Loading...
HomeMy WebLinkAboutS-071826.l PC EL[ (77�P /CAL) TtIVrCAI 1rnv RFo4D ouTtEr srRucruRE SEE NOTE 2 //x �E 5 RE FZ000 CCWrROL C)YAAlA(EL -- 0�,4. rrmRaRARY 5yp.4ss SE E NO 7E 3 AAID 5EC rI on/ 8 /OW6 5 - 2 -5` -0 LOA/6 7-RAN51 r1oAl 6 8"x 72" IivLEr P/EcE SEE J DWG 9 G h � IS6 N 1 s — doe = - • a •. --- __- - -- - -- • -- - -- - -- - -- — - -_ - -- - -_ to - -- N EXST 10"d" DiA, RCP o , [7� HEAD ivtl 3TRIC'!RE (EASTS /DE /NTERCEPr�4 -SEC t N fia-n /o•o SEE w A T E 2 6 G AVAf 7 MAX SEE No rE r 6 3 AfW 75'Afwr sFF Avrc 1 SEE me p /PE dO/Nr ti ti c'1 Q PLAN — CONSTRUCTION STAGE I SCALE: I"= 10' Ot FL7TC/f{E fL000 G0K77SOL CHAN/iffl� 7 ti ti N 0) p1pe ilow r 2 6 7 6 FOr9 70NS C1F , 6lKHEAD io 11 RCP SEE NO � E 5 _ -SEE NorE f -- - - -- 6 • - - L FLOW d4v—J Y , 70W HEA D SFCn �SUt R'�F�D SEF NaT G 10W NFAV T KAAM1 T on/ SEE G/ 7 SEE 7 /OWS 7 _ L DW ffFA D TRA N/ 3/ r /ON SEE G l D`6 7 LOW "FAD 5rq uc ruRE r PLAN CONSTRUCTION STAGE Ir SCALE: I" = 10' FU ]URE FLOOD CCTV 790L CN4AIAtEL - � 5 C ONS TR UC T /OI'V IJV T 6 RPfOVF 7�l �' R79AR)e 8)e, A FS TYPICAL KIALLS AND ` � 5EE NOrE 8 j TOi° SLAB \x -� '• s (*4� • 1 -ii 9 i 6 • 1 '• I FLOW 5 A. _ - f � I IIf- _ ' GENERAL CONSTRUCTION NOTES GENERAL 1 THE WORK IS (N 3 STAGEAD STAGE I C I1 'iH'E t E1ER0 INLET AND OUTLET STRUCTURES THE TEMPORARY BYPASS; STAGE It DIVERSION THROUGH THE TEMPORARY BYPASS REMOVAL OF THE EXIONG 108-INCH RCP AND CONSTRUCTION OF THE LOW MEAD CONDUIT• STAGE I I I REMOVAL OF THE TEMPORARY BYPASS AND COMPLETION OF THE INLET ANA OUTLET STRUCTURES, THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE FOR ALL STAGES OF THE WORK COMPLETE WITH METHODS AND SEQUENCE OF HIS OPERATIONS, tl CONSTRUCTION STAGE 1 1. SEE ADDENDA i a, THE CONTRACTOR SHALL SUPPORT 'T EXTST1NG IM 1NCH RCP WRLE CONSTRUCTING THE INLET AND OUTLET STRUCTURES. 3. THE CONTRACTOR SHALL CONSTRUCT THE 48- INCH I* D. TEMPORARY BYPASS CONDUIT ON THE LOCATION SHOWN, THE BYPASS CONDUIT MAYBE UNLINED AND UNCOATED 1/4-INCH WALL STEEL PIPE. ALL P I PE JOINTS SHALL BE RESTRAINED FOR 10 PS IG. 4. THE BACKFILLING AROUND THE 48 -INCH BYPASS CONDUIT IT DiJR TNG THE WORK SHALL BE AT THE CONTRACTOR'S OPTION. IF THE CONTRACTOR ELECTS TO BACKFILL THE BYPASS CONDUIT THE BACKFILLING SHALL BE AS SPECIFIED FOR P IPELINES, FOLLOWING REMOVAL OF THE BYPASS CONDUIT THE I EXCAVATION SHALL BE BACKF I LLED AS SPECIFIED FOR CLASS 17 SUBSEQUENT BACKFILL, I IT CONSTRUCTION STAGE I I 5. THE CONTRACTOR SHALL LINE DRILL AND RED PORfiIQI�ts 01� "fTiE EXTSTTNG 108 -INCH RCP AS SHOWN, 60 T1 4E CONTRACTOR SHALL INSTALL THE TEMPORARY BULKHEADS DEBATER THE RCP BETWEEN STRUCTURES REMOVE THE EXISTING RCP BETWEEN STRUCTURES AND CONSTRUCT NE LOW HEAD CON DU IT. IV C.ON.S.I.RU— jJ 5JAGE 1 I 1 _ 7, THE CONTRACTOR SHALL RENIOVE THE TEMPORARY BULKHEADS CHAM THE INLET AND OUTLET STRUCTURES AND COMPLETE THE STRUCTURES. L FOLLOWING COMPLETION OF THE STRUCTURES THE CONTRACTOR SHALL REMOVE THE TEMPORARY BYPASS CONDUIT, dOMPLETE ALL BACKFILLING AND RESTORE THE SITE. 9 ` 0'6 1.2r 7—YP. . S EC T10N 9 5 SCALE =�8 RI' -0 •�8 "Drat. TFI��f��RARr' AYPASs SEE NorES 9 4 0 EX CAVATfO GRADE —� � ' � 1 f � � R ���Pr on/ CKF/LC I )SEDOtNG CLASS �I 5U8 5EgL1FnV r gAcKFILL 8 TEMPORARY BYPASS - SECTION 5 SCALE: 3/g" Im LOWYEAD OMET SrRUCTURF LOW HEAD 'PG DOWELS 0 121 TYi° 10 HFAD /N[ ET 57X11C71/9E SEE NOTE 7 STRUCTURE OF WALLS AND SLAB SEE NOrC- 7 BLOCKED OUT ^2f A rO R �2fMn vA L 'Or 11VTEi? 10Q F0,Q MS - CL_ nSI/RE G4ST KEYED it # 6 P 12 C. C A DDED N PLAN - CON STRUCTI ON STAGE III SCALE: I"= 10' •��N C• � �R F. w� P� of WA sy /,P �C� Of W4stiff o N , .5 AS �sS 01ST ERA \�<v FS GIST ER���'�`w DATE MARCH 1972 �ONgL ENS' S/ONAL E� DESIGNED METROPOLITAN ENGINEERS M U N I C I PA I T Y 0 F� METROPOLITAN SEATTLE RENTON DRAWING NUMBER c/55 /7C-0 M 230 W MODIFICATIONS - EASTSIDE INTERCEPTOR SECTION I M FILE DRAWN WG BROWN AND CALDWELL CAREY AND KRAMER _ - GENERAL PLANS AND NOTES SUBMITTED RECOM Z�a APPROVED C APPROVED APPROVED SCALE JUNE 1971 SYSTEM SHEET NUMBER CHECKED MG'0 HILL AND ING M A N R.W. 8E C K AND ASSOCIATES IAT E S pesi n En i - Metropolitan En ineers P e En meer - Iropoliton En inetrs Chief En inee - Metropolitan En i eers For Metropolitan E ineers For Munici olit1 of Metropolitan Seattle AS NOTED PATE OF 9 9 9 9 9 9 9 n9 P Y