Loading...
HomeMy WebLinkAboutPDF_S1 Bravo Environmental 425-424-9000 City : Renton Inspection Report Date P/O. No.Weather Surveyor's Name Pipe Segment Reference Section No. Certificate No.Survey Customer System Owner Date Cleaned Pre-Cleaning Sewer Category Street123 Use of Sewer Upstream MH City Drainage Area Dowstream MH Loc. details Flow Control Dir. of Survey Location Code Length surveyed Section Length Purpose of Survey Joint Length Year Laid Dia./Height Year Rehabilitated Material Tape / Media No.Lining Method Add. Information : 3/24/2015 Heavy Rain Max Stillings 1 06023296 116th Ave SE & SE 186th St Renton Stormwater 111.50 ft CB5 Outfall Downstream 111.50 ft Pre-Acceptance 3/24/2015 12 inch Polyethylene 1:280 Position Observation 116th Ave SE & 186th St, Renton // Page: 1 0.00 Water Level, 5 %of cross sectional area / No Flow 0.00 General Observation / 1" Ball Target 0.00 Catch Basin / CB5 Begin Survey Section 19.20 S1 Water Level, Sag in pipe, 5 %of cross sectional area, Start / 1/4" sag 43.40 F1 Water Level, Sag in pipe, 5 %of cross sectional area, Finish / End sag 111.50 Discharge Point / Outfall, End Survey Section CB5 Outfall QSR QMR SPR MPR OPR SPRI MPRI OPRI 2500 0000 10 0 10 2 0 2