Loading...
HomeMy WebLinkAboutS-375103N co Ir— Iv— CD TCD 0 T !e Y N 0"L SSMH 1 SHALLOW MH -54" 0 Q /RIM=423.1 0 MINIMUM SLOPE=2.00%, J z IE=418.34, 8"(OUT) a, w W I DTH z IE=418.44, 8"(1N) z VARIES I J �z Q Iz 5 Ld (� J , _ MIN.:.. FF ELEV=42IrQO - Iw V) MIN. 0 Q I w O + 0 MIN. FF ELEV=424.50 + v� 8 SEWER MAIN I SEWER SECTION W/IN EASEMENT 0 ON PARCEL #032305-9136 STA. 0+ 17 ( �w w Q II II w Q V) V) w I U r !e Y N 0"L SSMH 1 SHALLOW MH -54" 0 STUBS SHALL BE PVC PLACED /RIM=423.1 0 MINIMUM SLOPE=2.00%, MIN. FF ELEV=455.00 TYPICAL. IE=418.34, 8"(OUT) I o0 :W 00 IE=418.44, 8"(1N) Al" +0) �z co ELEV=444.00 y� m x} MIN.:.. FF ELEV=42IrQO - FF ELEV=450.00 MIN. FF ELEV=434.x0 D O + 0 MIN. FF ELEV=424.50 + v� CO -0 I C) 0 O N STA. 0+ 17 ( �w It 'll Q II II IE=419.50 Q V) V) w I XXX r f a i L U # r , r -i-a. a. ae- ma — n v+t_r�. .S EFTS E POLYPROPYLENE AFE+:1Y STEF�S: 2� STEPS ARE TIO BE N 'LACE BEFORE MANHOLE SEIC-11ONS ARE INSTALLED, CASTING TO SE PERRAW'N , MANHOLE SECTIONS TO BE E REINFORCED PRECAST CONCRETE, 5. OPENING SHOULD BE ON DOWNSTREAM 'SIDF_, . ALL jOI TS SHALL BE GROUTED. SANITARY SEVIER MANHOLES LES HALL., HAME, AI,.., `NTE'R10 SURFACES, ES, INCI,UDI'v CHANNELING, COATED (SEALED) WITH, A HIGH SOLID'S URETHANE COATING, WASSER ---A SHIf':.P� OR APPROV 0) .QUAL; COLOR QF COATING SAL-,, BE H� TF. 8 RUBBER GAS B ISD JOINTS SISAL{. BE I CONFORMANCE T ASTt.I , Z' CHANNEL HES IIT % A:LL BE A 1 INIMUIM (-W` 3/4 THE INSIDE DIAMETER OF THE LARGES"' PIPE. 110. CONNECTIONS O MANHOLL SHALL BE MADS. USING GPK ADAPTOR, I DR--N--SEAL BOOTS OR APPROVED E II,}AI.,_ Rlu"131d WORKS AN TARY MANHOLE ----- MARCH 20,08 CALL 811 BEFORE YOU DIG! OFFE ENGINEERS 13932 SOUTHEAST 159TH PLACE RENTON, WASHINGTON 98058 PHONE: 425-260-3412 CONTACT: DARRELL OFFE, P.E. .r.w _ � vviv..i avv i iviv NOTE: ALL TRENCH RESTORATION SHALL BE PER CURRENT CITY OF RENTON STREET OVERLAY AND TRENCH RESTORATION DETAIL EX. SSMH RIM=423.89 IE=417.24, 8" OUT) IE=417.34, 8" IN)—NEW UTILITY CONFLICT NOTE: PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. SANITARY SIDE 0 STUBS SHALL BE PVC PLACED AT MINIMUM SLOPE=2.00%, MIN. FF ELEV=455.00 TYPICAL. I I o0 :W 00 O +0) �z MIN. FF I ELEV=444.00 y� m x} _ft FF ELEV=450.00 Cn D O + 0 D ( �w � II I 'Poll v) Ld f a i L U # r , r -i-a. a. ae- ma — n v+t_r�. .S EFTS E POLYPROPYLENE AFE+:1Y STEF�S: 2� STEPS ARE TIO BE N 'LACE BEFORE MANHOLE SEIC-11ONS ARE INSTALLED, CASTING TO SE PERRAW'N , MANHOLE SECTIONS TO BE E REINFORCED PRECAST CONCRETE, 5. OPENING SHOULD BE ON DOWNSTREAM 'SIDF_, . ALL jOI TS SHALL BE GROUTED. SANITARY SEVIER MANHOLES LES HALL., HAME, AI,.., `NTE'R10 SURFACES, ES, INCI,UDI'v CHANNELING, COATED (SEALED) WITH, A HIGH SOLID'S URETHANE COATING, WASSER ---A SHIf':.P� OR APPROV 0) .QUAL; COLOR QF COATING SAL-,, BE H� TF. 8 RUBBER GAS B ISD JOINTS SISAL{. BE I CONFORMANCE T ASTt.I , Z' CHANNEL HES IIT % A:LL BE A 1 INIMUIM (-W` 3/4 THE INSIDE DIAMETER OF THE LARGES"' PIPE. 110. CONNECTIONS O MANHOLL SHALL BE MADS. USING GPK ADAPTOR, I DR--N--SEAL BOOTS OR APPROVED E II,}AI.,_ Rlu"131d WORKS AN TARY MANHOLE ----- MARCH 20,08 CALL 811 BEFORE YOU DIG! OFFE ENGINEERS 13932 SOUTHEAST 159TH PLACE RENTON, WASHINGTON 98058 PHONE: 425-260-3412 CONTACT: DARRELL OFFE, P.E. .r.w _ � vviv..i avv i iviv NOTE: ALL TRENCH RESTORATION SHALL BE PER CURRENT CITY OF RENTON STREET OVERLAY AND TRENCH RESTORATION DETAIL EX. SSMH RIM=423.89 IE=417.24, 8" OUT) IE=417.34, 8" IN)—NEW UTILITY CONFLICT NOTE: PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. SHALLOW SANITARY SEWER MANHOLES PER STANDARD PLAN #400.2 NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND UTILIITES PRI❑R TO COMMENCING CONSTRUCTION, NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON, THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION, CALL BEFORE YOU DIG: 811 EXTEND EXISTING 8" SEWER RELOCATING SSCO TO BEHIND FUTUR ALL SANITARY SIDE 0 STUBS SHALL BE PVC PLACED AT MINIMUM SLOPE=2.00%, MIN. FF ELEV=455.00 TYPICAL. o CD I o0 :W 00 O +0) �z r� o� y� m m m Cn SHALLOW SANITARY SEWER MANHOLES PER STANDARD PLAN #400.2 NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND UTILIITES PRI❑R TO COMMENCING CONSTRUCTION, NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON, THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION, CALL BEFORE YOU DIG: 811 EXTEND EXISTING 8" SEWER RELOCATING SSCO TO BEHIND FUTUR ALL SANITARY SIDE SEWER STUBS SHALL BE PVC PLACED AT MINIMUM SLOPE=2.00%, T TYPICAL. o CD n- :W �CD GRAPHIC SCALE 0 15 30 60 1 inch = 30 feet 5-315 103 L - p a °opo°Op° °°•° �ViJH/, 0. 0 SUR4E M: JAG. HANSEN SURVEYING SCALE °�� �° ����� MAY CREEK COURT SHORT PLAT 05/20/2015 �k, C ° VERTICAL: NAw 98$ �' �oy�,� CITY 0 F� o'0 DESIGNED: ° o D.L. OFFE, P.E. VINEYARDS CONSTRUCTION, LLC PAGE. ° ° DRAWN: _ P E N T O N ', ° ,� 2,46fl O ° D. L. OFFE, P.E. ONE INCH DATUM SEWER PLAN & PROFILE DRAWW NO. ° ° CHECKED: ��F°•�/STER�'•°�,� AT FULL SCALE Planning/Building/Public Works Dept. SONE INICH S/ONAL°°� NO. REVISION BY D P APPROVED: Y 2530 DUVALL AVENUE NE 05/20/2015 ATE A PR SHM` 7 OF- 12 m G b = y O �m Wm T o CD n- :W �CD O �W �z r� m y� m m m Cn D O D � D Cn y D �m Wm T o CD :W �CD O �W 3D r� y� m Cn D T O O 3D m n° D D � D C