HomeMy WebLinkAboutW-380801W
Q
z Z
U
U
0
J
h�
zlf�l
D
Q
O
Ir
LL
w
J
Z
W
W
a:
w
W
J
ti
dMSMM
In
-- `� — 8 7 6 5 4 3 2
l �'
' TRACT A
1 (LANDSCAPE)
1 `
it
IF —
WWI now
ape WAW��K:
/TRACT E EL
• • • . (RE6. , #: �%' SPA 0 �►�� ■
or W
• • • �► I
1
0 • 1 ,
CL INTx7n-
1
•� � III . • • • , � - •
J. A—
. ' • , U
YE JIAY1 & CHI
AN • ••:•
• ��■
SEE GRADING SHEETS FOR
s
LOT DRAIN INFORMATION
ROAD C
loom-
PP
1100' 1%. 6,; ow
r --
A
• �• ��� �! .' ' ,
• � ♦ 1 1
` '• I I
WETLAND
TLAND C
G12 w«tdnp Days Worm You Dip
811
lJiW* lJndwWaind Loedion Cwt
ac.�rrl�ca�wN
11-0000' dIP dip
elp
dip
TRACT C \
(STORM WATER) \\ \\ 0��;
/, \PPOND —PERM POND\
dP
Aw__w"ft
wommommm
/I
d
20
19 _
I �
►ye .
23 1
fill
0
0
� 7
1
F
. 27 +00
o°
LO
CONSULTING ENGINEERS L L C
8th Avenue South
I ® I I I
T
Su
Suite 2
t
LO
Federal Way, WA 98003
�
FiDE1ML DIY (263) t36-113
www.esmcivil.com EVERETT (*25) 297 —MM
Civil Engineering
Lord Surveying Land Pku"ny
Public Works
( Project Monogement I Landscape Architecturo
ESM
JOB #258 -044 -013
d
20
19 _
I �
►ye .
23 1
fill
0
0
� 7
1
F
. 27 +00
o°
LO
z
T
O
LO
�
Z
VJ
_j
�
a
S W
�
W
*
F_
u
Q
WQ
C1_
Q
z
I
Ir
00
O
r
N
6 +00 7 +00
INTERCEPTOR DRAIN. SEE
DETAIL ON SHEET GR -04. :r -
TRACT B
A
STREAM .... �S• /
f' WETLAND D
m
0 FWT SUBMffrAL
1 EARLY CLF/1RM & GR#B K: MAM SUMMMAL
2 PLAN CHANN 01
3 PLAN CKAtI M
4 NKM SUBMffrAL
TE ,,
All NO. REVISION
0
N
in
SCALE:
1 •1111111low
l ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
n
SCALE: 1 of = 40'
409 20' 0 40o so
LEGEND
�u PROPOSED STORM DRAIN
s PROPOSED SANITARY SEWER
W_ PROPOSED WATER MAIN
STORM NOTES:
1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS
CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION
MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS
CONSTRUCTED AS PART OF THIS SUBDIVISION.
COMPLIANCE WITH THIS REQUIREMENT WILL BE
ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR
RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN
APPLICATION IS MADE FOR A SINGLE FAMILY
RESIDENTIAL BUILDING PERMIT FOR EACH LOT.
2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS
SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD
REPAIR BY EACH LOT OWNER.
3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING
INSTALLATION PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY
THE CCTV INSPECTION VIDEOS AND WRITTEN
REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT
WILL BECOME CITY OWNED /MAINTAINED AND ALL
PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES
AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR
AND COMPATIBLE WITH THE CITY'S VIEWING AND
RECORDING SYSTEMS. THE CITY WILL ONLY
ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG
VIDEO FILE FORMAT) AND IS COMPATIBLE WITH
GRANITE XP. THE VIDEO SHALL REFERENCE EACH
PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM
AND DOWNSTREAM CONNECTING STRUCTURES AS
SOWN (AND IDENTIFIED) ON THE APPROVED
PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV
INSPECTION SHALL BE BORNE BY THE PROJECT
DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES
FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY
BE REQURIED BY THE CITY TO VERIFY THE
CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL
COSTS INCURRED IN THE CCTV INSPECTION
PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS
LESS THAN 1 FOOT.
W- 380801
VERTICAL: NAVD 1988 W CITY OF
HORIZONTAL: 1983/1991 �►
RENTON
UM
Pic nning /Building /Public Works Dept.
CHECKED FOR COMPLIANCE TO CITY STANDARDS
�J /S
GREENLEAF
COMPOSITE UTILITY PLAN
UTILITY PERMIT #14004398
12/30/201
No:
UT -01
SI.IEET: DF:
12 39
.
z
T
O
�
Z
C
D -�
D Cr
3
t
« a�
0
N
in
SCALE:
1 •1111111low
l ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
n
SCALE: 1 of = 40'
409 20' 0 40o so
LEGEND
�u PROPOSED STORM DRAIN
s PROPOSED SANITARY SEWER
W_ PROPOSED WATER MAIN
STORM NOTES:
1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS
CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION
MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS
CONSTRUCTED AS PART OF THIS SUBDIVISION.
COMPLIANCE WITH THIS REQUIREMENT WILL BE
ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR
RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN
APPLICATION IS MADE FOR A SINGLE FAMILY
RESIDENTIAL BUILDING PERMIT FOR EACH LOT.
2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS
SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD
REPAIR BY EACH LOT OWNER.
3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING
INSTALLATION PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY
THE CCTV INSPECTION VIDEOS AND WRITTEN
REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT
WILL BECOME CITY OWNED /MAINTAINED AND ALL
PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES
AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR
AND COMPATIBLE WITH THE CITY'S VIEWING AND
RECORDING SYSTEMS. THE CITY WILL ONLY
ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG
VIDEO FILE FORMAT) AND IS COMPATIBLE WITH
GRANITE XP. THE VIDEO SHALL REFERENCE EACH
PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM
AND DOWNSTREAM CONNECTING STRUCTURES AS
SOWN (AND IDENTIFIED) ON THE APPROVED
PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV
INSPECTION SHALL BE BORNE BY THE PROJECT
DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES
FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY
BE REQURIED BY THE CITY TO VERIFY THE
CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL
COSTS INCURRED IN THE CCTV INSPECTION
PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS
LESS THAN 1 FOOT.
W- 380801
VERTICAL: NAVD 1988 W CITY OF
HORIZONTAL: 1983/1991 �►
RENTON
UM
Pic nning /Building /Public Works Dept.
CHECKED FOR COMPLIANCE TO CITY STANDARDS
�J /S
GREENLEAF
COMPOSITE UTILITY PLAN
UTILITY PERMIT #14004398
12/30/201
No:
UT -01
SI.IEET: DF:
12 39
.
z
T
O
�
Z
C
D -�
D Cr
3
t
W
m
D
•
z
m
D
O
D
Z
Z
C
3
m
m
x
rr-
_ Z
W
0
T
O
�
D
D -�
D Cr
t
'�