HomeMy WebLinkAboutR-3816022 0 H O Q J W 0 H 2 W 2 H Construction Sequence: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF RENTON, THE APPLICANT AND THE APPLICANTS CONSTRUCTION REPRESENTATIVE. 2. VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES. CONTACT ALL UTILITY COMPANIES THAT MAY BE EFFECTED BY THE PROPOSED CONSTRUCTION. THE ONE CALL NUMBER IS 1 -800- 424 -5555. 3. MAINTAIN ALL EXISTING UTILITY SERVICES DURING CONSTRUCTION. 4. VERIFY GRADES PRIOR TO CONSTRUCTION. FLAG CLEARING LIMITS. 5. INSTALL STABILIZED CONSTRUCTION ENTRANCE. 6. INSTALL FILTER FABRIC FENCE AS INDICATED ON PLAN. 7. INSTALL OFFSITE CATCH BASIN PROTECTION. 8. CLEAR k GRUB AREAS Of THE SITE TO BE ROUGH GRADED OF FILLED. 9. CLEAN STORM DRAINAGE SYSTEM OF ALL SEDIMENT AND DEBRIS. 10. REMOVE TEMPORARY EROSION CONTROL FACILITIES WHEN SITE IS COMPLETELY STABILIZED. Demolition Notes 1. EXISTING UTILITIES AND UNDERGROUND STRUCTURES SHOWN ON THE PLAN ARE BASED UPON THE BEST AVAILABLE PUBLIC RECORDS AND /OR PRIVATE RECORDS AS SUPPLIED BY THE PROJECT OWNER AND /OR DATA OBTAINED VERBALLY FROM OWNERS OR OFFICIALS ASSOCIATED WITH THE PARTICULAR UTILITY. NEITHER THE OWNER NOR THE ENGINEER GUARANTEE ACCURACY OR COMPLETENESS OF THIS INFORMATION AND ASSUME NO RESPONSIBILITY FOR IMPROPER LOCATIONS ON THE CONSTRUCTION PLANS. OTHER UNDERGROUND FACILITIES NOT SHOWN ON THE DRAWINGS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. ALL INVERT ELEVATIONS SHOWN ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 2. IF CHANGED CONDITIONS ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY OF (1) PREEXISTING SUBSURFACE CONDITIONS DIFFERING FROM THOSE INDICATED IN THE PLANS, OR (2) PREEXISTING UNKNOWN SUBSURFACE CONDITIONS, OR AN UNUSUAL NATURE, DIFFERING MATERIALLY FROM THOSE ORIGINALLY ENCOUNTERED AND GENERALLY RECOGNIZED AS INHERENT IN WORK OF THE CHARACTER PROVIDED FOR IN THE CONTRACT. THE CONTRACTOR AND OR OWNER SHALL MAKE NO CLAIMS TO THE ENGINEER FOR RECOMPENSATION FOR EXTRA WORK RESULTING FROM CHANGED CONDITIONS UNLESS THE ENGINEER HAS APPROVED THE WORK IN WRITING. 3. CONTRACTOR SHALL CALL THE UTILITIES UNDERGROUND LOCATION CENTER FOR FIELD LOCATION OF ALL UTILITIES AND SHALL NOT BEGIN EXCAVATION UNTIL ALL KNOWN UNDERGROUND FACILITIES IN THE VICINITY OF THE PROPOSED WORK HAVE BEEN LOCATED AND MARKED. IF THE UTILITY IS NOT A SUBSCRIBER OF THE UNDERGROUND LOCATION CENTER THEN THE CONTRACTOR SHALL GIVE NOTICE TO THAT UTILITY. 4. THE CONTRACTOR IS RESPONSIBLE FOR REVIEW OF ALL UTILITY PURVEYOR, AND CITY OR STATE RECORDS RELATIVE TO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR AVOIDING DAMAGE TO THESE FACILITIES AND SHALL RESTORE ALL UTILITIES AT CONTRACTOR'S OWN EXPENSE. 5. VERIFY THAT ALL UTILITY SERVICES TO BE DEMOLISHED HAVE BEEN DISCONNECTED. 6. ERECT BARRIERS, SHORING AND THE LIKE TO PROTECT PERSONNEL, CONSTRUCTION AND VEGETATION TO REMAIN. COMPLY WITH ALL STATE AND LOCAL AGENCY REQUIREMENTS. 7. DO NOT SHUT OFF OR CAP UTILITIES WITHOUT PRIOR NOTICE. COORDINATE WORK WITH LOCAL UTILITY PURVEYORS. 8. MAINTAIN VEHICULAR AND PEDESTRIAN TRAFFIC ROUTES: ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, AND ADJACENT FACILITIES; DO NOT CLOSE OR OBSTRUCT STREETS, SIDEWALKS, OR PASSAGEWAYS WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION; MAINTAIN FIRE ACCESS ALONG ACCESS ROAD AT ALL TIMES; MEET ALL APPLICABLE CODES AND ORDINANCES. 9. PROTECT FROM HARM ANY TREES, OR OTHER OBJECTS SELECTED TO REMAIN. 10. DO NOT DAMAGE EXISTING CONSTRUCTION TO REMAIN. 11. RESTORE ANY IMPROVEMENTS DAMAGED BY THIS WORK TO THEIR ORIGINAL CONDITION, AS ACCEPTABLE TO OWNER. REPAIR ANY DAMAGE TO ADJACENT STRUCTURES, UTILITIES, SITE, AND WORK OF THIS CONTRACT TO REMAIN AT NO ADDITIONAL COST TO OWNER. 12. NO BLASTING ON SITE. DO NOT USE EXPLOSIVES. 13. SPRINKLE DEBRIS AS NECESSARY TO LIMIT DUST TO LOWEST PRACTICABLE LEVEL. DO NOT SPRINKLE TO EXTENT CAUSING FLOODING, CONTAMINATED RUNOFF OR ICING. 14. REMOVE EXISTING ABOVE -GRADE AND BELOW -GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO FACILITATE NEW CONSTRUCTION. CARE SHALL BE TAKEN THAT DAMAGE DOES NOT OCCUR TO EXISTING PAVEMENT WHICH IS TO REMAIN IN PLACE AND THAT ALL PAVEMENT REMOVALS ARE ACCOMPLISHED BY MAKING A NEAT VERTICAL SAW CUT AT THE BOUNDARIES OF THE AREA TO BE REMOVED. 15. REMOVE TREES, GROWTH AND UNDERBRUSH AS REQUIRED FOR NEW CONSTRUCTION AND AS INDICATED. REMOVAL OPERATIONS SHALL BE PERFORMED IN A MANNER TO PROTECT PROPERTY. 16. MAKE CUTS AT CLOSEST PAVING JOINT. 17. THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, SETTING AND MARKING ALL LINE AND LOCATION STAKES, INCLUDING OFFSETS AND GENERAL CONSTRUCTION STAKING. WHEN WORK REQUIRING BE ON SITE. A QUALIFIED LAYOUT ENGINEER, SURVEYOR, OR TECHNICAL SPECIALIST MUST BE ASSIGNED TO THE CONTRACTOR'S CREW CONTROL IS BEING PERFORMED, ALL NECESSARY RELATED EQUIPMENT, SUPPLIES AND INSTRUMENTS SHALL FOR THIS WORK. THIS EQUIPMENT AND PERSONNEL MUST BE AVAILABLE, AT NO ADDITIONAL COST TO OWNER FOR THE PURPOSE OF VERIFYING LAYOUT AND CERTIFYING THE ACCURACY OF WORK ON THE SITE. 18. PROVIDE FOR THE PROTECTION OF PERSONS PASSING AROUND OR THROUGH THE AREA OF DEMOLITION. 19. TRAFFIC: DO NOT OBSTRUCT WALKS OR PUBLIC WAYS WITHOUT THE WRITTEN PERMISSION OF GOVERNING AUTHORITIES AND OF THE OWNER. WHERE ROUTES ARE PERMITTED TO BE CLOSED, PROVIDE ALTERNATE ROUTES IF REQUIRED. 20. THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING ALL BENCHMARKS AND STAKES AND THE REPLACEMENT OF ANY THAT ARE DISPLACED OR MISSING 21. THE REFUSE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED OF BY THE CONTRACTOR IN A MANNER CONSISTENT WITH ALL GOVERNMENT REGULATIONS. IN NO CASE SHALL REFUSE MATERIAL BE LEFT ON THE PROJECT SITE, SHOVED ONTO ABUTTING PRIVATE PROPERTIES, OR BE BURIED IN EMBANKMENTS OR TRENCHES ON THE PROJECT SITE. DEBRIS SHALL NOT BE DEPOSITED IN ANY STREAM OR BODY OF WATER, WETLAND, OR IN ANY STREET OR ALLEY, OR UPON ANY PRIVATE PROPERTY EXCEPT BY WRITTEN CONSENT OF THE PRIVATE PROPERTY OWNER. MAINTAIN HAULING ROUTES CLEAN AND FREE OF ANY DEBRIS RESULTING FROM DEMOLITION WORK ON THIS PROJECT. Erosion Control Notes 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER. 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. Surface Water Standard Plan Notes 1. THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY. 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE - CONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF RENTON PLAN REVIEW SECTION AND THE APPLICANT. 3. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RENTON MUNICIPAL CODE (RMC), THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. IT SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THIS PLANS. ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY. 4. APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL. ETC.)THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE IN WITH THE CITY. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 5. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6. GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED, UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY THE CITY OF RENTON. 7. IT SHALL BE THE APPLICANT'S /CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK. EASEMENTS REQUIRE CITY REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 8. FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS OF CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE CITY OF RENTON. 9. DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS. 10. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 11. ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 PERCENT DENSITY, STANDARD PROCTOR. 12. OPEN CUTTING OF EXISTING ROADWAYS FOR NON- FRANCHISED UTILITY OR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF RENTON TRENCH RESTORATION STANDARDS. 13. ALL SEDIMENTATION /EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 14. ALL RETENTION /DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS ?C ?, WITH THE EXCEPTION OF PVC PIPE. 16. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER INSIDE AND OUTSIDE. 17. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE SOLID LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION /DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS. ��L PETS COUGHLIN PORTERLUNDEEN 2 A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION��'= Qr '11J'12TH AVE NE SU;TE 50Ci k., 801 SECOND AVENUE -SUITE 900 P: 206/343 -0460 BE �EVUE AA WV 36936 � SEATTLE. WA 98104 F: 206/343 -5691 - �425�6�zwo -- -- SOU T 1-1 1� O 1? T - -- - -- --- ;4z5,��� ANAL �� � /�/ SGCO DGF�LOPMC�T. liC. MuvanmG7 �,O- I 7. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST TROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. 15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. 18. BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES. 19. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL. 20. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT -OF -WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS: 4 - 8 INCH ROCK / 40 - 70% PASSING; 2 - 4 INCH ROCK / 30 - 40% PASSING; AND LESS THAN 2 INCH ROCK / 10 - 20% PASSING. 21. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY UPON COMPLETION. 22. DRAINAGE OUTLETS (STUB -OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB -OUTS SHALL CONFORM TO THE FOLLOWING: A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR IN ENDED USE. EACH OUTLET SHALL HAVE FREE - FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION. B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE -FOOT -HIGH, 2" X 4" STAKE MARKED "STORM" OR "DRAIN ". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE, AND BE SECURED TO THE STAKE. C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL AND, IF NON- METALLIC, THE PIPE SHALL BE PLACED IN A TRENCH WITH A TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION. D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS. E. THE APPLICANT /CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUBOUT CONVEYANCE LINES WITH RESPECT TO OTHER UTILITIES (E.G. POWER, GAS, TELEPHONE, TELEVISION). F. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOME OWNER. G. STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING FOUNDATIONS, EXCEPT FOR SUMP PUMP DISCHARGE LINES USED TO DRAIN CRAWL SPACES, PROVIDED THE SUMP PUMP SYSTEM INCLUDES BACKFLOW PREVENTION OR A CHECK VALVE. 23. ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE EXISTING DUFF LAYER SHALL BE STAGED AND REDISTRIBUTED TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL, OR; AMENDED SOIL SHALL BE ADDED TO MAINTAIN THE MOISTURE CAPACITY. 24. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO CONSTRUCTION PERMIT ISSUANCE. 25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND /OR LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION. 26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK. ANY WORK WITHIN THE TRAVELED RIGHT -OF -WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS 1 -07 -23 TRAFFIC CONTROL SHALL APPLY. 27. PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND AQUIFER PROTECTION REGULATIONS (RMC 4 -3 -050). Approved By: Approved Approved By: General Paving Notes 1. A COPY OF THE APPROVED PLANS SHALL BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY OTHER REQUIRED OR RELATED PERMIT PRIOR TO BEGINNING CONSTUCTION. 2. ALL LOCATIONS OF EXISTING UTILITIES HAVE BEEN ESTABLISHED BY FIELD SURVEY AND AVAILABLE RECORDS AND SHOULD THEREFORE, BE CONSIDERED ONLY APPROXIMATE AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS AND TO DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. 3. ALL ASPHALT CONCRETE WORK IN THE PUBLIC RIGHT -OF -WAY SHALL CONFORM TO THE CITY OF RENTON STANDARDS AND SPECIFICATIONS. 4. ALL ASPHALT CONCRETE WORK ON THE PROJECT SITE SHALL CONFORM TO THE "2000 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION ". 5. ALL ASPHALT CONCRETE PAVEMENT SHALL BE PLACED IN ACCORDANCE WITH WSDOT /APWA SECTION 5 -04 UNLESS OTHERWISE SPECIFICALLY NOTED. 6. PROOF ROLL AND REMOVE ANY SOFT SPOTS. REPLACE REMOVED MATERIAL WITH STRUCTURAL FILL PER THE GEOTECHNICAL ENGINEER. CONTRACTOR SHALL TEST AND VERIFY SUBGRADE MEETS COMPACTION REQUIREMENTS PRIOR TO PAVING. 7. STERILIZE ALL AREAS TO BE PAVED WITH A SOIL STERILANT, PRAMITOL 25E OR EQUAL, AS RECOMMENDED BY THE MANUFACTURER. 8. AGGREGATE SHALL BE TYPE CLASS B, 1/2 INCH MAXIMUM MEDIUM GRADING, CONFORMING TO SECTION 9 -3.8 OF THE WSDOT -APWA. ASPHALT BINDER SHALL BE PAVING ASPHALT, GRADE AR -4000, AND SHALL COMPLY WITH SECTION 9 -02.1 OF WSDOT -APWA. ASPHALT CONCRETE MIXING AND PROPORTIONING SHALL COMPLY WITH SECTION 9 -03.8 OF THE WSDOT -APWA. 9. CRUSHED SURFACING SHALL BE PLACE IN ACCORDANCE WITH WSDOT- APWA SECTION 4 -04 AND SHALL MEET THE REQUIREMENTS OF WSDOT -APWA 9- 03.9(3). 10. CONTRACTOR SHALL PREPARE THE EXISTING ASPHALT PAVEMENT SURFACE TO BE OVERLAID IN ACCORDANCE WITH 5-04.3(5)A- 11. SAWCUT EXISTING ASPHALT FULL DEPTH WHERE NEW PAVEMENT ABUTS EXISTING. 12. APPLY TACK COAT TO ALL EXISTING PAVEMENT SURFACES TO BE OVERLAID OR ABUTTED WITH NEW ASPHALT PAVEMENT. TACK COAT SHALL NOT BE APPLIED IN TEMPERATURES BELOW 50 DEGREES F. 13. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING FEATURES TO REMAIN. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING OR REPLACING TO THE OWNER'S SATISFACTION ANY AREA THAT DEFACEMENT OR DAMAGE HAS OCCURRED AT NO COST TO THE OWNER. 14. CONTRACTOR SHALL AVOID UNNECESSARY DISTURBANCE TO STEEP SLOPES AS TO NOT INCREASE THE POTENTIAL FOR INSTABILITY AND EROSION. 15. CONTRACTOR SHALL NOT PAVE IN RAIN, WHEN SUBGRADE IS WET OR FROZEN, AND WHEN TEMPERATURES ARE BELOW 40 DEGREES F. 16. CONTRACTOR SHALL PROTECT ALL FINISHED SURFACES. ALLOW NO HEAVY OBJECTS TO BE MOVED OVER FINISHED SURFACES. CONTRACTOR SHALL REPAIR AT NO COST TO THE OWNER ANY RUTS, AREAS SHOWING SETTLEMENT, AND ANY OBSTRUCTIONS TO POSITIVE DRAINAGE. CONTRACTOR SHALL NOT ALLOW VEHICULAR TRAFFIC ON ASPHALT PAVEMENT UNTIL IT IS COOLED AND HARDENED AND IN NO CASE SOONER THAN 6 HOURS AFTER PLACING. 17. CONTRACTOR WORK CORRECTIONS INCLUDE AGGREGATE SEPARATION, SOFT SPOTS, AND EXCESS POROSITY. CONTRACTOR SHALL REPAIR RACKS, UNSATISFACTORY ELEVATION IRREGULARITIES IMMEDIATELY UPON NOTIFICATION, AND REPLACE ANY PAVING NOT DRAINING PROPERLY AT THE CONTRACTORS SOLE EXPENSE. 18. LEAVE PREMISES CLEAN AND FREE OF RESIDUE OF WORK FROM PAVING. Date: Date: Date: Date: i z 381602 sc..q_E: HORIZONTAL- ;9/1991 ,► THE HOTEL AT SOUTHPORT AS NOTED •. ,.� CITY OF RENTON WASHINGTON ML RENTON ONE INCH DATU M AT FULL SCALF Planning /Building /Public Works Dept. GENERAL NOTES IF NOT ONE INCH SCALE ACCORDINGLY DATE 12/22/2014 FIELDBOW: PAGE: C001 OF: PERMIT CORRECTIONS #1 BSB 2/6/15 S"RVE''m: 7 z Z PERMIT CORRECTIONS #2 BSB 3/12/15 t or �. 0 DESIGNED: PERMIT CORRECTIONS #3 BSB 4/3/15 m BSB W tan c DRAWN: LPL CNN CHECKED: NO. REVISION BY DATE A P P R JNP APPROVED: Approved By: Approved Approved By: General Paving Notes 1. A COPY OF THE APPROVED PLANS SHALL BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY OTHER REQUIRED OR RELATED PERMIT PRIOR TO BEGINNING CONSTUCTION. 2. ALL LOCATIONS OF EXISTING UTILITIES HAVE BEEN ESTABLISHED BY FIELD SURVEY AND AVAILABLE RECORDS AND SHOULD THEREFORE, BE CONSIDERED ONLY APPROXIMATE AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS AND TO DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. 3. ALL ASPHALT CONCRETE WORK IN THE PUBLIC RIGHT -OF -WAY SHALL CONFORM TO THE CITY OF RENTON STANDARDS AND SPECIFICATIONS. 4. ALL ASPHALT CONCRETE WORK ON THE PROJECT SITE SHALL CONFORM TO THE "2000 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION ". 5. ALL ASPHALT CONCRETE PAVEMENT SHALL BE PLACED IN ACCORDANCE WITH WSDOT /APWA SECTION 5 -04 UNLESS OTHERWISE SPECIFICALLY NOTED. 6. PROOF ROLL AND REMOVE ANY SOFT SPOTS. REPLACE REMOVED MATERIAL WITH STRUCTURAL FILL PER THE GEOTECHNICAL ENGINEER. CONTRACTOR SHALL TEST AND VERIFY SUBGRADE MEETS COMPACTION REQUIREMENTS PRIOR TO PAVING. 7. STERILIZE ALL AREAS TO BE PAVED WITH A SOIL STERILANT, PRAMITOL 25E OR EQUAL, AS RECOMMENDED BY THE MANUFACTURER. 8. AGGREGATE SHALL BE TYPE CLASS B, 1/2 INCH MAXIMUM MEDIUM GRADING, CONFORMING TO SECTION 9 -3.8 OF THE WSDOT -APWA. ASPHALT BINDER SHALL BE PAVING ASPHALT, GRADE AR -4000, AND SHALL COMPLY WITH SECTION 9 -02.1 OF WSDOT -APWA. ASPHALT CONCRETE MIXING AND PROPORTIONING SHALL COMPLY WITH SECTION 9 -03.8 OF THE WSDOT -APWA. 9. CRUSHED SURFACING SHALL BE PLACE IN ACCORDANCE WITH WSDOT- APWA SECTION 4 -04 AND SHALL MEET THE REQUIREMENTS OF WSDOT -APWA 9- 03.9(3). 10. CONTRACTOR SHALL PREPARE THE EXISTING ASPHALT PAVEMENT SURFACE TO BE OVERLAID IN ACCORDANCE WITH 5-04.3(5)A- 11. SAWCUT EXISTING ASPHALT FULL DEPTH WHERE NEW PAVEMENT ABUTS EXISTING. 12. APPLY TACK COAT TO ALL EXISTING PAVEMENT SURFACES TO BE OVERLAID OR ABUTTED WITH NEW ASPHALT PAVEMENT. TACK COAT SHALL NOT BE APPLIED IN TEMPERATURES BELOW 50 DEGREES F. 13. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING FEATURES TO REMAIN. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING OR REPLACING TO THE OWNER'S SATISFACTION ANY AREA THAT DEFACEMENT OR DAMAGE HAS OCCURRED AT NO COST TO THE OWNER. 14. CONTRACTOR SHALL AVOID UNNECESSARY DISTURBANCE TO STEEP SLOPES AS TO NOT INCREASE THE POTENTIAL FOR INSTABILITY AND EROSION. 15. CONTRACTOR SHALL NOT PAVE IN RAIN, WHEN SUBGRADE IS WET OR FROZEN, AND WHEN TEMPERATURES ARE BELOW 40 DEGREES F. 16. CONTRACTOR SHALL PROTECT ALL FINISHED SURFACES. ALLOW NO HEAVY OBJECTS TO BE MOVED OVER FINISHED SURFACES. CONTRACTOR SHALL REPAIR AT NO COST TO THE OWNER ANY RUTS, AREAS SHOWING SETTLEMENT, AND ANY OBSTRUCTIONS TO POSITIVE DRAINAGE. CONTRACTOR SHALL NOT ALLOW VEHICULAR TRAFFIC ON ASPHALT PAVEMENT UNTIL IT IS COOLED AND HARDENED AND IN NO CASE SOONER THAN 6 HOURS AFTER PLACING. 17. CONTRACTOR WORK CORRECTIONS INCLUDE AGGREGATE SEPARATION, SOFT SPOTS, AND EXCESS POROSITY. CONTRACTOR SHALL REPAIR RACKS, UNSATISFACTORY ELEVATION IRREGULARITIES IMMEDIATELY UPON NOTIFICATION, AND REPLACE ANY PAVING NOT DRAINING PROPERLY AT THE CONTRACTORS SOLE EXPENSE. 18. LEAVE PREMISES CLEAN AND FREE OF RESIDUE OF WORK FROM PAVING. Date: Date: Date: Date: i z 381602 sc..q_E: HORIZONTAL- ;9/1991 ,► THE HOTEL AT SOUTHPORT AS NOTED •. ,.� CITY OF RENTON WASHINGTON ML RENTON ONE INCH DATU M AT FULL SCALF Planning /Building /Public Works Dept. GENERAL NOTES IF NOT ONE INCH SCALE ACCORDINGLY DATE 12/22/2014 FIELDBOW: PAGE: C001 OF: I R J' z I � Z Z > O D Z Z C M M x � O 7 z Z YJ Z C r � t or �. 0 w� 1 r m Z W tan c > CNN I R J' z I � Z Z > O D Z Z C M M D T x �. O ^ t or �. 0 w� 1 r z -- W tan c CNN D T �. O r �