Loading...
HomeMy WebLinkAboutzW-3809 SetQ_ 0 0 N W H Q O Q_ CA v 0 J rn c Y m Q_ U) U) 2 CL X w L Z Q 0 0 0 J C Y m a C 0 c a� a� CL X w 4) t C U CL W W J � N cn Zo ,o o Zo ao Q, SCALE IN FEET Q. POROUS PAVEMENT NOTES: TO PREVENT COMPACTION WHEN INSTALLING THE AGGREGATE BASE, THE FOLLOWING STEPS (BACK DUMPING) SHOULD BE FOLLOWED: • THE AGGREGATE BASE IS DUMPED ONTO THE SUBGRADE FROM THE EDGE OF THE INSTALLATION AND AGGREGATE IS O THEN PUSHED OUT ONTO THE SUBGRADE; • TRUCKS THEN DUMP SUBSEQUENT LOADS FROM ON TOP rR OF THE AGGREGATE BASE AS THE INSTALLATION V PROGRESSES. AVOID SUBGRADE PREPARATION DURING z WET PERIODS (SOIL COMPACTION INCREASES Y SIGNIFICANTLY IF SOIL IS WET). • IF MACHINERY MUST ACCESS THE FINAL GRADE, LIMIT THE Q ACCESS TO A SPECIFIC TRAVEL WAY THAT CAN BE TILLED a. BEFORE APPLICATION OF THE BASE AGGREGATE OR PLACE z HEAVY STEEL PLATES ON SUBGRADE AND LIMIT TRAFFIC TO O THE PROTECTIVE COVER. • EXCAVATE THE SUBGRADE LEVEL TO ALLOW EVEN z DISTRIBUTION OF WATER THROUGH THE AGGREGATE BASE w AND MAXIMIZE INFILTRATION ACROSS THE ENTIRE PARKING AREA • IMMEDIATELY BEFORE PLACING BASE AGGREGATE AND 1 U) PAVEMENT, REMOVE ANY ACCUMULATION OF FINE U) MATERIAL (IF PRESENT) WITH LIGHT EQUIPMENT AND w SCARIFY SOIL TO A MINIMUM DEPTH OF 6 INCHES TO PREVENT SEALING OF THE SUBGRADE SURFACE. • WHILE THE SUBGRADE IS EXCAVATED LEVEL, THE X PAVEMENT SURFACE SHOULD MAINTAIN A MINIMAL SLOPE W OF 1 TO 2 PERCENT. w PAVEMENT OR WEARING COURSE INSTALLATION J • THE POROUS ASPHALT PAVEMENT INSTALLATIONS USE THE SAME EQUIPMENT AND SIMILAR PROCEDURES AS CONVENTIONAL ASPHALT WITH THREE NOTABLE DIFFERENCES: • MIXING TEMPERATURE SHOULD BE 260 -280 F AND 240 -260 (f� F FOR LAY DOWN. AIR TEMPERATURE SHOULD BE NO LOWER THAN 45 F AND RISING. • THE STIFFER PERFORMANCE GRADE FOR THE BITUMINOUS ASPHALT CEMENT ADHERES MORE TO DELIVERY TRUCKS AND INSTALLATION MACHINERY; ACCORDINGLY, ADDITIONAL TIME IS NECESSARY TO CLEAN EQUIPMENT. • POROUS ASPHALT AGGREGATE BASE AND CHOKER COURSES ARE RELATIVELY UNIFORM GRADATIONS AND LOW IN FINE MATERIAL. AS A RESULT, EQUIPMENT OPERATING ON THE AGGREGATE BASE WILL CAUSE MORE RUTTING THAN ON MORE DENSELY GRADED BASE MATERIAL FOR CONVENTIONAL PAVEMENT AND WILL REQUIRE MORE HAND LABOR TO SMOOTH RUTS AND PREVENT AREAS WHERE THE PAVEMENT IS EITHER TOO THIN OR TOO THICK. MINIMUM INFILTRATION RATE FOR THE POROUS HOT MIX ASPHALT • THE MINIMUM INFILTRATION RATE FOR NEWLY PLACED POROUS ASPHALT SHOULD BE 200 INCHES PER HOUR. USE ASTM C1701 /C1701M -09 TO TEST INFILTRATION RATES AT LOCATIONS REPRESENTATIVE OF THE PAVEMENT FINISHED PRODUCT AT A MAXIMUM RATE OF 5,000 SQUARE FEET PER TEST. GEOTEXTILE AND GEOGRIDS • USE GEOTEXTILE RECOMMENDED BY THE MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER FOR THE GIVEN SUBGRADE SOIL TYPE AND BASE AGGREGATE. .. T', L1 PAVEMENT DESIGNED FOR LIGHT LOADS C09 O PAVEMENT DESIGNED FOR HEAVY LOADS LZ �O9 EXISTING CONTOUR (TYP) 22 PROPOSED CONTOUR (TYP) _ EXISTING STORM DRAIN PIPE EXISTING SANITARY SEWER PIPE GRADING QUANTITIES: TOTAL SITE CUT: 526 CY* TOTAL SITE FILL: 377 CY TOTAL NET CUT. 190 CY *AREAS CALCULATED TO SUB-GRADE (INCLUDES 12 CUT DEPTH IN LIGHT USE" AND 20" CUT DEPTH IN "HEAVY USE" AREAS PER PAVING CROSS SECTION DETAILS E1 & E2 ON SHEET C07.) SANITARY SEWER DATA: SSMH 1603 RUN 21.20 IE 6.6 N IE 7.3 S 24 ' CONC E & W C.O.C. EL 6.6 SSMH 1667 RIM 21.11 C.O.C. EL 6.8 IE8.2N8 "PVC IE 12.7 S 24 " CONIC E &W EX STORM DATA. SDMH 1604 RIM 20.55 IE 14.95 W 24" CPP IE 14.95 E 24" CPP IE 17.3 S 12" CPP SDMH 1660 RIM 20.45 IE15.3N8 "PVC IE15.3E24 "CPP IE 17.45 S 12" CPP IE 15.3W24 "CPP ABBREVIATIONS: .00 / rn o I SDMH 1668 SDCB 1670 - - - _- 000° 6 0 rip 3pi l RIM 21.22 RIM 20.05 ' - N o�' .p3, / IE 15.9 N 12" CPP IE 18.05 E 12" CPP 2 IE +/- 17.7 S 12" CPP IE18.05SW12 "CPP Q 4pp� UNABLE TO SEE IT 'pp�„ Q X22/ l •• •� •� 8 p, l IE 5.85 E 24 CPP SDCB 1685 p IE 15.4 W 24 CPP RIM 19.36 j IE 17.5 NW 12" CPP mm / Q son SDMH 1669 IE 17.4 SE 12" HOLE 0 RIM 21.05 IE 17.45 NE 12" CPP / j IE 16.2 S 12" CPP / IE16.45NW12 "CPP - - - -- C-4 Q - - - - -- - 4 0 / 4 $0� i 4 0 Q in rn. / CB = CATCH BASIN FL = FLOWLINE 4 CW = CONCRETE WALK IE = INVERT ELEVATION 1 g5o�o CONC = CONCRETE LF = LINEAL FEET 0 . DEMO = DEMOLITION SD =STORM DRAIN = 0 � o 0 EG = EXISTING GRADE SDCO = STORM DRAIN CLEANOUT TESC = TEMPORARY EROSION & SSSCO = SANITARY SIDE SEWER SEDIMENTATION CONTROL CLEANOUT i EX = EXISTING SSS = SANITARY SIDE SEWER 0.20° ° ,, ....... . . . . FF = FINISH FLOOR TOC = TOP OF CURB FG = FINISH GRADE TOP = TOP OF PAVEMENT _ EG 18.93 TOP 18.94 TOP 21.03 EG 21.77 TOC 19.44 / 6 TOC 21.53 _ l \� EG 19.26 EG 20.16 i EG 20.93 o TOP 18.83 N TOC 19.33 TOP 19.05 . . . . . . . . . _.�.. TOC 19.55 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TOP 19.12 . . . . . . . . . . . ......... TOC 19.62 TOP 19.06 Y� TOC 19.56 :�� � � .. �• ;� ..... TOP 19.01 TOC 19.51 TOP 19.01 _N `� TOC 19.51 . o . ... In LO In In In M M M M M M CO CO CO CO r M M M M I N N N N N Ch tf) CV N I� f� : f� : l� M O i r- MM NNNN co M �- MMr- U a M M ~ ~ NN CO M NN I NNNNN 00 000000 N N N N N% N m m 0 0. N.N N N j 0000 0000 I000000 0000 waaw 000;00 00 m m �• Co 00 0000 wwaaw 0400 wa a w w a- a_w . w a_ alw� .w w. 0000 No 00000 00 0'`O 0000 . 0,000 F- E-- E- ~ ~ �- F- I- F- 4.4 TOC 20.45 19 ` o TOP 19.95 �� .\............ \ v o e e v e ° o A a ...................= e v \ e v v N 0 e . A v v . -•. Y .. :....: 4L. o o o �.. �... •,.... �� � . � _ ........................... .......... .. ...�::. � � FL 21.07 R Q ' � .• \,., N _ � _ ......._.._.._. ... ... �\ - CW 22.08 . ............................. . ............ . \.. CO TOC 22.08 ............... :-� 58 U-) -) - •� � �.� mot' - _. _a.......... ti C0 TOC 21.55 .......... .... ,� �: :; M'O M Ln 00 N O In ti N� NN p FL 21.05 KEY NOTES CO OrM ONM 0E- M O) - N � DETAIL/ KEY DESCRIPTION 1-- 1` 1� n1O N - � � � � �r C 00 CO �O ON�_ MO _ M ONM SHEET 1 ADJUST RIM TO FINISH GRADE - N CONTRACTOR TO POTHOLE WATER ON ��� SERVICE PRIOR TO EXCAVATING ABOVE NCO N �f` ~ 0-) Cp ti00� CO O M NN CO M CN MLAS` O 2 AND PROTECT METER AND SERVICE - • DURING THE DURATION OF � CONSTRUCTION. � 3 REMOVE EX CB - 4 CAP EX 8" PIPE - 5 CONTRACTOR SHALL CLEAN OUT EX CB - . .00O INSTALL GEOMEMBRANE LINER BETWEEN NN N NNN,NNNNNN:NNN 6 POROUS ASPHALT AND EXISTING ASPHALT - ��� NNN SECTION AND BASE COURSE. 7 ADA RAMPS 2/C05 _. r .. ....: N O N O N O V CO OrM ONM 0E- M O) - N � to e- M� N 1` M in N 00 O 'O � ON �MO� �'IT �M� NMIn Op� nnCO Ln CO 1-- 1` 1� n1O N - � � � � �r C 00 CO �O ON�_ MO _ M ONM OON �O N -N MO _ OO N SON V ON OW OO) N CO �N N � N O.... ON ��� OOp CON NCO N �f` ~ 0-) Cp ti00� CO O M NN CO M CN MLAS` O . � � r '. • c 7 � � ., :.. ...... .. .......................,. . .00O N N N NNN NNN O NN N NNN,NNNNNN:NNN rr � U NNN rNN °NN N V ��� NNN �r - NNN" NNN NNNNN NNN NNN NNN 0�Q NNN NNN NNN NNN 0 NNN NNN NN O NN .° N O ON r NNm N N 00 N NN N 04 04 N (D` (D 0 U U 00 U U � V ........ ODU N U��V LLww � � V NNN NN NNN NNN '. � U �� �� U �� NNN NNN � U �� U �� U �� U �� U �� U �� U �� �, �� U � U �� -0 _...._.. a a LLJ a a_a-O U ' J O -J 0, L) -J � J U - - � � � L) ..........M UV.ODU F- ODU _ ODU4UU UU4 UU UU OD 0UU UUDUDU DUDUDUDUU - - ' - ODOL) U ' - L) UV OU O U O U0UU.DUU0UU � - -r - - - •� -r l- .- � - � ._ _ .. f- ' SW 16TH STREET VJ..: .. CALL 2 DAYS ..•, RV 5`5 BEFORE YOU DIG RR N 12 \\\ 1- 800 - 424 -5555 (UNDERGROUND UTILITY LOCATIONS ARE APPROX.) BASE MAP/TOPOGRAPHY PROVIDED BY OTHERS. DCG CANNOT BE HELD LIABLE DAVIDO FOR ACCURACY. CONTRACTOR SHALL CONSULTINGGROUP, INC. FIELD VERIFY GRADES, UTILITIES, AND ALL OTHER EXISTING FEATURES AND Civil • Structural • Land Use CONDITIONS. IF CONDITIONS ARE NOT AS SHOWN AND /OR PLANS CANNOT BE 15029 Bothell Way NE, Suite 600 CONSTRUCTED AS SHOWN.. CONTACT Lake Forest Park, WA 98155 DCG PRIOR TO CONSTRUCTION- 106 523 0024 P.O. Box 1 132 Freeland, WA 98249 360.331.4131 \\ \\ \ \ . V""", ; Y NO. GRADING PLAN SCALE: 1" = 20' SURVEYED: SCALE: VERTrAU: NAVO 1988 DESKMD: AS NOTED HMZWAL- N1D 1983/1N1 �i CITY OF TIM GABELEIN DMWN: RENTON NATHAN DAVIS ONE '"C" D AT U M CHECKED: AT FIJLL SCALE Planning/Building/Public Works Dept. ERIK DAVIDO IF NOT ONE INCH REVISION BY DATE A P P R : SCALE #4COMWLY ERIK DAVIDO W- 380901 IN COMPLIANCE WITH CITY OF RENTON STANDARDS BY: Date: i _z•49Vj BY: Date: BY: Date: BY: Date: DATE: SHUTTLE EXPRESS - RENTON PARKING LOT 2/10/2015 800 SW 16TH ST nebm 1 RENTON, WA ol,c No: C05 GRADING, DRAINAGE &UTILITY PLAN � 5 � 9 � - � ✓ "'� �� X10 / Q - N N NI N1 Q Q D T 1 Z T '• -z C D O D Z Z C 3 m m :r. G) i Z x z 2 'Z J m m D D T 1 Z T '• -z C D O D Z Z C 3 m m :r. x � X 1 _ J Z T � o m ' T