E_ FLG RE C.21 -A TYPICAL TRENCH LNF1VI'10Vr10_N SCI: Y rE t?I:
rcfof
drain
WM 4" rigib or 6" flexible
pedorated pipe
........ ....................... .... ,
sump w1soiidi lid
4' rigid or 6o f hwible
Wbratsd Pipe
washed rock
1 1/2'-314' �1
LA—VW"---
fAW fabm
6'
t
24-
1
root drain
glow
splash b l
mln, a.�` inirt
' min
fine rriesh ' ` C8 sump wh c, id lid
or-M401
.......M, compacted backfitN
V rigid or 6" flexible
perforalled life
............. wR.At*d rock
1 1/2%34*
SECTION A
.. ...............................
NTS
?(M Surface Winer Design ?Manual Apparniix C
-4S
D TEXT OF INSTRUCTIONS
10i'3009
c�. � , � � ���;.��ax��r�a :3 rs�a� c�r�;�� rc•Yrtc�'
Your property contains a stonnwater management flow control BM€' (best management practice) called a
'perforated pipe connection.` which was installed to reduce the stormwater runoff impacts of some or all of
rw Wnpervious surface on your property A perforated pipe connection is a length of drainage conveyance
pipe wrth holes in the bottom, designed to "leak" runoff, conveyed by the pipe, into a gravel filled trench
where it can be soaked into the surrounding sail. The connection is intended to provide opportunity for
infiltration of any runoff that is being conveyed from an impervious surface (usually a roof) to a local
drainage system such as a ditch or roadway pipe system.
The size and composition of the perforated pipe connection as depicted by the flow control BMP site plan
and design detaitss must be maintained and may not be changed without written approval either from the
King County Water and Land Resources Division or through a future development permit from King
County. The soil overtop of the perforated portion of the system must not be compacted or covered with
Impervious mawals.
FIGURE C.L11.A PERFORATED PIPE CONNECTION FOR A SLNGLE F -MMY RESIDE' ,CE
random fill
6" filter fabric
6" ped pipe
18" R1ir,
--1,r` ' 3/4" washed rock
u
Y
its
F•- 24' min ---
TRENCH X- SECTION
NTS
slope .---..
PLAN VIEW. O.F RAF,
HITS
?GU9 Surface w'aff Design 4i:uwal Appenthx c
C- #I
to road
drainage system
2'X10'
level trench
wiped pipe
I tW2009
OFFE ENGINEERS
13932 SOUTHEAST 159TH PLACE
RENTON, WASHINGTON 98058
PHONE: 425- 260 -3412
CONTACT: DARRELL OFFE, P.E.
A PORTION OF THE NW 1/4, SE 1/4, SECTION 9, TOWNSHIP 23 N., RANGE 5 EAST, W.M., CITY OF RENTON, WASHINGTON
ElFOSI ON =IrWW W Er SEASON FtWU1 RBIENTS
Sites with exposed soils during the WET SEASON (October 1 to April 30) shall be subject to special
erosion control provisions. These special provisions are required in addition to the -d wilard TESC
cover measures. Please notify contractor of these requirements
All projects that dear, grade or otherwise disturb the site, must provide erosion and segment
controls to the maximum extent possible, to prevent the transport of sediment from the project
site to downstream drainage facilities, water resources, and adjacent properties.
The fallowing provisions for wet season construction are detailed in Appendix D of the 2009 IGng
Count Surface Water Manual. Please ensure your site is protected and complies with the special
provisions outlined below. The basic requirements are:
1. The allowed time that a disturbed area can remain unworked without cover measures is
reduced to two (2) days, rather than seven (7) days.
2. Stockpiles, steep cut, and fill slopes are to be covered or protected with mulch, sod, plastic
oovering, jute mat et:;. if left unworked for. more than 12 hours.
3. Cover materials (plastic, matting, etc) sufficient to cover all disturbed areas, shall be
stockpiled and available on site.
4. All areas that are to b.. unworked during the wet season shall be seeded within one week
of the beginning of the wet season. Seeded should be completed by September 23.
5. Mulch is required to protect all seeded areas.
fi. Fifty linear feet of silt fence (and the necessary cakes), per disturbed acre must be
stockpiled on site.
7. Property installed silt fencing is mandatory along the downciope of all disturbed areas of
the site. Perimeter protection filters runoff and reduces the amount of sediment that may
leave the site.
8. Sediment retention is required unless no offsite discharge is anticipated for the specified
design flow.
9. Construction read and parking lot stabilization are required for all sites unless the site is
underlain by course - grained soil.
10. Surf ace water controls are requ i red unless no offsite discharge is anticipated for the
specified design flow.
11. Phasing and more conservative OAPs must be evaluated for construction activity near
surface waters.
12. Any runoff generated by dewatering shall be treated through construction of a segment
trap when there is sufficient space or by releasing the water to a well vegetated, gently
sloping area. Since pumps are used for dewatering, it may be possible to pump the
sediment -laden water well away from the surface water so that vegetation can be more
effectively utilized for treatment. A straw bale filter shall be placed around the gsd W
from the dewatering pump. If there is not space for a sediment trap or 25 feet of suitable
vegetation, other filtration methods shall be required.
13. The frequency of maintenance review should be increased from weekly to daily where
warranted.
MONROE AVE. NORTH
INT'X MONUMENT
FOUND TACK & LEAD
IN MONUMENT CASE
STA. 10 +00, NE 7TH STREET I
z
O
._ _ ... ._.. ..........
.
4_
WY
.t.
�' 1l M N ;
v
V)
7`.
Z wI
t (A l
12 STM (PL
Co
fO
O
AdIL.•,` O • V j
(S3703)
STM PV
1 M
y DO NSPC
Y
10' 15 (Typ.)
f A Z � 1
t
I N �ri "� M Emir M ■
J CZ
•
O CO
..j � y y • ' i y y
.t
•�Y'��1 6.. L
O60
Ttxe0
SITE SURVEY d MAPPING SCALE
SCALE
D.L OFFE, P.E.
•
z�4so •' D. L OFFE P. E. a+�r
• •
0Q /ST0 00 c,- AT FULL Sau.E
J /ONAL 01/26/2015 NO. REVISION BY DATE APPR SCALE ACCOMMLY
NOTEI
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE
APPROXIMATE ONLY, IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND
HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO
REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES
NOT SHOWN IN THEIR PROPER LOCATION.
CALL BEFORE YOU DIG, 811
MAXIMUM 2,600 SQUARE FEET OF
IMPERVIOUS SURFACE ALLOWED
ON EACH LOT OUTSIDE OF THE
ROADWAY EASEMENT AREA.
6" SIDE SEWER PVC(PRIVATE)
i
ra► ------
1
I
I
1,000 SQUARE FEET Or ROOF
AREA INTO EACH INFILTRATION TRENCH
ON EAC H LOT
W- 377101
NE UICN_ WWD kiss
HORMM : W 1983/1191
DATUM
R CITY OE RENTON
Planning /Building /Public Works Dept.
.Y.
GRAPHIC SCALE
0 15 30 60
1 inch = 30 feet
I
y
I
I
/7"
RECOMMENDED FOR APPROVAL
Byl Datel
By, Datel
By, Datel
Byl Date,
NE 7th NORTH PHASE 2 01/26/2015
SCOTT DONOGH HOMES, INC. „�°°"
COMPOSITE UTILITY PLAN & BMP'S
3518 NE 7th Street
°i:13
UTILITY
D
Z
z�
s�
Z
m
D
D
Z
�T
T •
1
D
I x Z
Z
6666 v
1
T
�5