HomeMy WebLinkAboutRES 4255 CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4255
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING RENTON'S
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR 2016—2021.
WHEREAS, the City of Renton has adopted a "Six-Year Transportation Improvement
Program" pursuant to RCW 35.77.010 (Perpetual advanced six-year plans for coordinated
transportation program expenditures), and the plan and program having been amended and
modified from time to time as authorized by law; and
WHEREAS, the City Council, after recommendation of the Public Works Department,
held a public hearing on June 15, 2015, after notice to the public as provided by law for the
purpose of considering adoption, modification, and amendments of the plan and program; and
WHEREAS, at the public hearing held on June 15, 2015, due consideration was given to
the proposed changes and amendments for the purpose of updating the plan and program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES
RESOLVE AS FOLLOWS:
SECTION I. The above findings are true and correct in all respects.
SECTION II. Renton's "Six-Year Transportation Improvement Program" is amended
and modified, as more particularly shown on the attached Exhibits "A" and "B", incorporated
as if fully detailed in this resolution.
SECTION 111. The plan and program, as evidenced by exhibits, shall be and constitute
Renton's "Six-Year Transportation Improvement Program", and shall remain in full force and
effect until further revised, amended, and modified as provided by law.
1
RESOLUTION NO. 4255
SECTION IV. The Administrator of the Public Works Department and the City Clerk are
authorized and directed to file this resolution, together with the exhibits, with the Director of
Highways for the State of Washington and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 15 day of June , 2015.
146,r
Jason A Seth, Cit Clerk
APPROVED BY THE MAYOR this 15 day of June ' 2015.
Denis Law, Mayor
Approved as to form:
ireLawrence J. Warren, City Attorney ,
RES.1672:4/29/15:scr
2
RESOLUTION 4255
r r
r t
' 36
r
r j
1 � tit i
35
13 12
33
t
7
!�i t
a 9_��
13.81 17 5
18 _I
a
t
7 3 �' t
15
9
f
19
_ r
34
r ,
1 ,
4
10 `
1 s
i
i
1 1
I `
t r
! f
f
r
t '
1
d �
City of Renton - 2016-2021 TIP
RESOLUTION 4255 EXHIBIT `B'
City of Renton
2016 — 2021 Amended Transportation Improvement Program
Map Index
TIP No. Project Title
1 Street Overlay Program
2 Arterial Rehabilitation Program
3 Logan Ave N Improvements
4 SW 27th St/Strander Blvd Connection
5 NE 3`d/NE 4th Corridor
6 Duvall Ave NE—NE 7th to Sunset Blvd NE
7 Rainier Ave S Phase 4 - S 3rd Street to NW 3`d Place
8 Main Ave S/Downtown Circulation Project
9 Park Ave North Extension
10 116th Ave SE/Edmonds Ave SE Improvements
11 Carr Road Improvements
12 NE Sunset Blvd(SR 900) Corridor Improvements
13 Sunset Area Green Connections
14 Oakesdale Ave SW/Monster Road SW/68th Ave S
15 South 7th Street—Rainier Ave S to Talbot Road S
16 S Grady Way—Talbot Rd S to Rainier Ave S
17 Houser Way N—N 8th St to S Lake Washington Blvd
18 Lake Washington Loop Trail
19 Lake to Sound(L2S) Trail
20 Walkway Program
21 Sidewalk Rehabilitation and Replacement
22 Maple Valley Highway—Half Bridge Attenuator
23 Bridge Inspection and Repair
24 Roadway Safety and Guardrail Program
25 Intersection Safety and Mobility
26 Traffic Safety Program
27 Preservation of Traffic Operation Devices Program
28 Intelligent Transportation Systems (ITS) Program
29 Barrier Free Transition Plan Implementation
30 Project Development/Predesign
31 Arterial Circulation Program
32 1% for the Arts Program
33 Lake Washington Boulevard—Park Avenue N to Coulon Park
34 Lind Avenue—SW 16th to SW 43`d
35 Sunset Lane/NE 10th St Roadway Improvements
36 NE 31St St Bridge Replacement
37 N 27th PI Culvert Scour Repair
38 Rainier Ave N Corridor Improvements—Phase 5
2 - 2