HomeMy WebLinkAboutS-070308A CITY OF RENTON JEMPORARY EROSION [SEDIMENTATION CONTROL NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN REVIEW ENGINEER AND THE OWNERS REPRESENTATIVE. . 2. ALL LIMITS OF CLEARING (PROJECT LIMITS) AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. THE FLAGGING SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE DURATION OF THE PROJECT. 3. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO INSURE THEIR CONTINUED FUNCTIONING. 4. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT (EXCEEDING 1' IN 24 HOURS). 5. ALL REQUIRED TESC FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND /OR OTHER CONSTRUCTION TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR. CONSTRUCTION IS COMPLETED AND POTENTIAL FOR ON —SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO TESC SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 6. DURING THE TIME PERIOD OF NOVEMBER 1 THROUGH MARCH 31, ALL PROJECT DISTURBED SOIL AREAS GREATER THAN 5,000 SQUARE FEET THAT ARE TO BE LEFT UNWORKED FOR MORE THAN TWELVE (12) HOURS SHALL BE TEMPORARILY COVERED WITH 6 MIL POLYVINYL SHEETING, MULCH, OR SODDING. SHEETING SHALL BE "TOED —IN' AT THE TOP OF SLOPES 2 FEET IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH THE SHEETS. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE 11ME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED, BUT MUST BE AUGMENTED WITH MULCHING, NETTING, OR OTHER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE THE SPECIFIED TIME PERIOD. 8. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE, 24' X 100' X 12° OF 4 TO 8 INCH QUARRY SPALLS SHALL BE LOCATED AT ALL POINTS OF VEHICULAR INGRESS AND EGRESS TO THE CONSTRUCTION SIZE 9. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND FINAL APPROVALS ARE OBTAINED. 10. AT NO TIME SHALL MORE THAN ONE F0OT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN AN EXISTING CATCH BASIN. ALL EXISTING CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM OR SPRINGBROOK CREEK. 11. TESC FACIUTES SHOWN ON THE PLANS ARE MINIMUM FACILITIES. THE CONTRACTORS METHOD OF OPERATION MAY REQUIRE ADDITIONAL FACILITIES. THE CONTRACTOR WALL PROVIDE ADDITIONAL FACILITIES, IF NEEDED, IN ACCORDANCE NTH CHAPTER 5 OF THE KING COUNTY SURFACE WATER DESIGN MANUAL. 12. THE CONTRACTOR SHALL UTILIZE EXISTING ROADS FOR CONSTRUCTION TRAFFIC WHEREVER POSSIBLE. ANY POTHOLES OR MUDHOLES SHALL BE FILLED WITH COARSE ROCK TO PREVENT EROSION /SEDIMENTATION. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE A COARSE ROCK OVERLAY FOR ANY ROADING REQUIRED OFF OF EXISTING ESTABLISHED TRAFFIC AREAS. 13. THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE TESC FACILITIES IS THE RESPOSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND FINAL APPROVALS ARE OBTAINED. THIS BAR IS 1 ° ACTUAL SIZE. w 1/412 1' ® Q IF NOT 1', SCALE ACCORDINGLY. 128207 yD e, B overu —M r /t ?� DESIGNED: R.B. v ® FETRO Municipality of Metropolitan Seattle Ir DAT� NOVEMBER 1992 AWN' ` SOUTH INTERCEPTOR — PARALLEL FILE No- CQRPOFiATiON' D.L.O. J•D•B• NONE PHASE 1 NOTES ANf No C102 W/M 4492 ` NQ REVISION BY DATE EXPIRES: 06/14,93 Y n 8 32 _ ., r r G H