Loading...
HomeMy WebLinkAboutzW-3808SetW Q z Z U U 0 J h� zlf�l D Q O Ir LL w J Z W W a: w W J ti dMSMM In -- `� — 8 7 6 5 4 3 2 l �' ' TRACT A 1 (LANDSCAPE) 1 ` it IF — WWI now ape WAW��K: /TRACT E EL • • • . (RE6. , #: �%' SPA 0 �►�� ■ or W • • • �► I 1 0 • 1 , CL INTx7n- 1 •� � III . • • • , � - • J. A— . ' • , U YE JIAY1 & CHI AN • ••:• • ��■ SEE GRADING SHEETS FOR s LOT DRAIN INFORMATION ROAD C loom- PP 1100' 1%. 6,; ow r -- A • �• ��� �! .' ' , • � ♦ 1 1 ` '• I I WETLAND TLAND C G12 w«tdnp Days Worm You Dip 811 lJiW* lJndwWaind Loedion Cwt ac.�rrl�ca�wN 11-0000' dIP dip elp dip TRACT C \ (STORM WATER) \\ \\ 0��; /, \PPOND —PERM POND\ dP Aw__w"ft wommommm /I d 20 19 _ I � ►ye . 23 1 fill 0 0 � 7 1 F . 27 +00 o° LO CONSULTING ENGINEERS L L C 8th Avenue South I ® I I I T Su Suite 2 t LO Federal Way, WA 98003 � FiDE1ML DIY (263) t36-113 www.esmcivil.com EVERETT (*25) 297 —MM Civil Engineering Lord Surveying Land Pku"ny Public Works ( Project Monogement I Landscape Architecturo ESM JOB #258 -044 -013 d 20 19 _ I � ►ye . 23 1 fill 0 0 � 7 1 F . 27 +00 o° LO z T O LO � Z VJ _j � a S W � W * F_ u Q WQ C1_ Q z I Ir 00 O r N 6 +00 7 +00 INTERCEPTOR DRAIN. SEE DETAIL ON SHEET GR -04. :r - TRACT B A STREAM .... �S• / f' WETLAND D m 0 FWT SUBMffrAL 1 EARLY CLF/1RM & GR#B K: MAM SUMMMAL 2 PLAN CHANN 01 3 PLAN CKAtI M 4 NKM SUBMffrAL TE ,, All NO. REVISION 0 N in SCALE: 1 •1111111low l ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY n SCALE: 1 of = 40' 409 20' 0 40o so LEGEND �u PROPOSED STORM DRAIN s PROPOSED SANITARY SEWER W_ PROPOSED WATER MAIN STORM NOTES: 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS CONSTRUCTED AS PART OF THIS SUBDIVISION. COMPLIANCE WITH THIS REQUIREMENT WILL BE ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FAMILY RESIDENTIAL BUILDING PERMIT FOR EACH LOT. 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. 3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED /MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. W- 380801 VERTICAL: NAVD 1988 W CITY OF HORIZONTAL: 1983/1991 �► RENTON UM Pic nning /Building /Public Works Dept. CHECKED FOR COMPLIANCE TO CITY STANDARDS �J /S GREENLEAF COMPOSITE UTILITY PLAN UTILITY PERMIT #14004398 12/30/201 No: UT -01 SI.IEET: DF: 12 39 . z T O � Z C D -� D Cr 3 t « a� 0 N in SCALE: 1 •1111111low l ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY n SCALE: 1 of = 40' 409 20' 0 40o so LEGEND �u PROPOSED STORM DRAIN s PROPOSED SANITARY SEWER W_ PROPOSED WATER MAIN STORM NOTES: 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS CONSTRUCTED AS PART OF THIS SUBDIVISION. COMPLIANCE WITH THIS REQUIREMENT WILL BE ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FAMILY RESIDENTIAL BUILDING PERMIT FOR EACH LOT. 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. 3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED /MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. W- 380801 VERTICAL: NAVD 1988 W CITY OF HORIZONTAL: 1983/1991 �► RENTON UM Pic nning /Building /Public Works Dept. CHECKED FOR COMPLIANCE TO CITY STANDARDS �J /S GREENLEAF COMPOSITE UTILITY PLAN UTILITY PERMIT #14004398 12/30/201 No: UT -01 SI.IEET: DF: 12 39 . z T O � Z C D -� D Cr 3 t W m D • z m D O D Z Z C 3 m m x rr- _ Z W 0 T O � D D -� D Cr t '�