EROSION CONTROL NOTES
Crj 1. THESE NOTES SHALL APPEAR FOR PROJECTS — SITE IMPROVEMENTS, SURFACE
C) WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE—CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON,
O PUBLIC WORKS DESIGN ENGINEER.
O
L0 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION
'— AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING
IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING
LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION
Q AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
n PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR
FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
0OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
= SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON—SITE EROSION HAS
�. PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/
L1j SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
(� INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
D CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE
F-- SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
z NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE
Q COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE
`-7, TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST — MARCH 30TH) OR
SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST — SEPTEMBER 30TH) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT—LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST — MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS,
THAT ARE TO BE LEFT UN—WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED
BY MULCH, SODDING, OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL
BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
APPLICABLE NOTES:
1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSTREAM
AND/OR WITHIN 500 FEET OF DISTURBANCE OR CONSTRUCTION AREA.
2. DUST CONTROL MEASURES SHALL BE PROVIDED.
3. MULTCHING OF EXPOSED SOILS IS APPLICABLE.
4. FABRIC FILTER FENCING ON ALL DOWNSLOPES IS REQUIRED.
5. SEPARATE BUILDING PERMIT REQUIRED FOR WALL/RETAINING STRUCTURES
IN EXCESS OF 4 (48") FEET TALL.
CALL 81 1
BEFORE YOU DIG!
DEMO EXISTING STRUCTURE
REMOVAL OF EXISTING FEATURES
NOTE:
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE
APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND
HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO
REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
PP"gPnNgIRII ITY FnR IIT11ITIES NOT SHOWN OR UTILITIES
'ER LOCATION.
-I b A4b I UI-'=2Ub.UU
OUTLET=204.00
SEE CONTROL DETAIL SHEET 4
SURFACE AREA REQUIRED=400 SQ. FT.
SURFACE AREA PROVIDED=1200 SQ. FT.
(� L .
Y�F ° O 101111
°°.WOFFE ENGINEERSN(�'
j'
�SURVEYED:
LANKT
REE SURVEYING
13932 SOUTHEAST 159TH PLACE q. - y `off DESIGNED:
D.L. OFFE P.E.
RENTON, WASHINGTON 98058° °
° e ° DRAWN:
PHONE: 425-260-3412 ,�°°.Q�, 2'4so o D.L. OFFE, P.E.
O�°°° �/STER�C°�_N°``�� CHECKED:
CONTACT: DARRELL OFFE, P.E. �Ss�O N00000
0 0 0 0 `APPROVED.
06/01 /2015 N0.F REVISION BY DATE APPR
SCALE
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORD06GLY
DIRT QUANTITIES
CUT: 385 CU. YARDS
FILL: 130 C U . YARDS
VERTICX_ NAVD 1999
HORIZONTAL: NAD 1983/1991
DATUM
jk CITY OF
-RENTON
Planning/Building/Public Works Dept.
W
OVE EXISTING FEATURES
GRAPHIC SCALE
0 15 30 60
60" =001
1 inch = 3Q feet
RECOMMENDED FOR APPROVAL
By: ���ta.la/ Dates "7 C 11 r
By= Date:
By: Date=
By: Dates
NANTUCKET SHORT PLAT
NANTUCKET AVENUE, LLC
GRADING 1 EROSION CONTROL
2820 PARK AVENUE NORTH
12 - S?;,00
06/01/2015
FIELDSOOK:
PAGE:
DRAVANG NO:
SHEET: 3 OF- 20
miloaHE 11"m ILI
Q
o
MM
L.1.
U)
Lu
W
z Cu
m
L'
r
'
a¢
LU
z
-
w Z
uj
z�
a
• a
Z
}
EROSION CONTROL NOTES
Crj 1. THESE NOTES SHALL APPEAR FOR PROJECTS — SITE IMPROVEMENTS, SURFACE
C) WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE—CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON,
O PUBLIC WORKS DESIGN ENGINEER.
O
L0 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION
'— AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING
IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING
LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION
Q AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
n PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR
FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
0OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
= SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON—SITE EROSION HAS
�. PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/
L1j SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
(� INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
D CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE
F-- SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
z NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE
Q COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE
`-7, TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST — MARCH 30TH) OR
SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST — SEPTEMBER 30TH) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT—LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST — MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS,
THAT ARE TO BE LEFT UN—WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED
BY MULCH, SODDING, OR PLASTIC COVERING.
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL
BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
APPLICABLE NOTES:
1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSTREAM
AND/OR WITHIN 500 FEET OF DISTURBANCE OR CONSTRUCTION AREA.
2. DUST CONTROL MEASURES SHALL BE PROVIDED.
3. MULTCHING OF EXPOSED SOILS IS APPLICABLE.
4. FABRIC FILTER FENCING ON ALL DOWNSLOPES IS REQUIRED.
5. SEPARATE BUILDING PERMIT REQUIRED FOR WALL/RETAINING STRUCTURES
IN EXCESS OF 4 (48") FEET TALL.
CALL 81 1
BEFORE YOU DIG!
DEMO EXISTING STRUCTURE
REMOVAL OF EXISTING FEATURES
NOTE:
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE
APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND
HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO
REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
PP"gPnNgIRII ITY FnR IIT11ITIES NOT SHOWN OR UTILITIES
'ER LOCATION.
-I b A4b I UI-'=2Ub.UU
OUTLET=204.00
SEE CONTROL DETAIL SHEET 4
SURFACE AREA REQUIRED=400 SQ. FT.
SURFACE AREA PROVIDED=1200 SQ. FT.
(� L .
Y�F ° O 101111
°°.WOFFE ENGINEERSN(�'
j'
�SURVEYED:
LANKT
REE SURVEYING
13932 SOUTHEAST 159TH PLACE q. - y `off DESIGNED:
D.L. OFFE P.E.
RENTON, WASHINGTON 98058° °
° e ° DRAWN:
PHONE: 425-260-3412 ,�°°.Q�, 2'4so o D.L. OFFE, P.E.
O�°°° �/STER�C°�_N°``�� CHECKED:
CONTACT: DARRELL OFFE, P.E. �Ss�O N00000
0 0 0 0 `APPROVED.
06/01 /2015 N0.F REVISION BY DATE APPR
SCALE
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORD06GLY
DIRT QUANTITIES
CUT: 385 CU. YARDS
FILL: 130 C U . YARDS
VERTICX_ NAVD 1999
HORIZONTAL: NAD 1983/1991
DATUM
jk CITY OF
-RENTON
Planning/Building/Public Works Dept.
W
OVE EXISTING FEATURES
GRAPHIC SCALE
0 15 30 60
60" =001
1 inch = 3Q feet
RECOMMENDED FOR APPROVAL
By: ���ta.la/ Dates "7 C 11 r
By= Date:
By: Date=
By: Dates
NANTUCKET SHORT PLAT
NANTUCKET AVENUE, LLC
GRADING 1 EROSION CONTROL
2820 PARK AVENUE NORTH
12 - S?;,00
06/01/2015
FIELDSOOK:
PAGE:
DRAVANG NO:
SHEET: 3 OF- 20
miloaHE 11"m ILI