HomeMy WebLinkAboutS-381702J
L1.1
(� w
0
W LJ
� w
�.- cn
� z
N <
W
Z
V)
'A'
'B'
N
PC
w
O
N
6" MIN.
I
3
r-
54" MH
�
8" MIN.
o
24" MIN.
24" I.D.
60" MH
60"
1 8" MIN.
a.
1 42" MIN.
30" I.D.
W
0
3
7
Z
M
J
L1.1
(� w
0
W LJ
� w
�.- cn
� z
N <
W
Z
V)
'A'
'B'
N
PC
w
48" MH
'
6" MIN.
5 "MIN
3
h
54" MH
54
8" MIN.
5.5' MIN.
24" MIN.
24" I.D.
60" MH
60"
1 8" MIN.
a.
1 42" MIN.
30" I.D.
W
0
3
7
Z
M
1
Z
w
Q
O
M
0
O
Z
Utility Specifications
Sanitary Sewer Notes and Specifications
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY.
1. All work and work material shall be in conformance with the standards and specifications
of the City of Renton Planning/Building /Public Works Department and the latest edition
of the WSDOT/APWA Standards and Specifications, as approved and modified by the
City of Renton in the Renton Standard Plans & Specifications. A set of approved plans
shall be kept on site at all times during construction.
2. The hours of work in the street right of way shall be per City specifications on weekdays
unless otherwise approved in writing by the Planning /Building /Public Works Department.
An approved traffic control plan must be obtained prior to beginning any work within
public right of way.
3. All locations of existing utilities shown are approximate and it shall be the contractor's
responsibility to verify the true and correct location so as to avoid damage or
disturbance.
4. A pre - construction conference and a 24 hour notice shall be required prior to starting
new construction. It shall be the contractor's responsibility to secure all necessary
permits prior to starting construction. (Inspection will be accomplished by a
representative of the City of Renton.) It shall be the contractor's responsibility to notify
the Public Works inspector 24 hours in advance of backfilling all construction.
5. Contractor is solely responsible for the means, methods and sequences of construction
and for the safety of workers and others on the construction site.
6. It shall be the responsibility of the contractor to obtain street use and any other related
permits prior to any construction.
7. Plans approved by the City of Renton, Public Works Department shall take precedence
over all other plans.
8. A copy of these approved plans must be on the job site whenever construction is in
progress.
9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary
sewer system, which has been stamped and signed by a licensed professional engineer
or licensed professional surveyor.
10. Backfill shall be placed equally on both sides of the pipe in layers with a loose average
depth of 6 inches, maximum depth of 8 inches, thoroughly tamping each layer to 95
percent of maximum density. These compacted layers must extend for one pipe
diameter on each side of the pipe or to the side of the trench. Materials to complete the
fill over pipe shall be the same as described.
11. Open cut road crossings for utility trenches on existing traveled roadway shall be
back filled with crushed rock and mechanically compacted unless otherwise approved by
12. Datum for Vertical Control shall be North American Vertical Datum 1988 Meters, and for
Horizontal Control shall be North American Datum 1983/1991 Meters unless otherwise
approved by the City of Renton Public Works Department. Reference benchmark and
elevations are noted on the plans.
13. All disturbed areas shall be seeded and mulched or otherwise stabilized to the
satisfaction of the Department for the prevention of on -site erosion after the completion
of construction.
14. All pipe and appurtenances shall be laid on a properly prepared foundation in
accordance with the standards and specifications of the City of Renton
Planning /Building /Public Works Department and the latest edition of the WSDOT /APWA
Standards and Specifications, as approved and modified by the City of Renton in the
Renton Standard Plans & Specifications. This shall include necessary leveling of the
trench bottom or the top of the foundation material, as well as placement and
compaction of required bedding material, to uniform grade so that the entire length of
the pipe will be supported on a uniformly dense, unyielding base. Pipe bedding shall be
pea gravel 6 inches above and below the pipe.
15. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034,
SDR 35, or ductile iron class 50, unless otherwise approved by the Wastewater Utility.
16. In unimproved areas, manhole to extend minimum 6 inches and maximum 12 inches
above finished grade or must have minimum 2' diameter concrete ring poured at grade.
In paved area, cover must slope in all directions to match paving.
7'
v
O
PORTION OF THE NE 1/4 OF THE NW 1/4
SECTION 14, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON, STATE OF WASHINGTON
NOT TO SCALE
MANHOLE FRAM AND COVER
SEE STD. PLAN 401
ADJUSTMENT RINGS (2' MIN.)
SEE NOTE 6
MORTAR JOINT(S) (3/8' MIN.)
SEE NOTE 5
CONE (ECCENTRIC)
RUBBER GASKETED JOINTS IN
ACCORDANCE WITH ASTM C -443
STEPS - POLYPROPYLENE STEPS
SHALL BE INCLUDED
CONCRETE RISER BY PIPE INC..
OR APPROVED EQUAL.
LADDER- POLYPROPYLENE
SHALL BE ATTACHED TO MANHOLE
MAX PIPE SIZE - 'E'
CONCRETE SHELF
PRECAST BASE SECTION
OR CAST IN SHELF.
'A'
'B'
'C'
'D'
'E'
48" MH
48"
6" MIN.
5 "MIN
24' MIN.
21" I.D.
54" MH
54
8" MIN.
5.5' MIN.
24" MIN.
24" I.D.
60" MH
60"
1 8" MIN.
a.
1 42" MIN.
30" I.D.
7
w
Q
O
M
0
O
Z
Utility Specifications
Sanitary Sewer Notes and Specifications
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY.
1. All work and work material shall be in conformance with the standards and specifications
of the City of Renton Planning/Building /Public Works Department and the latest edition
of the WSDOT/APWA Standards and Specifications, as approved and modified by the
City of Renton in the Renton Standard Plans & Specifications. A set of approved plans
shall be kept on site at all times during construction.
2. The hours of work in the street right of way shall be per City specifications on weekdays
unless otherwise approved in writing by the Planning /Building /Public Works Department.
An approved traffic control plan must be obtained prior to beginning any work within
public right of way.
3. All locations of existing utilities shown are approximate and it shall be the contractor's
responsibility to verify the true and correct location so as to avoid damage or
disturbance.
4. A pre - construction conference and a 24 hour notice shall be required prior to starting
new construction. It shall be the contractor's responsibility to secure all necessary
permits prior to starting construction. (Inspection will be accomplished by a
representative of the City of Renton.) It shall be the contractor's responsibility to notify
the Public Works inspector 24 hours in advance of backfilling all construction.
5. Contractor is solely responsible for the means, methods and sequences of construction
and for the safety of workers and others on the construction site.
6. It shall be the responsibility of the contractor to obtain street use and any other related
permits prior to any construction.
7. Plans approved by the City of Renton, Public Works Department shall take precedence
over all other plans.
8. A copy of these approved plans must be on the job site whenever construction is in
progress.
9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary
sewer system, which has been stamped and signed by a licensed professional engineer
or licensed professional surveyor.
10. Backfill shall be placed equally on both sides of the pipe in layers with a loose average
depth of 6 inches, maximum depth of 8 inches, thoroughly tamping each layer to 95
percent of maximum density. These compacted layers must extend for one pipe
diameter on each side of the pipe or to the side of the trench. Materials to complete the
fill over pipe shall be the same as described.
11. Open cut road crossings for utility trenches on existing traveled roadway shall be
back filled with crushed rock and mechanically compacted unless otherwise approved by
12. Datum for Vertical Control shall be North American Vertical Datum 1988 Meters, and for
Horizontal Control shall be North American Datum 1983/1991 Meters unless otherwise
approved by the City of Renton Public Works Department. Reference benchmark and
elevations are noted on the plans.
13. All disturbed areas shall be seeded and mulched or otherwise stabilized to the
satisfaction of the Department for the prevention of on -site erosion after the completion
of construction.
14. All pipe and appurtenances shall be laid on a properly prepared foundation in
accordance with the standards and specifications of the City of Renton
Planning /Building /Public Works Department and the latest edition of the WSDOT /APWA
Standards and Specifications, as approved and modified by the City of Renton in the
Renton Standard Plans & Specifications. This shall include necessary leveling of the
trench bottom or the top of the foundation material, as well as placement and
compaction of required bedding material, to uniform grade so that the entire length of
the pipe will be supported on a uniformly dense, unyielding base. Pipe bedding shall be
pea gravel 6 inches above and below the pipe.
15. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034,
SDR 35, or ductile iron class 50, unless otherwise approved by the Wastewater Utility.
16. In unimproved areas, manhole to extend minimum 6 inches and maximum 12 inches
above finished grade or must have minimum 2' diameter concrete ring poured at grade.
In paved area, cover must slope in all directions to match paving.
7'
v
O
PORTION OF THE NE 1/4 OF THE NW 1/4
SECTION 14, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON, STATE OF WASHINGTON
NOT TO SCALE
MANHOLE FRAM AND COVER
SEE STD. PLAN 401
ADJUSTMENT RINGS (2' MIN.)
SEE NOTE 6
MORTAR JOINT(S) (3/8' MIN.)
SEE NOTE 5
CONE (ECCENTRIC)
RUBBER GASKETED JOINTS IN
ACCORDANCE WITH ASTM C -443
STEPS - POLYPROPYLENE STEPS
SHALL BE INCLUDED
CONCRETE RISER BY PIPE INC..
OR APPROVED EQUAL.
LADDER- POLYPROPYLENE
SHALL BE ATTACHED TO MANHOLE
MAX PIPE SIZE - 'E'
CONCRETE SHELF
PRECAST BASE SECTION
OR CAST IN SHELF.
NOTES:
1. STEPS TO BE POLYPROPYLENE SAFETY STEPS.
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED.
3. CASTING SHALL BE PER STD. PLAN 401.
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE.
5. ALL JOINTS BETWEEN THE CONE, RISER RINGS, BRICKS AND CASTING SHALL BE GROUTED.
6. ADJUSTMENT OF THE CASTING TO GRADE SHALL BE ACCOMPLISHED VATH A COMBINATION OF
ADJUSTMENT RINGS. BRICKS AND MORTAR Q&, BRICKS SHALL BE STAGGERED TO CREATE A RUNNING
BOND OR 1/2 BOND. THE USE OF SHIMS IS PROHIBITED.
7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING,
COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR
APPROVED EQUAL. COLOR OF COATING SHALL BE WHITE.
8. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443.
9. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 OF THE INSIDE DIAMETER OF THE LARGEST PIPE.
10. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR
APPROVED EQUAL.
11. IN UNIMPROVED AREAS. MANHOLES SHALL EXTEND A MINIMUM OF 6" AND A MAXIMUM OF 12"
ABOVE FINISHED GRADE OR MUST HAVE A MINIMUM 2' DIAMETER CONCRETE RINGS POURED AT GRADE.
IN PAVED AREAS, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
�~ �0 SM. PSM - 400.1
PUBLIC 1�ORKS STANDARD SANITARY MANHOLE
DEPARTMENT STANDARD
2011
LANE LINE
MARKING 7`-8n on
STANDARD VEHICLE WHEEL PATH
-- 3'
MIN.
2" CLASS 'B'
2" SAWCUT AND REMOVE
OR GRIND, SEAL WITH
AR4000W
4.5' 3' -
MIN. > MIN.
I I-\ \ \ I I N
I
2.5'
MIN.
*MINIMUM ACP CLASS 'E' or 'B' SHALL BE:
PRINCIPAL /MINOR /COLLECTOR ARTERIAL STREETS A INDUSTRIAL
ACCESS STREETS - 6' ACP CLASS 'E' or 'B'.
RESIDENTIAL ACCESS STREETS - 2' ACP CLASS 'E' or W.
ACP CLASS*
MIN.
6" CRUSHED
SURFACING TOP
COURSE
EDGE OF PAVEMENT, -
EDGE OF CURB do GUTTER,
OR CENTER OF LANE LINE
CRUSHED ROCK, FLOWABLE FILL
OR AS REQUIRED BY ENGINEER
NOTE:
UPON REQUEST OF ENGINEER, NEW ROADWAY PAVEMENT
SECTION MAY BE DESIGNED USING AN APPROVED METHOD FOR TYPICAL LONGPMERAL PATCH AND OVERLAY
DETERMINING PAVEMENT THICKNESS.
FOR FtE»IX PAVSIRN't
Y ADOPTED
CUT or 111�10
XTA� PL�
N Uff nn>t oq/oa Maim- W10
DATE REVISION 8Y
DWG. NAME: H032 SP PAGE: H032
PROPERTY_ LINE
3' -0"
o ! FUTURE
6" BUILDING SEWER PIPE ;;� BUILDING SEINER
W
j � 2 "x 4" STUD MARKING POST PAINTED
\,_TEE WITH 6" SIDE OUTLET 6'X6 "X6` WYE W"TE WITH THE WORD "SEWER" STENCILED
SURFACE CLEANOUT WITH IN 3" HIGH BLACK LETTERS AND #6 WIRE
Ix W CAST IRON RING & COVER WRAPPED AROUND THE STUD AND
(EAST JORDAN IRON WORKS
2975 OR APPROVED EQUAL, EXTENDED TO THE TOP OF THE STUD.
�
a SPECIFY 'SEINER' ON LID,
SEE STD. PLAN 403.1 FOR
6" SIDE SEWER AND BUILDING SEVIE-R INSTALLATION)
ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO MAIN
LINES ARE AS FOLLOWS.
A. VITRIFIED CLAY MAIN - CUT IN A NEW TEE USING FLEXIBLE
COUPLINGS (FERNCO OR APPROVED EQUAL).
B. CONCRETE MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR
APPROVED EQUAL).
C. PVC MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR APPROVED
EQUAL) OR CUT IN A NEW TEE USING RIGID COUPLINGS.
D. DUCTILE IRON MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR
APPROVED EQUAL)
E MANHOLE CONNECTION - ALL CONNEC'i10NS TO MANHOLES SHALL BE
AT MANUFACTURED KNOCK -OUTS OR THE
STRUCTURE SHALL BE CORE- DRILLED.
60" ALLOWABLE MAX.
FOR CAST IRON PIPE
OR DUCTILE IRON PIPE.
1: 3:5 MIX �h �GL GAG
CONCRETE
BLOCKING 7a,4P��N ti5 �►��, 0
G� 2% MIN SLOPE
HORIZONTAL
"- 6" SIDE OUTLET TEE
SEWER
6" MIN. MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT MAIN OVER 25
ELEVATION
SEWER MAIN
NOTE:
UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE
A MINIMUM 2.5' COVER AT PROPERTY LINE OR 3 -5' LOWER
THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
�zr %'� STANDARD SIDE SEWER STD. PLAN - 40d•1
PUBLIC WORKS INSTALLATION
DEPARTMENT
(SEWER MAIN TO PROPERTY LINE) SEPTEMBER 2011
RECOMMENDED
FOR APPROVAL
� ATE
BY DATE
BY DATE
BY DATE
BY DATE
381702
cD 5.?.gi�o'Z
S1E1VJ11jR
'A'
'B'
'C'
'D'
'E'
48" MH
48"
6" MIN.
5 "MIN
24' MIN.
21" I.D.
54" MH
54
8" MIN.
5.5' MIN.
24" MIN.
24" I.D.
60" MH
60"
1 8" MIN.
6" MIN.
1 42" MIN.
30" I.D.
NOTES:
1. STEPS TO BE POLYPROPYLENE SAFETY STEPS.
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED.
3. CASTING SHALL BE PER STD. PLAN 401.
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE.
5. ALL JOINTS BETWEEN THE CONE, RISER RINGS, BRICKS AND CASTING SHALL BE GROUTED.
6. ADJUSTMENT OF THE CASTING TO GRADE SHALL BE ACCOMPLISHED VATH A COMBINATION OF
ADJUSTMENT RINGS. BRICKS AND MORTAR Q&, BRICKS SHALL BE STAGGERED TO CREATE A RUNNING
BOND OR 1/2 BOND. THE USE OF SHIMS IS PROHIBITED.
7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING,
COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR
APPROVED EQUAL. COLOR OF COATING SHALL BE WHITE.
8. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443.
9. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 OF THE INSIDE DIAMETER OF THE LARGEST PIPE.
10. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR
APPROVED EQUAL.
11. IN UNIMPROVED AREAS. MANHOLES SHALL EXTEND A MINIMUM OF 6" AND A MAXIMUM OF 12"
ABOVE FINISHED GRADE OR MUST HAVE A MINIMUM 2' DIAMETER CONCRETE RINGS POURED AT GRADE.
IN PAVED AREAS, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
�~ �0 SM. PSM - 400.1
PUBLIC 1�ORKS STANDARD SANITARY MANHOLE
DEPARTMENT STANDARD
2011
LANE LINE
MARKING 7`-8n on
STANDARD VEHICLE WHEEL PATH
-- 3'
MIN.
2" CLASS 'B'
2" SAWCUT AND REMOVE
OR GRIND, SEAL WITH
AR4000W
4.5' 3' -
MIN. > MIN.
I I-\ \ \ I I N
I
2.5'
MIN.
*MINIMUM ACP CLASS 'E' or 'B' SHALL BE:
PRINCIPAL /MINOR /COLLECTOR ARTERIAL STREETS A INDUSTRIAL
ACCESS STREETS - 6' ACP CLASS 'E' or 'B'.
RESIDENTIAL ACCESS STREETS - 2' ACP CLASS 'E' or W.
ACP CLASS*
MIN.
6" CRUSHED
SURFACING TOP
COURSE
EDGE OF PAVEMENT, -
EDGE OF CURB do GUTTER,
OR CENTER OF LANE LINE
CRUSHED ROCK, FLOWABLE FILL
OR AS REQUIRED BY ENGINEER
NOTE:
UPON REQUEST OF ENGINEER, NEW ROADWAY PAVEMENT
SECTION MAY BE DESIGNED USING AN APPROVED METHOD FOR TYPICAL LONGPMERAL PATCH AND OVERLAY
DETERMINING PAVEMENT THICKNESS.
FOR FtE»IX PAVSIRN't
Y ADOPTED
CUT or 111�10
XTA� PL�
N Uff nn>t oq/oa Maim- W10
DATE REVISION 8Y
DWG. NAME: H032 SP PAGE: H032
PROPERTY_ LINE
3' -0"
o ! FUTURE
6" BUILDING SEWER PIPE ;;� BUILDING SEINER
W
j � 2 "x 4" STUD MARKING POST PAINTED
\,_TEE WITH 6" SIDE OUTLET 6'X6 "X6` WYE W"TE WITH THE WORD "SEWER" STENCILED
SURFACE CLEANOUT WITH IN 3" HIGH BLACK LETTERS AND #6 WIRE
Ix W CAST IRON RING & COVER WRAPPED AROUND THE STUD AND
(EAST JORDAN IRON WORKS
2975 OR APPROVED EQUAL, EXTENDED TO THE TOP OF THE STUD.
�
a SPECIFY 'SEINER' ON LID,
SEE STD. PLAN 403.1 FOR
6" SIDE SEWER AND BUILDING SEVIE-R INSTALLATION)
ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO MAIN
LINES ARE AS FOLLOWS.
A. VITRIFIED CLAY MAIN - CUT IN A NEW TEE USING FLEXIBLE
COUPLINGS (FERNCO OR APPROVED EQUAL).
B. CONCRETE MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR
APPROVED EQUAL).
C. PVC MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR APPROVED
EQUAL) OR CUT IN A NEW TEE USING RIGID COUPLINGS.
D. DUCTILE IRON MAIN - CORE - DRILLED WITH A ROMAC SADDLE (OR
APPROVED EQUAL)
E MANHOLE CONNECTION - ALL CONNEC'i10NS TO MANHOLES SHALL BE
AT MANUFACTURED KNOCK -OUTS OR THE
STRUCTURE SHALL BE CORE- DRILLED.
60" ALLOWABLE MAX.
FOR CAST IRON PIPE
OR DUCTILE IRON PIPE.
1: 3:5 MIX �h �GL GAG
CONCRETE
BLOCKING 7a,4P��N ti5 �►��, 0
G� 2% MIN SLOPE
HORIZONTAL
"- 6" SIDE OUTLET TEE
SEWER
6" MIN. MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT MAIN OVER 25
ELEVATION
SEWER MAIN
NOTE:
UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE
A MINIMUM 2.5' COVER AT PROPERTY LINE OR 3 -5' LOWER
THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
�zr %'� STANDARD SIDE SEWER STD. PLAN - 40d•1
PUBLIC WORKS INSTALLATION
DEPARTMENT
(SEWER MAIN TO PROPERTY LINE) SEPTEMBER 2011
RECOMMENDED
FOR APPROVAL
� ATE
BY DATE
BY DATE
BY DATE
BY DATE
381702
cD 5.?.gi�o'Z
S1E1VJ11jR
c
C'
f'
T'
0
n
D
Z
Z
C
ic
M
c
c
_
C :J N
'
N ^ Z
Z
z
f.
C
7
o�
M
c
C'
f'
T'
0
n
D
Z
Z
C
ic
M
t
o
t D
z
' � X
c
_
C :J N
'
N ^ Z
Z_
z
f.
t
o
t D
z