HomeMy WebLinkAboutR-382918Ln
C)
LJ_J
r1000
U)
Of
n
0
C)--+-
00
0 %-
C:
C) E
0
.3:
E-4 <
0
LLJ
:3 CL
n
(7) •C)
:3 E
M
E
0)N
.C:
0
0 -
CD
<
Z
"o
>N
0
X
UZ Zo
Q
Z Z
_J 0 y
UJ _J
Z DI
0 0 UJ
V)
X
V)
is UJ
M Z
UJ W
Z !e
CL
D a -
V) <
[if
n
n
0 Li
U
V)
<
n
<
C:)
M
Ln
O
C14
NO -
CN
LID
6
E
W
0
_0
6
1 0
(A
(0
LO
>
C'4 LIJ
rn ry
C
(V
.S
01
Ln
CN
U)
CD
0
C:)
(N
Ir -
0
<
Z
291/4"
BOLT -DOWN HOLE (TYP.)
- 5/8" - 11 NC, SEE
DETAIL & NOTE 2
0
TOP
SECTION
RECESSED ALLEN
HEAD CAP SCREW
7l8" 1/81, 5/8" - 11 NC x 2"
7-
GRATE
ICV ef•
-
FRAME -
2 1/2"
SECTION
BOLT -DOWN DETAIL
DETAIL SEE NOTE 2
PUBLIC WORKS RECTANGULAR FRAME STD. PIAN 204.00
+
DEPARTMENT
MARCH 2008
- - --- ------
rr L
O.D. O.D.� compaction
<
limits of pipe (see note 4)
3` max. Tma
X. limit of pipe zone
bedding k
material
------ for flexible C�
pipe (see I F
note
fn O.D.
Q.15 O.D. min.
limits of pipe IF
compaction 0.65 O.D. min.
foundation
level
gravel backfill gravel backfill for
for pipe bedding foundations when specified
A = 4" min. 27" I.D. and under
6" min., over 27" I.D.
A. Metal and Concrete Pipe
c,
11- This frame is designed to accommodate 20" x 24" grates or
covers
2. Provide two holes in the frame that are vertically aligned with t
he grate or cover slots. Tap each hole to accept
a 5/8" - 11 NC x 2" alien head cap screw.
Location of bolt down holes varies among different
manufacturers.
3. Refer to Standard Specification 9-05.15(2) for additional
requirements.
ISOMETRIC VIEW
I d span 6 1.4 span span b 4111 ........... 3' max
3' max ! �J' max
Flexible Pipe NOTES:
Min. dist.
between
barrels
0
V 011
1. Provide uniform support under barrels.
2. Hand tamp under haunches.
0" to 96"
diam. 0 2
102" to 180"
YZ
pipe - arch
metal only
(span)
W
12"
0
span / 3
0
Z
48"
_1
LI
- 0.15 rise min.
4. See "Excavation and Preparation of Trench" in sanitary
Li
LLJ
112" MAX.
UJ
(n
Ln
C)
LJ_J
r1000
U)
Of
n
0
C)--+-
00
0 %-
C:
C) E
0
.3:
E-4 <
0
LLJ
:3 CL
n
(7) •C)
:3 E
M
E
0)N
.C:
0
0 -
CD
<
Z
"o
>N
0
X
UZ Zo
Q
Z Z
_J 0 y
UJ _J
Z DI
0 0 UJ
V)
X
V)
is UJ
M Z
UJ W
Z !e
CL
D a -
V) <
[if
n
n
0 Li
U
V)
<
n
<
C:)
M
Ln
O
C14
NO -
CN
LID
6
E
W
0
_0
6
1 0
(A
(0
LO
>
C'4 LIJ
rn ry
C
(V
.S
01
Ln
CN
U)
CD
0
C:)
(N
Ir -
0
<
Z
291/4"
BOLT -DOWN HOLE (TYP.)
- 5/8" - 11 NC, SEE
DETAIL & NOTE 2
0
TOP
SECTION
RECESSED ALLEN
HEAD CAP SCREW
7l8" 1/81, 5/8" - 11 NC x 2"
7-
GRATE
ICV ef•
-
FRAME -
2 1/2"
SECTION
BOLT -DOWN DETAIL
DETAIL SEE NOTE 2
PUBLIC WORKS RECTANGULAR FRAME STD. PIAN 204.00
+
DEPARTMENT
MARCH 2008
- - --- ------
rr L
O.D. O.D.� compaction
<
limits of pipe (see note 4)
3` max. Tma
X. limit of pipe zone
bedding k
material
------ for flexible C�
pipe (see I F
note
fn O.D.
Q.15 O.D. min.
limits of pipe IF
compaction 0.65 O.D. min.
foundation
level
gravel backfill gravel backfill for
for pipe bedding foundations when specified
A = 4" min. 27" I.D. and under
6" min., over 27" I.D.
A. Metal and Concrete Pipe
c,
11- This frame is designed to accommodate 20" x 24" grates or
covers
2. Provide two holes in the frame that are vertically aligned with t
he grate or cover slots. Tap each hole to accept
a 5/8" - 11 NC x 2" alien head cap screw.
Location of bolt down holes varies among different
manufacturers.
3. Refer to Standard Specification 9-05.15(2) for additional
requirements.
ISOMETRIC VIEW
I d span 6 1.4 span span b 4111 ........... 3' max
3' max ! �J' max
Flexible Pipe NOTES:
Min. dist.
between
barrels
--------- -- ------- -----
VVVVVVVVVVVV\/ VVVV
V 011
1. Provide uniform support under barrels.
2. Hand tamp under haunches.
0" to 96"
diam. 0 2
102" to 180"
3. Compact bedding material to 95% max. density; directly
pipe - arch
metal only
(span)
W
12"
over pipe, hand tamp only.
span / 3
148" to 199"
48"
_1
LI
- 0.15 rise min.
4. See "Excavation and Preparation of Trench" in sanitary
Li
LLJ
112" MAX.
84"
or 96" FLAT SLAB TOP
sewers section of the standard WSDOT/APWA
limits of pipe
-.,--specifications
111
•)
for trench width "W" and trenching
compaction
Z
LLJ Lj
U-11
0.65 rise min.
options. The pipe zone will be the actual trench width.
---O-gravel
The minimum concrete width shall be 1 1 2 I.D. = 18".
gravel backfill ' baGkfill for
foundations when specified
5. Trench backfill shall conform to "Backfilling Sewer
for pipe bedding
Trenches" in the sanitary sewers section of the
0
I -Z
WSDOT/APWA standard specifications, except that
qft
rocks or lumps larger than 1" per foot of pipe diameter
B. Pipe - Arch Installation
shall not be used in the backfill material.
6. See "Bedding Material for Flexible Pipe" in aggregates
section of the WSDOT/APWA standard specifications
Z
0
for the material specifications.
Rigid Pipe NOTES:
1. Pipe compaction limits shown on this plan are for pipe
construction in an embankment. For pipe construction
in a trench, the horizontal limits of the pipe compaction
zone shall be the walls of the trench.
2. All steel and aluminum pipe and pipe -arches shall be
installed in accordance with design A.
3. Concrete pipe with elliptical reinforcement shall be
installed in accordance with design A.
4. Concrete pipe, plain or with circular reinforcement, shall
be installed with design A.
5. O.D. is equal to the outside diameter of a pipe or the
outside span of pipe -arch. The dimensions shown as
O.D. with 3' maximum shall be O.D. until O.D. equals
T; at which point 3' shall be used.
1 "-0" for diameters 12" through 42" and spans through
50". Z -O" for diameters greater than 42" and spans
greater than 50".
Backfill material placed in 0.5' loose layers and
compacted to 95% maximum density.
Method B or C compaction (WSDOT/APWA)
standard specifications.)
Pipe
Size
Min. dist.
between
barrels
circular pipe
cone., LOPE, CMP3
(diameter)
12" to 24"
1211
0" to 96"
diam. 0 2
102" to 180"
48"
pipe - arch
metal only
(span)
18" to 36"
12"
43" to 142's
span / 3
148" to 199"
48"
<
5
W
2
<
Z
Z
0 1 1 L
0
LL
STORM A S
24"
D T I
"Y
PUBLIC WORKS
+ i
1ka DEPARTMENT
N1
. ........... .. . . . . ..............
<
7
M
Z:
PLAN
SLOT - SEE DETAIL
AND NOTE I
3/8" (9mrn) RECESSED
LETTERING
RECTANGULAR
HERRINGBONE GRATE
12"MIN
L/2
L
3"
PIPE COUPLING --- /
CMP OR CPEP SMOO
INTERIOR
45'
SIDE VIEW
\F
Z_ - I/ Z__
7
#6 BARS @ 7" SPACING
20" x 24"
APP"AL
Dote:
By:
0
U)
By:
Do to
24" DIAM., 48" DIAM.
OR 54" DIAM. HOLE
Dote
O
V)
0
IONA L
ip
2" (TYP)
I
12E
I
Z
_1
LI
. . . .
1" MIN.
Li
LLJ
112" MAX.
84"
or 96" FLAT SLAB TOP
#5 BARS @ 6" SPACING
20" x 24",
24" DIAM., 48" DIAM.
OR 54" DIAM. HOLE
FOR ACCESS AND STEPS
I" MIN.
2 1/2" MAX.
72", FLAT SLAB TOP
24" MIN.
#4 BARS @ 6" SPACING
>
00
20" x 24" OR
24" DIAM. HOLE
--- - - ------------------------- - ----- - ------ - ----- -
2" (TYP.)
48" MIN.
------ -----------
- -----------
_T 1" MIN.
2 112" MAX. ECCENTRIC CONE SECTION
48", 54", or 60" FLAT SLAB TOP
12" (TYP-)
00
6"
PREFABRICATED LADDER
12" MIN.
STEP
34"
1 1/4"
co
�i
�6" OR 12"
�1,01\!E #3 BAR HOOP
ONE #3 BAR HOOP FOR 6" 4"
TWO #3 BAR HOOPS FOR 112"
BOLT -DOWN SLOT DETAIL
SEE NOTE 1 RECTANGULAR ADJUSTMENT SECTION CIRCULAR ADJUSTMENT SECTION
1.0 As an acceptable alternative to rebar, wire mesh having a
minimum area of 0.12 square inches per foot may be used
for adjustment sections.
STD. PI204.40
" PUBLIC WORKS MISCELLANEOUS DETAILS FOR STD. PLAN 204.60
+
DEPARTMENT DRAINAGE STRUCTURES
MARCH 2008I MARCH 2008
I
3/4" DIA. SMOOTH BAR
SPOT WELD BARS TO AT LEAST 2
CORREGATIONS OF METAL PIPE (TYP)
BOLT TO CPEP SMOOTH
INTERIOR PIPE.
NOTE:
1. This debris barrier is for use outside roadways on pipes
36" dia. and smaller.
2. See drawing 223.10 for debris barriers on pipes projecting
from driveways or roadway side slopes.
3. All steel parts must be galvanized and asphalt coated.
(Treatment 1 or better).
4. CPEP-smooth interior pipe requires bolts to secure
debris barrier to pipe.
4" MAX. (TYP)
END VIEW
SIX EVENLY SPACED
HOLES ON 10 3/8" BOLT
VG TO
ON.
FRONT
LU `/
Z
_J
_J
9!
LU
- - - - ---- - -
SEE NOTE 5
SIDE MAXIMUM OPENING OF GATE
HANDLE WITH LOCK PIN.
o
ADJUSTABLE LOCK HOOK WITH LOCK SCREW.
10
L11
LIFT HANDLE SHALL BE ATTACHED PER
I" ROD OR TUBING, VARIABLE LENGTH. MANUFACTURER'S RECOMMENDATIONS.
LIFT HANDLE
NOTES:
-
1. SHEAR GATE SHALL BE ALUMINUM ALLOY PER ASTM B-26-ZG-32a OR CAST IRON ASTM A48 CLASS 30B AS REQUIRED.
2. GATE SHALL BE 8 IN. DIAM. UNLESS OTHERWISE SPECIFIED.
3. GATE SHALL BE JOINED TO TEE SECTION BY BOLTING (THROUGH FLANGE), WELDING, OR OTHER SECURE MEANS.
4. LIFT ROD: AS SPECIFIED BY MFR. WITH HANDLE EXTENDING TO WITHIN ONE FOOT OF COVER AND ADJUSTABLE HOOK LOCK
FASTENED TO FRAME OR UPPER HANDHOLD.
5. GATE SHALL NOT OPEN BEYOND THE CLEAR OPENING BY LIMITED HINGE MOVEMENT, STOP TAB, OR SOME OTHER DEVICE.
6. NEOPRENE RUBBER GASKET REQUIRED BETWEEN RISER MOUNTING FLANGE AND GATE FLANGE.
7. MATING SURFACES OF LID AND BODY TO BE MACHINED FOR PROPER FIT.
8. FLANGE MOUNTING BOLTS SHALL BE 3/8 IN. DIAM. STAINLESS STEEL.
9. ALTERNATE CLEANOUT/SHEAR GATES TO THE DESIGN SHOWN ARE ACCEPTABLE, PROVIDED THEY MEET THE MATERIAL
SPECIFICATIONS ABOVE AND HAVE A SIX BOLT, 10 3/8 IN. BOLT CIRCLE FOR BOLTING TO THE FLANGE CONNECTION.
y__
STD. PLAN 220.00 STD. PLAN 223.00 STD. PIAN 237.30
6, MOM PUBLIC WORKS PIPE COMPACTION PUBLIC WORKS DEBRIS BARRIER T - SHEAR GATE DETAIL
+; + PUBLIC WORKS FROP
DEPARTMENT DESIGN AND BACKFILL 7 DEPARTMENT
DEPARTMENT
MARCH 2008 MARCH 2008 MARCH 2008
R-3819 18
20"x24"
00
NOTES:
1) ALL MATERIAL FOR GRATE SHALL BE
DUCTILE IRON, ASTM A536 GR.80-55-06
2) GRATE SHALL BE OLYMPIC FOUNDRY
MODEL No. SM 72B OR EQUAL.
ALL BARS 5/8" --J '--ALL SLOTS 1"
SQUARE BEEHIVE
DRAIN GRATE
NOT TO SCALE
RECOMIMPOMPKrA
By:/
APP"AL
Dote:
By:
0
U)
By:
Do to
By:
Dote
O
V)
0
IONA L
ip
6/19/2015
X
LL_
i; C
U
Z
Z
LLJ
>
Li
Li
LLJ
(N
00
UJ
M
0
C14
0
"o
4
111
•)
0
4) %. 0
0
UJ
Z
LLJ Lj
U-11
< LC)
C -N
J
V)
ZEN
L0
Lo Ln
Z
WUJ
00
0
I -Z
N
qft
r-
L) to
Z
Z
0
V)
!->
La
LLJ
iz
n
0
<
Z
UJ
CL
IC10-
LLJ
UJ
LLJ
Jv
LLJ
�e
�eIll
LO
Lo
LO
(M
C4
CN
0
R-3819 18
20"x24"
00
NOTES:
1) ALL MATERIAL FOR GRATE SHALL BE
DUCTILE IRON, ASTM A536 GR.80-55-06
2) GRATE SHALL BE OLYMPIC FOUNDRY
MODEL No. SM 72B OR EQUAL.
ALL BARS 5/8" --J '--ALL SLOTS 1"
SQUARE BEEHIVE
DRAIN GRATE
NOT TO SCALE
RECOMIMPOMPKrA
By:/
APP"AL
Dote:
By:
Dote:
By:
Do to
By:
Dote
M
GUY
W A S111
1-1
'I
6r
C
3
Z0
W)
foe%,
P 38950
O
V)
0
IONA L
Z
0
6/19/2015
X
LL_
i; C
U
0
U
Z Z
0
>
Li
Li
3:
(N
00
UJ
M
0
C14
oo
"o
4
111
•)
0
4) %. 0
0
06 wwo
L) CIL 0
M
qr�
C4
LJLJ
0 L)
C
3
Z0
W)
Z 5;
0--
O
V)
0
>
Z
0
w<
X
LL_
_J
:Z
M
Li
Li
CN
to CN
(N
00
Z
-0
M
00 (0
oo
ZZ >
0:
Z:
Z
LLJ Lj
U-11
< LC)
C -N
Ln
014
Z
Z5 Z
L0
Lo Ln
Z
WUJ
00
w CN
N
>
M
D
r-
L) to
It>
0
Z
UJ
;4*
Jv
G
M
qr�
C4
E
C
3
Z0
W)
Go
0
>
M
Z
C
c�
(D
00 00 0
>
O
�N
M
M
M
M
CD
cn
Z
M
-1
0
M
Z
M
0
>1,10
>
c�
(D
00 00 0
>
O
�N
n
L)
0
0
11
CD
0
:n