MIN.
n a noes in front of the Curb Ramp or on any part of the Curb Ramp or
\
I
MIN. ' SEE CONTRACT PLANS -
Landing.
2. onl
MAx-
i " ' -
4.
See the Contract plans for the curb design specified. See Standard Plan
2:50%
CONSTRUCTION GEOTEXTILE
BUFFER WIDTH -- MATCH TO
FOR SEPARATION, NON -WOVEN
F -10.12 fa r Cu rb, Cu rb and G utter, Depressed C urb and Gutter, and
SECURE TO CONC CURB; WHERE NO
FROM HEAVY EQUIPMENT WHEREVER
�CURB RAMP DEPTH (TYR)
POSSIBLE (SEE NOTE 3 BELOW)
pedestrian Curb details.
I
•ti
140 LB MIN.
270 LB MIN.
180 LB MIN.
PUNCTURE RESISTANCE
5.
See Stsndar+d Plan F -3x.10 for Cement Concrete Sidewalk details.
GRADE ? �^ ---_ ,, rr
BREAK `'a: TRANSITION TO SIDEWALK BUFFER, IF % � See Gontract Plans f6r width and placement of sidewalk.
PRESENT. OR TO BACK OF CURB (TYP.)
3 6. The Bid Item "Cement Concrete Curb Ramp Type does not include
. » »» SEE TRACT LAN •'
CON PLANS
t'o 09G . ».. »:. IIAAX• _ __ ___ - -- Gutter, Depressed b ,
�1. ���•�.NNY �• ID• C V G
1
Pedeatr'ia n Curb, or Sidewa I k.
CURB, OR CURB --- - -�
_ -� -- � CEMENT CONCRETE
AND GUTTER , CURB. OR CURB {r 'ti ��
SEE NpTE 4 _ -- -- - AND GUTTER � -� PEDESTRIAN CURB �• 7. The Curb Ramp maximum running sbpe shah not t�aquire the ramp length
- DETECTABLE WARNING SURFACE -� SEE NOTE 4 SEE NOTE d to exceed 15- f+ee�t to avoid chasing the slope irxlefinilely *ten connecting
SEE STANDARD PLAN F46.10 �. DETECTABLE WAR N I NG SU RFACE - to �p grades. When applying the 154aot maximum Iength, the run ring
FACE OF CURB / - f L SEE STANDARD PLAN F -4b.io slope at the Curti Ramp MA as tat as %asib e.
FACE O F C UR8 .;
8. Curb Ramp, Landi and Flares shall rewive broom finish. See
�11SURED PARALLEL � � 1�` DEPRESSED CURB AND GUTTER 4 � �'� DEPRESSED CUR6/lND GUTTER p �
TO CURB (TYP.) J CROSS1tW11LK SEE NOTE 4 CROSSWALK Standard Spec lflCatlOflS 8-14.
LEGEND
SLOPE IN EITHER DIRECTION
PLAN VIEW PLAN VIEW
TYPE PERPENDK±ULAR A TYPE PERPENDICULAR. B
DETECTABLE WARNING SURFACE -
SEE STANDARD FLAN F -4s.io
4 - Cr PAIN. 15'- 0" MAX.
SEE CONTRACT PLANS SEE NOTE 7 �
SLOPE TREATMENT -• t,
SEE STANDARD PLAN F41ILI0 r- GRADE BREAK 1
2.0% MAX. rrr
$.39� MAX �
L AMNO CURB RAMP �• i r
SECTION A
CALL 2 DAYS
BEFORE YOU DIG
1- 800 - 424 -5555
(UNDERGROUND UTILITY
LOCATIONS ARE APPROX.)
(SHOWN WITH BUFFER) CEMENT CONCRETE
PEDESTRIAN CURB - -- _
SEE NOTE 4
- GRADE BREAK ,
r' COUNTER SLOPE -•
&0% MAX- 3" R. TYP.
TOP OF ROADWAY '
DETECTABLE WARNING SURFACE -
•; SEE STANDARD PLAN F-0.10
►,� DEPRESSED CURB AND GUTTER -
SEE NOTE 4
.�
__MM ENT CONCRETE CURB
' `C AND GUTTER - SEE NOTE 4
DEPRESSED CURB AND GUTTER -
SEE STANDARD PLAN F40.12
CEMENT CONCRETE CURB RAMP 'TYPE
MIT -
ISOMETRIC VIEW
TYPE PERPENDICULAR A PAY LIMIT
cuRS w►aus DETAIL O
PERPENDICULAR CURB RAMP �
PER WSDOT STD PLAN F- 40.15 -02 �O3
NTS
BASE MAP/TOPOGRAPHY PROVIDED BY
OTHERS. DCG CANNOT BE HELD LIABLE
FOR ACCURACY. CONTRACTOR SHALL DAVIDO CONSULTINGGROUP, INC.
FIELD VERIFY GRADES. UTILITIES, AND
ALL OTHER EXISTING FEATURES AND Civil Structural Land Use
CONDITIONS. IF CONDITIONS ARE NOT
AS SHOWN AND /OR PLANS CANNOT BE 1 5029 Bothell Way NE, Suite 600
CONSTRUCTED AS SHOWN, CONTACT Lake Forest Park, WA 98155
DCG PRIOR TO CONSTRUCTION.
_106.523.00-14
P.O. Box 1132
Freeland. WA 98249
360.331.4131
of wD
A Sy, O
Aim
O 33723
X111 F% G /STER���j�
S�ONAL
ISOMETRIC VIEW
TYPE PERPENDICULAR B PAY LIMIT
NO.
REVISION
4" PERMEABLE
HMA TOP COURSE
(SEE NOTE 5 BELOW)
2" CHOKER COURSE
(SEE NOTE 1 BELOW)
6" DEEP CONC F
TRAFFIC CURB
PER DETAIL C07
6" PERMEABLE BALLAST
% PASSING
1'/2"
(SEE NOTE 2 BELOW)
1"
95 -100
A'/
25 -60
4
0 -10
8
0 -5
SLOPE VARIES
75 MIN.
NONWOVEN
GEOTEXTILE PROPERTY
METHOD
� .....�.::.,.,, ,.;..;.....,,
LOW PERMEABILITY
NO. 30 MAX.
NO. 40 MAX.
BACKFILL TO
D 4491
0.02 SEC -1 MIN.
0.10 SEC -1 MIN.
NATIVE SOIL
D 4632
\ \ \
160 LB MIN.
\
\
MACHINE AND X- MACHINE DIRECTION
GRAB FAILURE STRAIN, IN MACHINE
D 4632
< 50%
2:50%
CONSTRUCTION GEOTEXTILE
SUBGRADE TO BE PROTECTED FROM
FOR SEPARATION, NON -WOVEN
COMPACTION DURING CONSTRUCTION
SECURE TO CONC CURB; WHERE NO
FROM HEAVY EQUIPMENT WHEREVER
CURB, FOLD OVER WASHED DRAIN ROCK
POSSIBLE (SEE NOTE 3 BELOW)
(SEE NOTE 4 BELOW)
PERMEABLE PAVEMENT
CROSS - SECTION FOR
LIGHT LOADS
NTS CO3 k,.& 1305
PERMEABLE PAVEMENT NOTES.
1. CHOKER COURSE FOR PERVIOUS HMA
CHOKER COURSE FOR PERVIOUS HMA SHALL BE 3/8- TO 3/4 -INCH
UNIFORMLY GRADED STONE WITH A WASH LOSS OF NO MORE THAN
0.5% ( AASHTO SIZE NUMBER 57) AND SHALL MEET THE FOLLOWING
REQUIREMENTS FOR GRADING AND QUALITY:
SIEVE SIZE
% PASSING
1'/2"
100
1"
95 -100
' /z"
25 -60
4
0 -10
8
0 -5
AGGREGATE STORAGE LAYER - 6" DEPTH MIN. (GRADATION FROM
WSDOT SPECS)
2. PERMEABLE BALLAST
PERMEABLE BALLAST SHALL MEET THE REQUIREMENTS OF SECTION
9- 03.9(1) FOR BALLAST EXCEPT FOR THE FOLLOWING SPECIAL
REQUIREMENTS. THE GRADING AND QUALITY REQUIREMENTS ARE:
SIEVE SIZE
% PASSING
2'/2"
100
2"
65 -100
3/4"
40 -80
NO. 4
5 MAX.
NO. 100
0 -5
% FRACTURE
75 MIN.
ALL PERCENTAGES ARE BY WEIGHT.
3.SUBGRADE FOR PAVEMENT
THE CONTRACTOR SHALL NOT STOCKPILE MATERIALS WITHIN THE
PERVIOUS PAVEMENT AREAS EXCEPT THAT IF THE CONTRACTOR
CHOOSES TO STOCKPILE MATERIALS WITHIN THE PERVIOUS PAVEMENT
AREA THE AREA SHALL NOT BE GRADED BELOW THE FINISH GRADE
LEAVING A MINIMUM OF 15" OF NATIVE MATERIAL IN PLACE UNTIL
IMMEDIATELY PRIOR TO CONSTRUCTION OF THE PERVIOUS PAVEMENT
SYSTEM. TEMPORARY CONSTRUCTION ENTRANCE MATERIALS, IF
LOCATED IN THE PERVIOUS PAVEMENT AREA, SHALL BE FULLY
REMOVED PRIOR TO SUBGRADE PREPARATION. CONSTRUCTION
EQUIPMENT SHALL BE PROHIBITED FROM PERVIOUS PAVEMENT AREAS
UNLESS THE SUBGRADE IS PROTECTED AS SPECIFIED FOR
STOCKPILING IN THE PERVIOUS AREA OR THE GEOTEXTILE AND FULL
DEPTH OF BASE ROCK ARE IN PLACE PER THE PLANS. IF THE ENGINEER
DETERMINES THAT THE PERVIOUS PAVEMENT BASE ROCK HAS BEEN
CONTAMINATED OR DAMAGED BY CONSTRUCTION EQUIPMENT THE
CONTRACTOR SHALL REMOVE AND REPLACE A DEPTH OF BASE ROCK
AS DIRECTED BY THE ENGINEER AND NO ADDITIONAL PAYMENT WILL BE
MADE FOR THE REMOVED AND REPLACED BASE ROCK.
THE ENGINEER WILL INSPECT THE SUBGRADE AND UNLESS
OTHERWISE DIRECTED BY THE ENGINEER THE CONTRACTOR SHALL
REMOVE ANY ACCUMULATION OF FINE MATERIAL, SCARIFY THE THE
SOIL TO A MINIMUM DEPTH OF 6 INCHES, AND COMPACT THE
SUBGRADE TO THE APPROPRIATE COMPACTION.
SURVEYED:
DESIGNED:
TIM GABELEIN
DRAWN:
NATHAN DAVIS
CHECKED:
ERIK DAVIDO
BY DATE APPR APPROVM.
ERIK DAVIDO
R- 380908
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL• MD 1983/1991
DATUM
6" PERMEABLE
HMA TOP COURSE
(SEE NOTE 5 BELOW)
2" CHOKER COURSE
(SEE NOTE 1 BELOW)
12" PERMEABLE BALLAST
(SEE NOTE 2 BELOW)
x �X,
X
\\
6" DEEP CONC F
TRAFFIC CURB
PER DETAIL �O7
R
SLOPE VARIES
LOW PERMEABILITY
\":: "1:; • BACKFILL TO
_ NATIVE SOIL
CONSTRUCTION GEOTEXTILE
SUBGRADE TO BE PROTECTED FROM FOR SEPARATION, NON -WOVEN
COMPACTION DURING CONSTRUCTION) SECURE TO CONC CURB: WHERE NO
FROM HEAVY EQUIPMENT WHEREVER CURB. FOLD OVER WASHED DRAIN ROCK
POSSIBLE (SEE NOTE 3 BELOW) (SEE NOTE 4 BELOW)
PERMEABLE PAVEMENT
CROSS - SECTION FOR
HEAVY LOADS L2
NTS CO3 & C05
4. GEOTEXTILE FOR SEPARATION OR SOIL STABILIZATION
5. PERVIOUS HOT MIX ASPHALT
MIX DESIGN
- PRIOR TO THE PRODUCTION OF PHMA, THE CONTRACTOR SHALL DETERMINE A DESIGN
a. GENERAL
AGGREGATE STRUCTURE AND ASPHALT BINDER CONTENT IN ACCORDANCE WITH WSDOT STANDARD
OPERATING PROCEDURE 732. ONCE THE DESIGN AGGREGATE STRUCTURE AND ASPHALT BINDER CONTENT
HAVE BEEN DETERMINED, THE CONTRACTOR SHALL SUBMIT THE PHMA MIX DESIGN ON DOT FORM 350 -042
DEMONSTRATING THE DESIGN MEETS THE REQUIREMENTS OF SECTIONS 9- 03.8(2) AND 9- 03.8(6) OF THE
WSDOT STANDARD SPECIFICATIONS. VERIFICATION OF THE MIX DESIGN BY THE CONTRACTING AGENCY IS
NOT NEEDED.
b. THE MIX DESIGN WILL BE THE INITIAL JOB MIX FORMULA (JMF) FOR THE CLASS OF MIX. ANY ADDITIONAL
ADJUSTMENTS TO THE JMF WILL REQUIRE THE APPROVAL OF THE PROJECT ENGINEER AND MAY BE MADE
PER SECTION 9- 03.8(7) OF THE WSDOT STANDARD SPECIFICATIONS.
c. NON STATISTICAL EVALUATION - NON STATISTICAL ACCEPTANCE WILL APPLY TO ALL PHMA NOT
DESIGNATED AS COMMERCIAL PHMA IN THE CONTRACT DOCUMENTS. NON STATISTICAL ACCEPTANCE
TESTING WILL BE CONDUCTED AS OUTLINED IN 5- 04.3(8) A OF THE WSDOT STANDARD SPECIFICATIONS.
d. COMMERCIAL EVALUATION. WHERE COMMERCIAL PHMA IS ALLOWED IT CAN BE ACCEPTED BY A
MANUFACTURER'S CERTIFICATE OF COMPLIANCE STATING THE MATERIAL MEETS THE REQUIREMENTS IN
THE CONTRACT. WHERE PHMA COMMERCIAL IS USED FOR THE TRAVELED WAY. A MINIMUM OF ONE
ACCEPTANCE TEST TO VERIFY GRADATION, FRACTURE, SAND EQUIVALENT, AND OIL CONTENT IS REQUIRED
IN ADDITION TO THE MANUFACTURER'S CERTIFICATE OF COMPLIANCE.
e. HOT MIX ASPHALT (HMA) PAVING CLASS '/2" PG 70 -22, POLYMER MODIFIED, WITH 5 POUNDS OF FIBER PER
TON OF ASPHALT MIX, THICKNESS AS INDICATED ON PLANS, CONFORMING TO AASHTO MP -1. PRIOR TO THE
PRODUCTION OF PHMA THE CONTRACTOR SHALL DETERMINE A DESIGN AGGREGATE STRUCTURE AND
ASPHALT BINDER CONTENT IN ACCORDANCE WITH NAPA INFORMATION SERIES 131 APPENDIX A. THE
PERCENT ASPHALT BINDER IN THE PHMA SHALL BE 6.0 TO 6.5 PERCENT BY DRY WEIGHT OF MIX.
ACCEPTANCE SAMPLING AND TESTING - PHMA MIXTURE
a. GENERAL - ACCEPTANCE OF PHMA SHALL BE AS PROVIDED UNDER NON - STATISTICAL OR COMMERCIAL
EVALUATION. SAMPLING OF PHMA FOR NON - STATISTICAL EVALUATION WILL BE AS DISCUSSED IN THE
WSDOT STANDARD SPECIFICATIONS, SECTION 5- 04.3(8) A. SECTIONS 3 THROUGH 6. COMMERCIAL
EVALUATION WILL BE USED FOR COMMERCIAL HMA AND OTHER CLASSES OF HMA FOR AMOUNTS LESS THAN
2500 TONS IN ANY APPLICATION. TESTING BEYOND THAT SPECIFIED IN 5- 04.3(7) A, ITEM 3 FOR COMMERCIAL
HMA WILL BE AT THE DISCRETION OF THE ENGINEER.
b. AGGREGATES - THE ACCEPTANCE CRITERIA FOR AGGREGATE PROPERTIES OF SAND EQUIVALENT, VOIDS
IN MINERAL AGGREGATE (VMA), FRACTURE AND GRADATION WILL BE THEIR CONFORMANCE TO THE
REQUIREMENTS OF SECTION 9- 03.8(2) THE WSDOT STANDARD SPECIFICATION.
PHMA DEVIATION
NO. 4 SIEVE AND LARGER
GEOTEXTILE PROPERTY REQUIREMENTS
NO. 6 SIEVE TO NO. 8 SIEVE
ASTM
SEPARATION
SOIL STABILIZATION
ASPHALT BINDER %
TEST
_-
^- 'T= 77
:r
WOVEN I
NONWOVEN
WOVEN
NONWOVEN
GEOTEXTILE PROPERTY
METHOD
AOS
D 4751
NO. 30 MAX.
NO. 40 MAX.
WATER PERMITTIVITY
D 4491
0.02 SEC -1 MIN.
0.10 SEC -1 MIN.
GRAB TENSILE STRENGTH, IN
D 4632
250 LB MIN.
160 LB MIN.
315 LB MIN.
200 LB MIN.
MACHINE AND X- MACHINE DIRECTION
GRAB FAILURE STRAIN, IN MACHINE
D 4632
< 50%
2:50%
< 50%
>_ 50%
AND X- MACHINE DIRECTION
SEAM BREAKING STRENGTH
D 4632
220 LB MIN.
140 LB MIN.
270 LB MIN.
180 LB MIN.
PUNCTURE RESISTANCE
D 6241
495 LB MIN.
310 LB MIN.
620 LB MIN.
430 LB MIN.
TEAR STRENGTH, IN MACHINE AND
D 4533
80 LB MIN.
50 LB MIN.
112 LB MIN.
79 LB MIN.
X- MACHINE DIRECTION
ULTRAVIOLET (UV) RADIATION
50% STRENGTH RETAINED MIN., AFTER 500 HOURS IN
STABILITY
D 4355
XENON ARC DEVICE
5. PERVIOUS HOT MIX ASPHALT
MIX DESIGN
- PRIOR TO THE PRODUCTION OF PHMA, THE CONTRACTOR SHALL DETERMINE A DESIGN
a. GENERAL
AGGREGATE STRUCTURE AND ASPHALT BINDER CONTENT IN ACCORDANCE WITH WSDOT STANDARD
OPERATING PROCEDURE 732. ONCE THE DESIGN AGGREGATE STRUCTURE AND ASPHALT BINDER CONTENT
HAVE BEEN DETERMINED, THE CONTRACTOR SHALL SUBMIT THE PHMA MIX DESIGN ON DOT FORM 350 -042
DEMONSTRATING THE DESIGN MEETS THE REQUIREMENTS OF SECTIONS 9- 03.8(2) AND 9- 03.8(6) OF THE
WSDOT STANDARD SPECIFICATIONS. VERIFICATION OF THE MIX DESIGN BY THE CONTRACTING AGENCY IS
NOT NEEDED.
b. THE MIX DESIGN WILL BE THE INITIAL JOB MIX FORMULA (JMF) FOR THE CLASS OF MIX. ANY ADDITIONAL
ADJUSTMENTS TO THE JMF WILL REQUIRE THE APPROVAL OF THE PROJECT ENGINEER AND MAY BE MADE
PER SECTION 9- 03.8(7) OF THE WSDOT STANDARD SPECIFICATIONS.
c. NON STATISTICAL EVALUATION - NON STATISTICAL ACCEPTANCE WILL APPLY TO ALL PHMA NOT
DESIGNATED AS COMMERCIAL PHMA IN THE CONTRACT DOCUMENTS. NON STATISTICAL ACCEPTANCE
TESTING WILL BE CONDUCTED AS OUTLINED IN 5- 04.3(8) A OF THE WSDOT STANDARD SPECIFICATIONS.
d. COMMERCIAL EVALUATION. WHERE COMMERCIAL PHMA IS ALLOWED IT CAN BE ACCEPTED BY A
MANUFACTURER'S CERTIFICATE OF COMPLIANCE STATING THE MATERIAL MEETS THE REQUIREMENTS IN
THE CONTRACT. WHERE PHMA COMMERCIAL IS USED FOR THE TRAVELED WAY. A MINIMUM OF ONE
ACCEPTANCE TEST TO VERIFY GRADATION, FRACTURE, SAND EQUIVALENT, AND OIL CONTENT IS REQUIRED
IN ADDITION TO THE MANUFACTURER'S CERTIFICATE OF COMPLIANCE.
e. HOT MIX ASPHALT (HMA) PAVING CLASS '/2" PG 70 -22, POLYMER MODIFIED, WITH 5 POUNDS OF FIBER PER
TON OF ASPHALT MIX, THICKNESS AS INDICATED ON PLANS, CONFORMING TO AASHTO MP -1. PRIOR TO THE
PRODUCTION OF PHMA THE CONTRACTOR SHALL DETERMINE A DESIGN AGGREGATE STRUCTURE AND
ASPHALT BINDER CONTENT IN ACCORDANCE WITH NAPA INFORMATION SERIES 131 APPENDIX A. THE
PERCENT ASPHALT BINDER IN THE PHMA SHALL BE 6.0 TO 6.5 PERCENT BY DRY WEIGHT OF MIX.
ACCEPTANCE SAMPLING AND TESTING - PHMA MIXTURE
a. GENERAL - ACCEPTANCE OF PHMA SHALL BE AS PROVIDED UNDER NON - STATISTICAL OR COMMERCIAL
EVALUATION. SAMPLING OF PHMA FOR NON - STATISTICAL EVALUATION WILL BE AS DISCUSSED IN THE
WSDOT STANDARD SPECIFICATIONS, SECTION 5- 04.3(8) A. SECTIONS 3 THROUGH 6. COMMERCIAL
EVALUATION WILL BE USED FOR COMMERCIAL HMA AND OTHER CLASSES OF HMA FOR AMOUNTS LESS THAN
2500 TONS IN ANY APPLICATION. TESTING BEYOND THAT SPECIFIED IN 5- 04.3(7) A, ITEM 3 FOR COMMERCIAL
HMA WILL BE AT THE DISCRETION OF THE ENGINEER.
b. AGGREGATES - THE ACCEPTANCE CRITERIA FOR AGGREGATE PROPERTIES OF SAND EQUIVALENT, VOIDS
IN MINERAL AGGREGATE (VMA), FRACTURE AND GRADATION WILL BE THEIR CONFORMANCE TO THE
REQUIREMENTS OF SECTION 9- 03.8(2) THE WSDOT STANDARD SPECIFICATION.
PHMA DEVIATION
NO. 4 SIEVE AND LARGER
PERCENT PASSING ±4.0
NO. 6 SIEVE TO NO. 8 SIEVE
PERCENT PASSING ±2.0
NO. 100 SIEVE TO NO. 200 SIEVE
PERCENT PASSING ±0.4
ASPHALT BINDER %
PERCENT BINDER CONTENT ±0.5
IN COMPLIANCE WITH CITY OF RENTON
TANDAR S
BY: Date:
BY: Date:
BY. Date:
BY. Date:
CITY OF
SHUTTLE EXPRESS - RENTON PARKING LOT 2/10/2015
800 SW 16TH ST
RENTON P °°"
RENTON, WA NO-
Planning/Building/Public Works Dept. C09
DETAILS 9 °F= 9
T
L
�5
y
x
C
2. 1
_-
^- 'T= 77
:r
f i
x-
-Z
m
z
..
O
D
T
x �^
T -3 J J
�Z
zJ
z
rn
D
0
M
a
z
c�
z
C
3
m
M
M
x
77 --
_-
^- 'T= 77
:r
x-
z
..
O