Loading...
HomeMy WebLinkAboutPDF_S3 Bravo Environmental 425-424-9000 City : Renton Inspection Report Date P/O. No.Weather Surveyor's Name Pipe Segment Reference Section No. Certificate No.Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category Street123 Use of Sewer Upstream MH City Drainage Area Dowstream MH Loc. details Flow Control Dir. of Survey Location Code Length surveyed Section Length Purpose of Survey Joint Length Year Laid Dia./Height Year Rehabilitated Material Tape / Media No.Lining Method Add. Information : 3/5/2015 Dry Max Stillings 3 06023296 116th Ave SE & SE 186th St Renton Stormwater 104.80 ft CB3 CB1 Downstream 104.80 ft Pre-Acceptance 12 inch Polyethylene 1:180 Position Observation Lakeside Fairwood Plat - 116th Ave SE & SE 186th St // Page: 1 0.00 Catch Basin / CB3 0.00 Water Level, 5 %of cross sectional area / No Flow 0.00 General Observation / 1" target, each lip/groove is 1/8" 4.00 S1 Deposits Settled Fine, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start / Sediment at begin of survey 23.60 F1 Deposits Settled Fine, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish 32.70 S2 Water Level, Sag in pipe, 5 %of cross sectional area, Start / Ponding Starts, 3/4" 35.90 F2 Water Level, Sag in pipe, 5 %of cross sectional area, Finish / Ponding Ends 44.20 S3 Water Level, Sag in pipe, 5 %of cross sectional area, Start / Ponding Starts, 5/8" 53.60 F3 Water Level, Sag in pipe, 5 %of cross sectional area, Finish / Ponding Ends 53.60 S4 Water Level, Sag in pipe, 5 %of cross sectional area, Start / Ponding Starts, 1" 57.80 S5 Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start / Sediment bottom of pipe 67.70 F4 Water Level, Sag in pipe, 5 %of cross sectional area, Finish / Ponding Ends 67.70 F5 Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish / End of deposits 70.30 S6 Water Level, Sag in pipe, 5 %of cross sectional area, Start / Ponding Starts, greater than 1" CB3 Bravo Environmental 425-424-9000 City : Renton Inspection Report Date :Job number :Weather :Operator :Counter :Section name : Present :Vehicle :Camera :Preset :Cleaned :Rate : Dry Max Stillings 3 1:180 Position Observation Lakeside Fairwood Plat - 116th Ave SE & SE 186th St // Page: 2 102.60 F6 Water Level, Sag in pipe, 5 %of cross sectional area, Finish / Ponding Ends, approx. 1/2" at end of survey section 104.80 Catch Basin / CB1 CB1 QSR QMR SPR MPR OPR SPRI MPRI OPRI 2B00 2600 26 12 38 2 2 2