Loading...
HomeMy WebLinkAboutRES 4255 CITY OF RENTON, WASHINGTON RESOLUTION NO. 4255 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING RENTON'S SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR 2016—2021. WHEREAS, the City of Renton has adopted a "Six-Year Transportation Improvement Program" pursuant to RCW 35.77.010 (Perpetual advanced six-year plans for coordinated transportation program expenditures), and the plan and program having been amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of the Public Works Department, held a public hearing on June 15, 2015, after notice to the public as provided by law for the purpose of considering adoption, modification, and amendments of the plan and program; and WHEREAS, at the public hearing held on June 15, 2015, due consideration was given to the proposed changes and amendments for the purpose of updating the plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DOES RESOLVE AS FOLLOWS: SECTION I. The above findings are true and correct in all respects. SECTION II. Renton's "Six-Year Transportation Improvement Program" is amended and modified, as more particularly shown on the attached Exhibits "A" and "B", incorporated as if fully detailed in this resolution. SECTION 111. The plan and program, as evidenced by exhibits, shall be and constitute Renton's "Six-Year Transportation Improvement Program", and shall remain in full force and effect until further revised, amended, and modified as provided by law. 1 RESOLUTION NO. 4255 SECTION IV. The Administrator of the Public Works Department and the City Clerk are authorized and directed to file this resolution, together with the exhibits, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 15 day of June , 2015. 146,r Jason A Seth, Cit Clerk APPROVED BY THE MAYOR this 15 day of June ' 2015. Denis Law, Mayor Approved as to form: ireLawrence J. Warren, City Attorney , RES.1672:4/29/15:scr 2 RESOLUTION 4255 r r r t ' 36 r r j 1 � tit i 35 13 12 33 t 7 !�i t a 9_�� 13.81 17 5 18 _I a t 7 3 �' t 15 9 f 19 _ r 34 r , 1 , 4 10 ` 1 s i i 1 1 I ` t r ! f f r t ' 1 d � City of Renton - 2016-2021 TIP RESOLUTION 4255 EXHIBIT `B' City of Renton 2016 — 2021 Amended Transportation Improvement Program Map Index TIP No. Project Title 1 Street Overlay Program 2 Arterial Rehabilitation Program 3 Logan Ave N Improvements 4 SW 27th St/Strander Blvd Connection 5 NE 3`d/NE 4th Corridor 6 Duvall Ave NE—NE 7th to Sunset Blvd NE 7 Rainier Ave S Phase 4 - S 3rd Street to NW 3`d Place 8 Main Ave S/Downtown Circulation Project 9 Park Ave North Extension 10 116th Ave SE/Edmonds Ave SE Improvements 11 Carr Road Improvements 12 NE Sunset Blvd(SR 900) Corridor Improvements 13 Sunset Area Green Connections 14 Oakesdale Ave SW/Monster Road SW/68th Ave S 15 South 7th Street—Rainier Ave S to Talbot Road S 16 S Grady Way—Talbot Rd S to Rainier Ave S 17 Houser Way N—N 8th St to S Lake Washington Blvd 18 Lake Washington Loop Trail 19 Lake to Sound(L2S) Trail 20 Walkway Program 21 Sidewalk Rehabilitation and Replacement 22 Maple Valley Highway—Half Bridge Attenuator 23 Bridge Inspection and Repair 24 Roadway Safety and Guardrail Program 25 Intersection Safety and Mobility 26 Traffic Safety Program 27 Preservation of Traffic Operation Devices Program 28 Intelligent Transportation Systems (ITS) Program 29 Barrier Free Transition Plan Implementation 30 Project Development/Predesign 31 Arterial Circulation Program 32 1% for the Arts Program 33 Lake Washington Boulevard—Park Avenue N to Coulon Park 34 Lind Avenue—SW 16th to SW 43`d 35 Sunset Lane/NE 10th St Roadway Improvements 36 NE 31St St Bridge Replacement 37 N 27th PI Culvert Scour Repair 38 Rainier Ave N Corridor Improvements—Phase 5 2 - 2