Loading...
HomeMy WebLinkAboutS-362615T�' c START SIR c z T s3 vz < n ELAPSED a SPD TIME (HOURS) 48OV,3 PHASE - - - -MOTOR STARTER EQUIPMENT IN MCC, SEE SPECIFICATIONS - I CB 1FU I I 2FU 480 VAC TO I 3FU 120 VAC, 10, CPT 0-60 SEC. M M MS SET @ 0 SEC. _ TR LOSS OF POWER RESTART I MOTOR I STARTER I SOLIDI PMR TR1 STATE FF L _ I HAND � � � AUTO I ----------- - - - - -- - - - - -- v FROM RTU PUMP CALL I I II I I I I 7 - - -I I I I I I I I I I I I I I I I I I I I I I MTR Ii - - -- -------------------- - - - - -I I MS AUX I I � I I I I I I I I I MS AUX I I I I I I I I OIL I I I Cl I I I I Cl 1 I I I I I I I I CR4 I I I I I I I I 4FU c 24VAC I I I I I I I I I I I 1 I i I I I I 1 ' 2 24VAC T2 5 I 10 24VAC T1 T I I I I 1 120VAC CT 3 I CUTOFF I i i i OVERTEMP 4 j LIGHT I 11120VAC LEAK 8 I I CUTOUT LEAK 9 j I j LIGHT I I i l I I I I I I Cl CR3 Cl I I L MP PUMP PUMPS 6 PUMP 6 6 PUMP - - - - — HAND - AUTO - RUN FAIL OVERTEMP DIAGRAM 1: PUMP P -1, P -2 NO SCALE Cl OIL MS PUMP CALL M RTU I OR 2 PUMP RUN I START NAMEPLATE SCHEDULE 1A COUNTS 1E ELAPSED 1G SPD TIME (HOURS) AMMETER DISPLAY 'PUMP RUN PROPOSED CONCRETE PAD HVAC CONTROL PANEL RESETTABLE OPERATION COUNTER PUMP READY LIGHT 2J MANUAL BYPASS ENABLED I C CR lo PUMP FAIL 3 ® "PUMP FAIL" 'EMERGENCY STOP" I J I PUMP SEAL AND THERMAL FAIL RESET PUMP MOTOR I CR EMERGENCYSTOP 4 R lo "PUMP OVERTEMP' CR 5 "PUMP SEAL FAIL" I 5' -0" Ti TYP. —] 1 2 3 0 o o -A 0 -B ® ® -C -D o 0 -E o -F -H -I o -J 0 -K -L MOTOR CONTROL CENTER LAYOUT 1" = i' -0" NAMEPLATE MCC SECTION NAMEPLATE SCHEDULE 1A RUN -TIME METER 1E PHASE FAIL RELAY 1G SPD 11 AMMETER DISPLAY 2A HVAC CONTROL PANEL RESETTABLE OPERATION COUNTER LIGHTING PANELBOARD "L' 2J MANUAL BYPASS ENABLED 3A 0 PUMP OVERTEMP LIGHT PUMP RUN ® Ir�al PUMP SEAL FAIL LIGHT PUMP OVERTEMP ®!J PUMP SEAL FAIL PUMP RUN LIGHT EMERGENCYSTOP MANUAL BYPASS EMERGENCYSTOP ALARM RESET PUMP FAIL LIGHT ELAPSED TIME (HOURS) START COUNTS I�AYK�L`I�I ZH b947�iy:l AMMETER SELECTION SWITCH EMERGENCY STOP BUTTON TYPICAL STARTER PANEL DETAIL MCC CONTROL DEVICES MCC SECTION NAMEPLATE SCHEDULE 1A POWER MONITOR 1E PHASE FAIL RELAY 1G SPD 11 MCC MAIN LUGS 2A HVAC CONTROL PANEL 2F LIGHTING PANELBOARD "L' 2J LIGHTING TRANSFORMER 3A PUMP NO. 1, P -1 PUMP RUN Q PUMP FAIL L PUMP OVERTEMP UJ PUMP SEAL FAIL i EMERGENCYSTOP MANUAL BYPASS EMERGENCYSTOP ALARM RESET ELAPSED TIME (HOURS) START COUNTS 3G PUMP NO. 2, P -2 PUMP RUN U PUMP FAIL V PUMP OVERTEMP PUMP SEAL FAIL EMERGENCY STOP CUC C MANUALBYPASS EMERGENCYSTOP ALARM RESET ELAPSED TIME (HOURS) J START COUNTS S=3626 15 REVISED TO CONFORM TO CONSTRUCT N RECORDS ✓i i'. 4 l/ / RH2 E EERING INC. DATE SICNE& 0,/16/13 SICNE& 01118113 ,� ♦ M / E �Ni il I N E E ORS PLANNERS SCIENTISTS RH2 ENGINEERING, INC. http, / /www,rh2.com madboxikh2.com 1,800.720.8052 BELLINGHAM 360.66.011 454 West Hartan Road BOTHELL ass.9sl saoD 22722 29th Drive SE Suite 210 EAST WENATCHEE s99.el RD Simon Street, Suite 5 RICHLAND s99.9assr6l 114 Columbia Point Drive, Suite C SILVERDALE 360.816.79ND 2021 N19 khtre Rd, Suite 107 TACOMA 2632729059 621 Pacific Avenue Suite 104 SCALE: SHOWN 0 1" 2" DRAWING IS NOT TO SCALE IF BAR IS NOT 2" LONG Roc 1 D- No ENGNIMi, CCA E04 enii D: MLM DAIS: Nov 11, 2014 SNEET W. Dull REN 15 JOB ND.: 112-M 20 nAu:Nw LIND )- &CONfROLDWG Z W U Q g °C Q L UJ Z o i oC 0 O Z 0 U i V U Q CUC C Z J E �Ni il I N E E ORS PLANNERS SCIENTISTS RH2 ENGINEERING, INC. http, / /www,rh2.com madboxikh2.com 1,800.720.8052 BELLINGHAM 360.66.011 454 West Hartan Road BOTHELL ass.9sl saoD 22722 29th Drive SE Suite 210 EAST WENATCHEE s99.el RD Simon Street, Suite 5 RICHLAND s99.9assr6l 114 Columbia Point Drive, Suite C SILVERDALE 360.816.79ND 2021 N19 khtre Rd, Suite 107 TACOMA 2632729059 621 Pacific Avenue Suite 104 SCALE: SHOWN 0 1" 2" DRAWING IS NOT TO SCALE IF BAR IS NOT 2" LONG Roc 1 D- No ENGNIMi, CCA E04 enii D: MLM DAIS: Nov 11, 2014 SNEET W. Dull REN 15 JOB ND.: 112-M 20 nAu:Nw LIND )- &CONfROLDWG