HomeMy WebLinkAboutW-380901Q_
0
0
N
W
H
Q
O
Q_
CA
v
0
J
rn
c
Y
m
Q_
U)
U)
2
CL
X
w
L
Z
Q
0
0
0
J
C
Y
m
a
C
0
c
a�
a�
CL
X
w
4)
t
C
U
CL
W
W
J
� N
cn Zo ,o o Zo ao
Q, SCALE IN FEET
Q. POROUS PAVEMENT NOTES:
TO PREVENT COMPACTION WHEN INSTALLING THE
AGGREGATE BASE, THE FOLLOWING STEPS (BACK DUMPING)
SHOULD BE FOLLOWED:
• THE AGGREGATE BASE IS DUMPED ONTO THE SUBGRADE
FROM THE EDGE OF THE INSTALLATION AND AGGREGATE IS
O THEN PUSHED OUT ONTO THE SUBGRADE;
• TRUCKS THEN DUMP SUBSEQUENT LOADS FROM ON TOP
rR OF THE AGGREGATE BASE AS THE INSTALLATION
V PROGRESSES. AVOID SUBGRADE PREPARATION DURING
z WET PERIODS (SOIL COMPACTION INCREASES
Y SIGNIFICANTLY IF SOIL IS WET).
• IF MACHINERY MUST ACCESS THE FINAL GRADE, LIMIT THE
Q ACCESS TO A SPECIFIC TRAVEL WAY THAT CAN BE TILLED
a. BEFORE APPLICATION OF THE BASE AGGREGATE OR PLACE
z HEAVY STEEL PLATES ON SUBGRADE AND LIMIT TRAFFIC TO
O THE PROTECTIVE COVER.
• EXCAVATE THE SUBGRADE LEVEL TO ALLOW EVEN
z DISTRIBUTION OF WATER THROUGH THE AGGREGATE BASE
w AND MAXIMIZE INFILTRATION ACROSS THE ENTIRE PARKING
AREA
• IMMEDIATELY BEFORE PLACING BASE AGGREGATE AND
1
U) PAVEMENT, REMOVE ANY ACCUMULATION OF FINE
U) MATERIAL (IF PRESENT) WITH LIGHT EQUIPMENT AND
w SCARIFY SOIL TO A MINIMUM DEPTH OF 6 INCHES TO
PREVENT SEALING OF THE SUBGRADE SURFACE.
• WHILE THE SUBGRADE IS EXCAVATED LEVEL, THE
X PAVEMENT SURFACE SHOULD MAINTAIN A MINIMAL SLOPE
W OF 1 TO 2 PERCENT.
w PAVEMENT OR WEARING COURSE INSTALLATION
J • THE POROUS ASPHALT PAVEMENT INSTALLATIONS USE THE
SAME EQUIPMENT AND SIMILAR PROCEDURES AS
CONVENTIONAL ASPHALT WITH THREE NOTABLE
DIFFERENCES:
• MIXING TEMPERATURE SHOULD BE 260 -280 F AND 240 -260
(f� F FOR LAY DOWN. AIR TEMPERATURE SHOULD BE NO
LOWER THAN 45 F AND RISING.
• THE STIFFER PERFORMANCE GRADE FOR THE BITUMINOUS
ASPHALT CEMENT ADHERES MORE TO DELIVERY TRUCKS
AND INSTALLATION MACHINERY; ACCORDINGLY,
ADDITIONAL TIME IS NECESSARY TO CLEAN EQUIPMENT.
• POROUS ASPHALT AGGREGATE BASE AND CHOKER COURSES
ARE RELATIVELY UNIFORM GRADATIONS AND LOW IN FINE
MATERIAL. AS A RESULT, EQUIPMENT OPERATING ON THE
AGGREGATE BASE WILL CAUSE MORE RUTTING THAN ON
MORE DENSELY GRADED BASE MATERIAL FOR
CONVENTIONAL PAVEMENT AND WILL REQUIRE MORE
HAND LABOR TO SMOOTH RUTS AND PREVENT AREAS
WHERE THE PAVEMENT IS EITHER TOO THIN OR TOO THICK.
MINIMUM INFILTRATION RATE FOR THE POROUS HOT MIX
ASPHALT
• THE MINIMUM INFILTRATION RATE FOR NEWLY PLACED
POROUS ASPHALT SHOULD BE 200 INCHES PER HOUR. USE
ASTM C1701 /C1701M -09 TO TEST INFILTRATION RATES AT
LOCATIONS REPRESENTATIVE OF THE PAVEMENT FINISHED
PRODUCT AT A MAXIMUM RATE OF 5,000 SQUARE FEET PER
TEST.
GEOTEXTILE AND GEOGRIDS
• USE GEOTEXTILE RECOMMENDED BY THE
MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER
FOR THE GIVEN SUBGRADE SOIL TYPE AND BASE
AGGREGATE.
.. T',
L1
PAVEMENT DESIGNED FOR LIGHT LOADS C09
O PAVEMENT DESIGNED FOR HEAVY LOADS LZ
�O9
EXISTING CONTOUR (TYP)
22 PROPOSED CONTOUR (TYP)
_ EXISTING STORM DRAIN PIPE
EXISTING SANITARY SEWER PIPE
GRADING QUANTITIES:
TOTAL SITE CUT: 526 CY*
TOTAL SITE FILL: 377 CY
TOTAL NET CUT. 190 CY
*AREAS CALCULATED TO SUB-GRADE
(INCLUDES 12 CUT DEPTH IN LIGHT USE"
AND 20" CUT DEPTH IN "HEAVY USE"
AREAS PER PAVING CROSS SECTION
DETAILS E1 & E2 ON SHEET C07.)
SANITARY SEWER DATA:
SSMH 1603
RUN 21.20
IE 6.6 N
IE 7.3 S
24 ' CONC E & W
C.O.C. EL 6.6
SSMH 1667
RIM 21.11
C.O.C. EL 6.8
IE8.2N8 "PVC
IE 12.7 S
24 " CONIC E &W
EX STORM DATA.
SDMH 1604
RIM 20.55
IE 14.95 W 24" CPP
IE 14.95 E 24" CPP
IE 17.3 S 12" CPP
SDMH 1660
RIM 20.45
IE15.3N8 "PVC
IE15.3E24 "CPP
IE 17.45 S 12" CPP
IE 15.3W24 "CPP
ABBREVIATIONS:
.00
/ rn o I
SDMH 1668 SDCB 1670 - - - _- 000° 6
0
rip
3pi l
RIM 21.22 RIM 20.05 ' - N
o�'
.p3, /
IE 15.9 N 12" CPP IE 18.05 E 12" CPP 2
IE +/- 17.7 S 12" CPP IE18.05SW12 "CPP Q 4pp�
UNABLE TO SEE IT 'pp�„ Q X22/ l
•• •� •� 8 p, l
IE 5.85 E 24 CPP SDCB 1685 p
IE 15.4 W 24 CPP RIM 19.36 j
IE 17.5 NW 12" CPP mm / Q son
SDMH 1669 IE 17.4 SE 12" HOLE
0
RIM 21.05
IE 17.45 NE 12" CPP / j
IE 16.2 S 12" CPP /
IE16.45NW12 "CPP - - - -- C-4
Q
- - - - -- - 4
0 /
4 $0� i
4 0 Q
in rn. /
CB = CATCH BASIN FL = FLOWLINE 4
CW = CONCRETE WALK IE = INVERT ELEVATION 1 g5o�o
CONC = CONCRETE LF = LINEAL FEET
0 .
DEMO = DEMOLITION SD =STORM DRAIN = 0 �
o 0
EG = EXISTING GRADE SDCO = STORM DRAIN CLEANOUT
TESC = TEMPORARY EROSION & SSSCO = SANITARY SIDE SEWER
SEDIMENTATION CONTROL CLEANOUT i
EX = EXISTING SSS = SANITARY SIDE SEWER 0.20° ° ,, ....... . . . .
FF = FINISH FLOOR TOC = TOP OF CURB
FG = FINISH GRADE TOP = TOP OF PAVEMENT _
EG 18.93
TOP 18.94
TOP 21.03 EG 21.77
TOC 19.44 / 6 TOC 21.53 _
l \� EG 19.26 EG 20.16 i EG 20.93
o TOP 18.83
N
TOC 19.33
TOP 19.05 . . . . . . . . .
_.�.. TOC 19.55 . . . . . . . . . . . . . . . . . .
. . . . . . . . . . .
TOP 19.12 . . . . . . . . . . .
.........
TOC 19.62
TOP 19.06
Y� TOC 19.56
:�� � � .. �• ;�
..... TOP 19.01
TOC 19.51
TOP 19.01
_N `� TOC 19.51 . o .
...
In LO In In In M M M M M M CO CO CO CO r M M M M
I N N N N N Ch tf) CV N I� f� : f� : l� M O
i
r- MM NNNN co M �- MMr- U a M M ~ ~ NN
CO M
NN
I NNNNN 00 000000 N N N N N% N m m 0 0. N.N N N j 0000 0000
I000000 0000 waaw 000;00 00 m m �• Co 00 0000
wwaaw 0400 wa a w w a- a_w . w a_ alw� .w w. 0000
No 00000 00 0'`O 0000 . 0,000
F- E-- E- ~ ~ �- F- I- F- 4.4 TOC 20.45
19 ` o TOP 19.95
�� .\............ \ v o e e v e ° o A
a ...................= e v \ e v v
N
0
e .
A
v
v
. -•.
Y ..
:....: 4L. o o o �.. �... •,.... �� � . � _ ........................... .......... .. ...�::. � � FL 21.07
R Q
' � .• \,., N _ � _ ......._.._.._. ... ... �\ -
CW 22.08
. ............................. .
............ .
\..
CO
TOC 22.08
...............
:-� 58
U-) -) -
•� � �.� mot' - _.
_a.......... ti C0 TOC 21.55
.......... ....
,� �: :; M'O M Ln 00 N O In ti
N� NN p FL 21.05
KEY NOTES
CO
OrM ONM
0E-
M O) -
N �
DETAIL/
KEY
DESCRIPTION
1-- 1` 1� n1O N - �
� � � �r C
00
CO �O
ON�_ MO
_ M ONM
SHEET
1
ADJUST RIM TO FINISH GRADE
-
N
CONTRACTOR TO POTHOLE WATER
ON
���
SERVICE PRIOR TO EXCAVATING ABOVE
NCO N �f`
~ 0-) Cp
ti00�
CO O M NN CO M CN
MLAS` O
2
AND PROTECT METER AND SERVICE
-
•
DURING THE DURATION OF
�
CONSTRUCTION.
�
3
REMOVE EX CB
-
4
CAP EX 8" PIPE
-
5
CONTRACTOR SHALL CLEAN OUT EX CB
-
. .00O
INSTALL GEOMEMBRANE LINER BETWEEN
NN N NNN,NNNNNN:NNN
6
POROUS ASPHALT AND EXISTING ASPHALT
-
���
NNN
SECTION AND BASE COURSE.
7
ADA RAMPS
2/C05
_. r .. ....:
N O N O N O V
CO
OrM ONM
0E-
M O) -
N �
to e-
M�
N
1` M in N 00 O 'O � ON �MO� �'IT
�M� NMIn Op� nnCO
Ln CO
1-- 1` 1� n1O N - �
� � � �r C
00
CO �O
ON�_ MO
_ M ONM
OON �O N
-N
MO _
OO N
SON V ON
OW OO)
N
CO
�N
N
� N
O....
ON
���
OOp
CON
NCO N �f`
~ 0-) Cp
ti00�
CO O M NN CO M CN
MLAS` O
. � �
r
'.
•
c 7
�
�
., :..
......
.. .......................,.
. .00O
N N N NNN NNN
O
NN N NNN,NNNNNN:NNN
rr � U
NNN rNN °NN N V
���
NNN
�r -
NNN" NNN NNNNN NNN
NNN NNN
0�Q
NNN
NNN NNN
NNN
0
NNN
NNN
NN
O
NN
.°
N
O ON r
NNm N N 00 N NN N 04 04 N
(D` (D
0 U U 00 U U
�
V
........
ODU
N
U��V
LLww
� � V
NNN NN NNN NNN
'.
� U �� �� U ��
NNN NNN
� U ��
U �� U ��
U ��
U �� U ��
U ��
�,
��
U �
U ��
-0
_...._..
a a
LLJ a
a_a-O U ' J O -J 0, L) -J � J U - -
� � � L)
..........M
UV.ODU
F-
ODU
_
ODU4UU UU4
UU UU
OD
0UU UUDUDU
DUDUDUDUU
- -
'
- ODOL)
U
'
- L)
UV
OU O U
O U0UU.DUU0UU
�
-
-r
- -
-
•� -r
l- .- � -
�
._ _
..
f-
'
SW
16TH STREET
VJ..:
..
CALL 2 DAYS ..•,
RV 5`5
BEFORE YOU DIG RR
N 12
\\\
1- 800 - 424 -5555
(UNDERGROUND UTILITY
LOCATIONS ARE APPROX.)
BASE MAP/TOPOGRAPHY PROVIDED BY
OTHERS. DCG CANNOT BE HELD LIABLE DAVIDO FOR ACCURACY. CONTRACTOR SHALL CONSULTINGGROUP, INC.
FIELD VERIFY GRADES, UTILITIES, AND
ALL OTHER EXISTING FEATURES AND Civil • Structural • Land Use
CONDITIONS. IF CONDITIONS ARE NOT
AS SHOWN AND /OR PLANS CANNOT BE 15029 Bothell Way NE, Suite 600
CONSTRUCTED AS SHOWN.. CONTACT Lake Forest Park, WA 98155
DCG PRIOR TO CONSTRUCTION- 106 523 0024
P.O. Box 1 132
Freeland, WA 98249
360.331.4131
\\ \\ \ \ .
V""", ; Y
NO.
GRADING PLAN
SCALE: 1" = 20'
SURVEYED: SCALE:
VERTrAU: NAVO 1988
DESKMD: AS NOTED HMZWAL- N1D 1983/1N1 �i CITY OF
TIM GABELEIN
DMWN: RENTON
NATHAN DAVIS
ONE '"C" D AT U M
CHECKED: AT FIJLL SCALE Planning/Building/Public Works Dept.
ERIK DAVIDO IF NOT ONE INCH
REVISION BY DATE A P P R : SCALE #4COMWLY
ERIK DAVIDO
W- 380901
IN COMPLIANCE WITH CITY OF RENTON
STANDARDS
BY: Date: i _z•49Vj
BY: Date:
BY: Date:
BY: Date:
DATE:
SHUTTLE EXPRESS - RENTON PARKING LOT 2/10/2015
800 SW 16TH ST nebm 1
RENTON, WA
ol,c No:
C05
GRADING, DRAINAGE &UTILITY PLAN � 5 � 9
� - � ✓ "'� �� X10 / Q - N N NI N1 Q Q
D
T
1
Z
T '•
-z
C
D
O
D
Z
Z
C
3
m
m
:r.
G)
i Z
x
z
2 'Z
J
m
m
D
D
T
1
Z
T '•
-z
C
D
O
D
Z
Z
C
3
m
m
:r.
x
�
X
1 _
J
Z
T
� o
m
' T