HomeMy WebLinkAboutS-03711010,3[TrJY 03,3P R NTMON 1 ii W R R D10 P N Lej R LejOG2 T ND L Tr -TON EM.11j.]PPROYMmlm �NT"Ni- PROJECT NO. WWP-27-3711 SPRING 2014 I 13. AT NO TIME SHALL THE ENTIRE ROAD BE CLOSED DURING CONSTRUCTION. CONTRACTOR SHALL KEEP A MINIMUM OF ONE LANE 3. CONTRACTOR MUST KEEP A COPY OF THE APPROVED PLANS ON-SITE WHENEVER CONSTRUCTION IS IN PROGRESS. OPEN AT ALL TIMES. 4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES.I I 4. THE DEEP MANHOLE ON MILL AVE IS LOCATED IN THE CENTER OF THE STREET. A TRAFFIC CONTROL PLAN WILL BE REQUIRED CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FOR WORK DONE AT THIS LOCATION. FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. 5. THE MANHOLE ON MAIN AVE S IS LOCATED ABOVE THE RETAINING WALL, EAST OF THE STREET. A TRAFFIC CONTROL PLAN WILL 5. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING COMPLETE AS -CONSTRUCTED (AS BUILT) RECORDS. I I BE REQUIRED FOR WORK DONE AT THIS LOCATION. 6. CONSTRUCTION OF IMPROVEMENTS SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF RENTON AND KING COUNTY STANDARDS AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2014 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION. THESE DOCUMENTS HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS. 7. A PRECONSTRUCTION CONFERENCE AND 24-HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION OR RESTARTING CONSTRUCTION AFTER A PERIOD OF MORE THAN 30 DAYS OF NO WORK BEING PERFORMED. 8. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO CONDITIONS EQUAL OR BETTER TO THOSE FOUND PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REFRESH LANDSCAPING BARK IN ALL LANDSCAPE AREAS DISTURBED DURING CONSTRUCTION. 9. SEE DIVISION 1 OF THE SPECIFICATIONS FOR PERMIT INFORMATION. 10. THE CONTRACTOR SHALL CLEANUP ALL AREAS AFFECTED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE CITY REPRESENTATIVE BY THE END OF EACH WORKING DAY OR MORE FREQUENTLY IF REQUIRED BY THE CITY REPRESENTATIVE. THIS INCLUDES REMOVAL OF ALL DUST, MUD, ROCKS, ASPHALT DEBRIS, AND REFUSE FROM STREETS, SIDEWALKS, DRIVEWAYS, AND ANY OTHER AREAS AFFECTED BY THE CONSTRUCTION ACTIVITIES. FAILURE TO CLEANUP TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE WILL NECESSITATE A SHUTDOWN OF THE PROJECT UNTIL CLEANUP IS PROPERLY PERFORMED. DAILY CLEANUP IS AN INTEGRAL PART OF EROSION AND POLLUTION CONTROL. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED TO PERFORM THE WORK. 12. SEE SECTION 1-07.28 OF THE SPECIAL PROVISIONS PERTAINING TO CONFINED SPACE ENTRY. 6. TRAFFIC CONTROL WILL NOT BE REQUIRED AT THE LIFT STATION AND RESERVOIR SITES. PLAN DRAWINGS GENERAL SYMBOLOGY SECTION AND DETAIL REFERENCES THE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLAN FROM WHICH IT IS REFERENCED. REFERENCE BUBBLES ID PLAN REFERENCE BUBBLE - REFERS ## READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED. ID Nh, DETAIUSECTION REFERENCE BUBBLE - ## REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED. WHERE, ID = SECTION/DETAIL REFERENCE NUMBER ## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES. SECTION/DETAIL REFERENCE NUMBER CONVENTIONS: SECTIONS OR ELEVATIONS SHOULD HAVE A LETTER REFERENCE NUMBER (A THROUGH ZZ). CALL 48 HOURS BEFORE YOU DIG ONE CALL 1-800-424-5555 REPORT ALL SPILLS DEPT. OF ECOLOGY 1-800-258-5990 Sheet List Table TRAFFIC CONTROL Sheet Title CONTACT INFORMATION CONTACT ITPHONE MIKE BENOIT CITY OF RENTON WASTEWATER UTILITY ENGINEER (425) 430-7206 GENERAL NOTES COVER AND GENERAL NOTES COV 01 LIFT STATION MAP - NORTH 1. THE CONTRACTOR SHALL PREPARE TRAFFIC CONTROL PLAN(S) SHOWING SIGNAGE AND FLAGGERS AS NEEDED TO COMPLETE 02 DAVE CHRISTENSEN CITY OF RENTON WASTEWATER UTILITY SUPERVISOR (425) 430-7212 CO2 03 THESE IMPROVEMENTS AND SUBMIT TO CITY FOR APPROVAL. NO WORK SHALL COMMENCE UNTIL ALL APPROVED TRAFFIC S01 DAVE MCKINNEY CITY OF RENTON WASTEWATER LIFT STATION TECH. (425) 766-4909 1. CONTRACTOR SHALL CALL 1-800-424-5555 FOR UTILITY LOCATES 48 HOURS BEFORE CONSTRUCTION. THE CONTRACTOR S02 CONTROL IS IN PLACE. ALL TRAFFIC CONTROL DEVICES AND PROCEDURES SHALL COMPLY WITH THE MANUAL ON UNIFORM ELECTRICAL MODIFICATIONS AT MILL AVE MANHOLE SHANE COUTY CITY OF RENTON WASTEWATER LIFT STATION TECH. (425) 766-6185 SHALL HAVE ALL UTILITIES LOCATED BY THE APPROPRIATE UTILITY LOCATING PROFESSIONALS, PRIOR TO AND DURING HAZEN RESERVOIR RADIO REPEATER ELECTRICAL PLAN TRAFFIC CONTROL DEVICES (MUTCD), WSDOT AND THE CITY OF RENTON STANDARDS. 07 MARK MILLER RH2 ENGINEERING PROJECT MANAGER (425) 951-5372 CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND THE UTILITY COMPANY WHEN A 08 WEST HILL RESERVOIR RADIO REPEATER ELECTRICAL PLAN E04 DAVID BAISCH RH2 ENGINEERING PROJECT ENGINEER (425) 951-5426 CONFLICT OCCURS OR WHEN A CONFLICT IS ANTICIPATED. 2. THE CONTRACTOR SHALL PROVIDE FOR EMERGENCY VEHICLE ACCESS TO ALL STREETS WITHIN AND ADJACENT TO THE ZEB BREUCKMAN RH2 ENGINEERING PROJECT ELECTRICAL ENGINEER (425) 951-5316 g CONSTRUCTION SITE. THE CONTRACTOR SHALL PROVIDE 48-HOUR NOTICE TO EMERGENCY DEPARTMENTS WHICH MAY BE DAVID HONEYSETT POTELCO / P.S.E. SERVICE CONTACT (253) 677-7726 2. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ENGINEER FOR APPROVAL PRIOR TO AFFECTED BY ACTIONS OF THE CONTRACTOR. KYLE KINNEY COMCAST CONSTRUCTION COORDINATOR (206) 255-2602 IMPLEMENTATION OR CONSTRUCTION. I 13. AT NO TIME SHALL THE ENTIRE ROAD BE CLOSED DURING CONSTRUCTION. CONTRACTOR SHALL KEEP A MINIMUM OF ONE LANE 3. CONTRACTOR MUST KEEP A COPY OF THE APPROVED PLANS ON-SITE WHENEVER CONSTRUCTION IS IN PROGRESS. OPEN AT ALL TIMES. 4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE PUBLIC AND PREVENT NUISANCES.I I 4. THE DEEP MANHOLE ON MILL AVE IS LOCATED IN THE CENTER OF THE STREET. A TRAFFIC CONTROL PLAN WILL BE REQUIRED CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL FOR WORK DONE AT THIS LOCATION. FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS. 5. THE MANHOLE ON MAIN AVE S IS LOCATED ABOVE THE RETAINING WALL, EAST OF THE STREET. A TRAFFIC CONTROL PLAN WILL 5. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING COMPLETE AS -CONSTRUCTED (AS BUILT) RECORDS. I I BE REQUIRED FOR WORK DONE AT THIS LOCATION. 6. CONSTRUCTION OF IMPROVEMENTS SHALL CONFORM TO THE CURRENT EDITION OF THE CITY OF RENTON AND KING COUNTY STANDARDS AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2014 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION. THESE DOCUMENTS HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS. 7. A PRECONSTRUCTION CONFERENCE AND 24-HOUR NOTICE WILL BE REQUIRED PRIOR TO STARTING CONSTRUCTION OR RESTARTING CONSTRUCTION AFTER A PERIOD OF MORE THAN 30 DAYS OF NO WORK BEING PERFORMED. 8. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO CONDITIONS EQUAL OR BETTER TO THOSE FOUND PRIOR TO CONSTRUCTION. CONTRACTOR SHALL REFRESH LANDSCAPING BARK IN ALL LANDSCAPE AREAS DISTURBED DURING CONSTRUCTION. 9. SEE DIVISION 1 OF THE SPECIFICATIONS FOR PERMIT INFORMATION. 10. THE CONTRACTOR SHALL CLEANUP ALL AREAS AFFECTED BY THEIR ACTIVITIES TO THE SATISFACTION OF THE CITY REPRESENTATIVE BY THE END OF EACH WORKING DAY OR MORE FREQUENTLY IF REQUIRED BY THE CITY REPRESENTATIVE. THIS INCLUDES REMOVAL OF ALL DUST, MUD, ROCKS, ASPHALT DEBRIS, AND REFUSE FROM STREETS, SIDEWALKS, DRIVEWAYS, AND ANY OTHER AREAS AFFECTED BY THE CONSTRUCTION ACTIVITIES. FAILURE TO CLEANUP TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE WILL NECESSITATE A SHUTDOWN OF THE PROJECT UNTIL CLEANUP IS PROPERLY PERFORMED. DAILY CLEANUP IS AN INTEGRAL PART OF EROSION AND POLLUTION CONTROL. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED TO PERFORM THE WORK. 12. SEE SECTION 1-07.28 OF THE SPECIAL PROVISIONS PERTAINING TO CONFINED SPACE ENTRY. 6. TRAFFIC CONTROL WILL NOT BE REQUIRED AT THE LIFT STATION AND RESERVOIR SITES. PLAN DRAWINGS GENERAL SYMBOLOGY SECTION AND DETAIL REFERENCES THE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLAN FROM WHICH IT IS REFERENCED. REFERENCE BUBBLES ID PLAN REFERENCE BUBBLE - REFERS ## READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED. ID Nh, DETAIUSECTION REFERENCE BUBBLE - ## REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED. WHERE, ID = SECTION/DETAIL REFERENCE NUMBER ## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES. SECTION/DETAIL REFERENCE NUMBER CONVENTIONS: SECTIONS OR ELEVATIONS SHOULD HAVE A LETTER REFERENCE NUMBER (A THROUGH ZZ). CALL 48 HOURS BEFORE YOU DIG ONE CALL 1-800-424-5555 REPORT ALL SPILLS DEPT. OF ECOLOGY 1-800-258-5990 Sheet List Table Sheet Number Sheet Title Dwg No IE COVER AND GENERAL NOTES COV 01 LIFT STATION MAP - NORTH C01 02 LIFT STATION MAP - SOUTH CO2 03 MILL AVE. MANHOLE MODIFICATION DETAILS S01 04 LIFT STATION ACCESS HATCH GUARD DETAILS S02 05 ELECTRICAL MODIFICATIONS AT MILL AVE MANHOLE E01 06 HAZEN RESERVOIR RADIO REPEATER ELECTRICAL PLAN E02 07 HAZEN RESERVOIR ELECTRICAL DETAILS E03 08 WEST HILL RESERVOIR RADIO REPEATER ELECTRICAL PLAN E04 REVISED TO CONFORM TO CONSTRUCTION RECORDS 4/17/14 ROJECT ENGINEER DATE m ABBREVIATIONS CB CATCH BASIN FM FORCE MAIN IE INVERT ELEVATION PVMT PAVEMENT RE RIM ELEVATION SSMH SANITARY SEWER MANHOLE TESC TEMPORARY EROSION AND SEDIMENT CONTROL TYP TYPICAL WMH WATER MANHOLE GALV GALVANIZED STL STEEL UN Z2 W O J z Z Q ILI O V co C3 N O N W ~ m W o o 0 Lu U in o m s � g co C3 N O N W ~ o 0 Lu U in o s � 'I 1 1 1� SCALE: SHOWN 1' 1' 2' DRAWING IS FULL SCALE WHEN BAR MEASURES 2" coo ---- V08