Loading...
HomeMy WebLinkAboutS-071817/40 130 /20 //o 100 11rR__rrT s e E,rIS7 24" u, P rTTT -rr,-r -- U. P —M H RO/- 26 T YPE C *T �* � 5TA 129 f 7-4,54 "8 URN - - - - - N 184 269-20 E 7' T- - -- - - - -- E. 1660,676 -99 5EE DWG. P 209 ' FOR DE'T'A l L S AND No 7-E5, TH /5 A REA Z M. H. ROl - .�/ sra. 36 409.4 N. P P K rRAC/< 24 "� '4�C/ /TA,PY .rZ1W 2 l - ��► ♦ U.P 5 12 "3 - TTTTrM TITTr1TI-TT T-rTrtT•rrr rrTTTTTTT•r "r'r***T**'* N /8I, B 96.91 E /660, 765 15 N00 44,30 ",r 5 7. RIW L /,t/E l i scHEO�LE 4 SEE Of�GS. P40/ � P402 BORING /v0. /O EL . 126.0 U. �= �5 v. III T III TEMP. BLOC O!/T A1,,4LL FOAP FUruRE 96 u� I 5EE BELOW w 1, PLUG `Yh'E,l/ 91 2EC7E0 �LLLIIJJ!111�1 1111,1111 'J,���,1 i�_ M. N. FAO I - 30 — .115 141 f 7 82 N 182, 566. 27 E. /660, 773.78 I N S J Q Z �0 N. PRY. SPUR /40 130 PIPE MAY BE LUBRICATED W/,/ /L_L- BEING IACI<ED E1T9ER BY DRILLING /VOLES FROM SUPFACE OR BY DRILLING THR U P /PE SNEL L . IF B Y T",C L A T7-,E,P5 HOLES SyA L L BE SEALED W/ TI-1 EMBECO (TROUT AFTER CONIPL ET /ON OF JACkING, OVER EXCAVATION 3YALL BE BACK- PAC,(ED WIT1-1 SAND AND 6ROUTED. 131 /32 133 CARRIER PIPE .. %M -238 R.C,P ALTERNATIVE "A" INSTALLATION BY JACKING OF CARRIER STA. 56+64.36 TO STA. 57 + 74.36 VOIDS OUTSIDE OF L /HER CASING PIPE / TO BE BACK- PACKED - S GA. LINER /L. WITH SAND AND GROUTED, a CARRIER PIPE 108 ° : M- 238 11. C. P FILL VOIDS W /CLEAN P/T RUN SAND CONTINUOUS CREOSOTED q. !o TIMBER SKID FOR PIPE M /N. 6 "X 6" ` - FILL L 0WER ' 1200 W /GROUT A FTER PIPE PAS BEEN PLACED. ALTERNATIVE B INSTALLATION BY JACKING OR TUNNELING WITH LINER PLATES STA. 56 +64.36 TO STA. 57 +74.36 134- 135 130 / _:�f 7 13d PLAN AND PROFILE SCALE: HORIZONTAL 1 " =50', VERTICAL 1 " =10' PIPE MAYBE L UBRI CA TED = CA BRIER PIPE W14/LE BEING JACKED E /T/'/ER SEE l35LOW BY DRILL ING WOL ES FROM SURFACE OR BY DRILLING TiyRU PIPE SAIEL L . IF BY L ATER, HOLES SHALL BE SEALED W/Tg EMBECO ; GROUT AFTER COMPLETION q � OF JACKING ,y .P OVER EXCA VA T /ON Sh/A L L - 0 BE BACK-PACKED WITH SAND AND GROUTED. � �� ALTERNATIVE A INSTALLATION BY JACKING OF CARRIER M- LOAD STA. 89 +75 TO STA. 91+ 50 M- 289 STA. 96 + 03.27 TO STA. 96 + 91.87 M- 324 STA. 101+27.18 TO STA. 102 + 43.99 M- 324 VOIDS OUTSIDE' OF LINER At. TO BE BAC`(- PLCkED CAS /NCB PIPE WITH SAND AND GROOFEp •. •d a..0 � = 5 GA. LINER ! . V. .. FILL VOIDS W /CLEAN c�`s�y oaM ° a. - CA,4'RIER PIPE PIT RUN SAND G � _ 5EE BEL.OWY CONTINUOUS CREOSOTED _ o TIMBER SKID FOR PIPE FILL LOWER /20° MIN 6 "x 6" ;:: WIG ROUT AFTER PIPE HAS BEEN PL A CED, ALTERNATIVE "B" INSTALLATION BY JACKING OR TUNNELING WITH LINER PLATES M- LOAD STA. 89 t 75 TO STA. 91+ 50 M- 289 STA. 96+03.27 TO STA. 96+91.87 M- 324 STA. 101+2718 TO STA. 102+43.99 Em-3,04 r� PA /NT EZ)GES OF L.4,WI I.4r /OHS wlThH ASP/1ALr W/wx//V SETTING IN POSITION - 12 x /Z /> 3 x /2 % BL OCK /BLOCKAGA /HST +" ENO OFTRENCf1 8 Oo ONT,P,4C70R'S oPr�ow - ax8 8x8 POST- -� 'SECTION o8 I P20 3 x /2 - SPE, 2 L,4M /NAT IONS - USE 20 d G4LV. N,9 /L S FOR `- L A/f� /NATIONS BLOCKING 6x6 e D - 3/8x 6 ASPf/AL T- /MPREGNATEO GAS%('fT ALL A,PUUiVO I � � ' I .01 I I - -1 - - - - -� -- ' v v I _H1 I ■ ■� I ■� ffvmj, . ., �� I ■E3C■® '�;;�■��� �■ ■iii - �ii�r� mall■ ■III �Ii� III■ ■III � � ���■ � III■ X11■ ■_ �■ ■N� �■ VIII �n �N■ ■N� ■ III■ III■ -■ ■III r � • • • r � � • • i • X111, 11�. �■ ■� ■!ice � ■� - - - — ---- - - - - -- _ �i! �� 130 PIPE MAY BE LUBRICATED W/,/ /L_L- BEING IACI<ED E1T9ER BY DRILLING /VOLES FROM SUPFACE OR BY DRILLING THR U P /PE SNEL L . IF B Y T",C L A T7-,E,P5 HOLES SyA L L BE SEALED W/ TI-1 EMBECO (TROUT AFTER CONIPL ET /ON OF JACkING, OVER EXCAVATION 3YALL BE BACK- PAC,(ED WIT1-1 SAND AND 6ROUTED. 131 /32 133 CARRIER PIPE .. %M -238 R.C,P ALTERNATIVE "A" INSTALLATION BY JACKING OF CARRIER STA. 56+64.36 TO STA. 57 + 74.36 VOIDS OUTSIDE OF L /HER CASING PIPE / TO BE BACK- PACKED - S GA. LINER /L. WITH SAND AND GROUTED, a CARRIER PIPE 108 ° : M- 238 11. C. P FILL VOIDS W /CLEAN P/T RUN SAND CONTINUOUS CREOSOTED q. !o TIMBER SKID FOR PIPE M /N. 6 "X 6" ` - FILL L 0WER ' 1200 W /GROUT A FTER PIPE PAS BEEN PLACED. ALTERNATIVE B INSTALLATION BY JACKING OR TUNNELING WITH LINER PLATES STA. 56 +64.36 TO STA. 57 +74.36 134- 135 130 / _:�f 7 13d PLAN AND PROFILE SCALE: HORIZONTAL 1 " =50', VERTICAL 1 " =10' PIPE MAYBE L UBRI CA TED = CA BRIER PIPE W14/LE BEING JACKED E /T/'/ER SEE l35LOW BY DRILL ING WOL ES FROM SURFACE OR BY DRILLING TiyRU PIPE SAIEL L . IF BY L ATER, HOLES SHALL BE SEALED W/Tg EMBECO ; GROUT AFTER COMPLETION q � OF JACKING ,y .P OVER EXCA VA T /ON Sh/A L L - 0 BE BACK-PACKED WITH SAND AND GROUTED. � �� ALTERNATIVE A INSTALLATION BY JACKING OF CARRIER M- LOAD STA. 89 +75 TO STA. 91+ 50 M- 289 STA. 96 + 03.27 TO STA. 96 + 91.87 M- 324 STA. 101+27.18 TO STA. 102 + 43.99 M- 324 VOIDS OUTSIDE' OF LINER At. TO BE BAC`(- PLCkED CAS /NCB PIPE WITH SAND AND GROOFEp •. •d a..0 � = 5 GA. LINER ! . V. .. FILL VOIDS W /CLEAN c�`s�y oaM ° a. - CA,4'RIER PIPE PIT RUN SAND G � _ 5EE BEL.OWY CONTINUOUS CREOSOTED _ o TIMBER SKID FOR PIPE FILL LOWER /20° MIN 6 "x 6" ;:: WIG ROUT AFTER PIPE HAS BEEN PL A CED, ALTERNATIVE "B" INSTALLATION BY JACKING OR TUNNELING WITH LINER PLATES M- LOAD STA. 89 t 75 TO STA. 91+ 50 M- 289 STA. 96+03.27 TO STA. 96+91.87 M- 324 STA. 101+2718 TO STA. 102+43.99 Em-3,04 r� PA /NT EZ)GES OF L.4,WI I.4r /OHS wlThH ASP/1ALr W/wx//V SETTING IN POSITION - 12 x /Z /> 3 x /2 % BL OCK /BLOCKAGA /HST +" ENO OFTRENCf1 8 Oo ONT,P,4C70R'S oPr�ow - ax8 8x8 POST- -� 'SECTION o8 I P20 3 x /2 - SPE, 2 L,4M /NAT IONS - USE 20 d G4LV. N,9 /L S FOR `- L A/f� /NATIONS BLOCKING 6x6 e D - 3/8x 6 ASPf/AL T- /MPREGNATEO GAS%('fT ALL A,PUUiVO ELEVATION BULKHEAD DETAILS NO SCALE 130 /20 //o /00 .V74- /29 184.97 TD ,57,q /42194 33 - VE,P 441- Z. .SUBSEQUE�t/T 8.1�.E'F /LL : XW 129 ," 84.97 TO •S7,4, 14Z O" 94.33 — CL,4_v_r Q 3 SU,QFACE ,PESTO,PAT /DEC/: CITY Or RElY 710N 5PECIF1CA 770tYS' _ PIPE oES�G,y: 5 %4. /29 t 84. 97 TO 5TA. 142194.33 M- 236 &WO RECT /ON T AS ICON STRUC'TED DATE DEC. 24,1963 104! 5 SCHEDULE 2 MUNICIPALITY OF METROPOLITAN SEATTLE SEWAGE DISPOSAL PROJECT ,� C CAL 01f,' RENTON SYSTEM P� of wa sy,'S"i J� of wa sh�ti F� APE 2�� 2 O� ti� Cl z y EASTSIDE INTERCEPTOR —SECTION I cr O 9 O �s+FGISTE�kF,�4, °F G ST'p_" STA. 129+84.97 TO STA. 142 +94.33 AL EN ss /ANAL F'� METROPOLITAN ENGINEERS BROWN AND CALDWELL CAREY AND KRAMER HILL AND INGMAN R.W BECK AND ASSOCIATES APPROVED DESIGNED <�6` U7 RECOMYE j DRAWN TJ�'�„ — ___ —_ Prefect Engineer - Metropollton Engineers /�y� APPROVED CNECsED���� -- -� For Metropolitan Eopin.era / `���.1 suBMITTED _ Chse n m or -Metropolitan Engineers - DATE FILE NUMBER SHEET NUMBE 48 DRAWING HUMBER For Mumtlpol�ty of Metropolitan S.Dttl. MAY 19__61__ R 201 B __ _38 DF -_ P 2 0 8 I � � ' I .01 I I - -1 - - - - -� -- ' v v I _H1 I ELEVATION BULKHEAD DETAILS NO SCALE 130 /20 //o /00 .V74- /29 184.97 TD ,57,q /42194 33 - VE,P 441- Z. .SUBSEQUE�t/T 8.1�.E'F /LL : XW 129 ," 84.97 TO •S7,4, 14Z O" 94.33 — CL,4_v_r Q 3 SU,QFACE ,PESTO,PAT /DEC/: CITY Or RElY 710N 5PECIF1CA 770tYS' _ PIPE oES�G,y: 5 %4. /29 t 84. 97 TO 5TA. 142194.33 M- 236 &WO RECT /ON T AS ICON STRUC'TED DATE DEC. 24,1963 104! 5 SCHEDULE 2 MUNICIPALITY OF METROPOLITAN SEATTLE SEWAGE DISPOSAL PROJECT ,� C CAL 01f,' RENTON SYSTEM P� of wa sy,'S"i J� of wa sh�ti F� APE 2�� 2 O� ti� Cl z y EASTSIDE INTERCEPTOR —SECTION I cr O 9 O �s+FGISTE�kF,�4, °F G ST'p_" STA. 129+84.97 TO STA. 142 +94.33 AL EN ss /ANAL F'� METROPOLITAN ENGINEERS BROWN AND CALDWELL CAREY AND KRAMER HILL AND INGMAN R.W BECK AND ASSOCIATES APPROVED DESIGNED <�6` U7 RECOMYE j DRAWN TJ�'�„ — ___ —_ Prefect Engineer - Metropollton Engineers /�y� APPROVED CNECsED���� -- -� For Metropolitan Eopin.era / `���.1 suBMITTED _ Chse n m or -Metropolitan Engineers - DATE FILE NUMBER SHEET NUMBE 48 DRAWING HUMBER For Mumtlpol�ty of Metropolitan S.Dttl. MAY 19__61__ R 201 B __ _38 DF -_ P 2 0 8