Loading...
HomeMy WebLinkAboutzR-3834SetDESIGN TEAM CIVIL: SvR DESIGN 1205 2ND AVE, SUITE 200 SEATTLE, WA 98101 CONTACT: PATTY BUCHANAN V (206) 223.0326 DEVELOPER RENTON HOUSING AUTHORITY 2900 NE 10TH ST RENTON, WA 98056 CONTACT: MARK CROPPER E: mrg@rentonhousing.org V (425) 226.1850 x223 -w WT" V. w W -w-" w QA 0 ' QC R EV! EW PORTION OF: SE 1/4 & NE 1/4 OF THE SW 1/4, SECTION 04, T. 23 N., R. 05 E., W.M. PERMIT NUMBER: U13000867 RENTON H1CUSING AUTHORITY N IE 16TH ST & KIR K*[.,ANE) AVE NEE REPAVING RENTON, WA 98056 PERMIT NUMBER U13000867 � PPRP N VICINITY MAP NTS ins KEY MAP N 50' 25' 0 50' 100 Scale In Feet CITY OF RENTON Approved by: - Date: z1-Zo . � Approved by: I Approved by: Approved by: SITE SHEET INDEX SHEET NO.. DESCRIPTION G1.0 COVER G1.1 NOTES G1.2 CITY OF RENTON NOTES C1.1 TESC AND DEMOLITION PLAN C1.2 TESC AND DEMOLITION PLAN C2.1 PAVING AND STRIPING PLAN C2.2 PAVING AND STRIPING PLAN D1.0 DETAIL AND SECTION SHEET R-383401 Date: Date: Date: PLEASE CALL 811 3 Working Days BEFORE YOU DIG N HOUR su BENCHMARK s ,, ,i,�, RENTON HOUSING 3/19/2015 DESIGNED: AS NOTED ��► CITY OF O U S G AUTHORITY DESIGN COMPANY AA/PB N E 16TH ST & KIRKLAND AVE N E REPAVING FIELDBOOK: , � � � E AVING PSE 1205 SECOND AVE. SUITE 200► __ `� R E N T O N SEATTLE, W A 98101 KA ONE INCH ., RENTON , WA 98056 DRAWING NO: L DAT , T 206.223.0326 CHECKED: AT FULL ScuE Planning/Building/Public Works Dept.WVB F 206.223.0125 KG IF NOT ONE INCH G i . 0 T`HOR www.svrdesign.com N 0 . R EVI S I 0 N BY DATE AP P R vs scN.E ACC01�D'"�Y SHEET: OF: �. � ao z m 71 d n cil O o �� 4b. z� 1 D 0�0 �W 0 D T L7 O t iC 1 L �Z ,m �2 �O , r m co D 71 d �o cil 0 o �� 4b. z� 1 0�0 �W 0 := 00 < zr�. 71 oF cil 0 m m0 -o := 00 < zr�. Q W z W z � _ Y z Q cn z S W W J LL GENERAL CONSTRUCTION NOTES 1. ALL WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CIN OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CIN OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2. A COPY OF THE APPROVED PLANS MUST BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 3. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY. 4. PAVED SURFACES INCLUDING ROADWAYS, SIDEWALKS, AND CURBS THAT ARE DAMAGED BY NEW CONSTRUCTION IN PUBLIC RIGHT-OF-WAY SHALL BE REPAIRED AS REQUIRED BY THE CITY OF RENTON INSPECTOR. 5. THE CONTRACTOR SHALL NOTIFY THE FIRE DEPARTMENT DISPATCHER TWENTY-FOUR (24) HOURS IN ADVANCE OF ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, AND STREET CLOSURES OR OTHER ACCESS BLOCKAGE. THE CONTRACTOR SHALL ALSO NOTIFY THE DISPATCHER OF ALL NEW, RELOCATED, OR ELIMINATED HYDRANTS RESULTING FROM THIS WORK. 6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. 7. THE CONTRACTOR SHALL LOCATE AND PROTECT ALL CASTINGS AND UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATOR SERVICE (1-800-424-5555) AT LEAST 72 HOURS PRIOR TO CONSTRUCTION. 8. THE CONTRACTOR SHALL ADJUST ALL EXISTING MAINTENANCE HOLE RIMS, DRAINAGE STRUCTURE LIDS, VALVE BOXES, AND UTILITY ACCESS STRUCTURES TO FINISH GRADE WITHIN AREAS AFFECTED BY THE IMPROVEMENTS. 9. THE CONTRACTOR SHALL PROVIDE FOR ALL COMPACTION TESTS REQUIRED BY THE CITY OF RENTON INSPECTOR FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY. 10. BACKFILL MATERIAL USED IN PUBLIC RIGHT-OF-WAY SHALL MEET CITY OF RENTON STANDARD SPECIFICATIONS AND SHALL BE APPROVED BY THE CITY OF RENTON. 11. INSPECTION AND ACCEPTANCE OF ALL WORK IN PUBLIC STREET RIGHT-OF-WAY WILL BE ACCOMPLISHED BY REPRESENTATIVES OF THE CITY OF RENTON. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE AND SCHEDULE APPROPRIATE INSPECTIONS, ALLOWING PROPER ADVANCE NOTICE. THE INSPECTOR MAY REQUIRE RECONSTRUCTION OF ITEMS THAT DO NOT MEET AUTHORITIES HAVING JURISDICTION (AHJ) STANDARDS OR THAT WERE CONSTRUCTED WITHOUT INSPECTION. ANY RECONSTRUCTION SHALL BE AT CONTRACTOR'S EXPENSE. 12. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE TRAFFIC CONTROL MANUAL. A CITY OF RENTON APPROVED TRAFFIC CONTROL PLAN WILL BE REQUIRED PRIOR TO ISSUANCE OF PERMIT. 13. CARE SHALL BE EXERCISED WHEN EXCAVATING NEAR ANY EXISTING UTILITY LI N ES. 14. THE CONTRACTOR SHALL SUBMIT CONSTRUCTION HAUL ROUTES TO CITY OF RENTON PRIOR TO CONSTRUCTION. 15. IN THE EVENT NOTES CONFLICT, THE CITY OF RENTON STANDARD NOTES SHALL RULE. �� of WA Q z Z AM s� QA QC REVIEW 1 PORTION OF: SE 1/4 & NE 1/4 OF THE SW 1/4, SECTION 04, T. 23 N., R. 05 E., W.M. PERMIT NUMBER: U13000867 TESC NOTES 1. CONSTRUCTION EROSION CONTROL MEASURES MUST BE IN PLACE AND APPROVED BY THE CITY OF RENTON INSPECTOR PRIOR TO ANY EARTH DISTURBANCE. 2. THE IMPLEMENTATION OF THE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND UPGRADING OF THE TESC FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS APPROVED AND SITE IS PERMANENTLY STABILIZED. 3. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO ENSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE PUBLIC DRAINAGE SYSTEM. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES MAY BE REQUIRED TO ENSURE COMPLETE SILTATION CONTROL OF THE PROJECT. THEREFORE, DURING THE COURSE OF CONSTRUCTION IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS/HER ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES THAT MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES. 4. THE TESC FACILITIES SHOWN ON THE PLANS MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL DEMOLITION, CLEARING, AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT LEAVE THE SITE, ENTER THE DRAINAGE SYSTEM, OR VIOLATE APPLICABLE WATER STANDARDS. 5. DURING THE CONSTRUCTION PERIOD, THE TESC FACILITIES SHALL BE MAINTAINED AND UPGRADED (E.G. ADDITIONAL SUMPS, RELOCATION OF DITCHES, PORTABLE TANKS AND SILT FENCES, ETC.) ArS NEEDED SO AS NOT TO VIOLATE APPLICABLE WATER STANDARDS. 6. ALL TESC FACILITIES SHALL CONFORM TO THE BEST MANAGEMENT PRACTICES LISTED IN THE CITY OF RENTON EROSION CONTROL NOTES. 7. NO SEDIMENT SHALL BE ALLOWED TO ENTER ANY CATCH BASIN WITHIN THE PROJECT AREA. IN THE EVENT OF A FAILURE OF THE TESC PLAN THAT RESULTS IN SEDIMENT ENTERING A CATCH BASIN, THE CONTRACTOR SHALL REMOVE ALL SUCH SEDIMENT IMMEDIATELY. 8. DISTURBED SOILS THAT ARE EXPOSED TO SURFACE RUNOFF SHALL BE STABILIZED WITH TESC MEASURES AS DIRECTED BY THE CITY OF RENTON. 9. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. 10. CATCH BASINS IN THE STREET OR ON-SITE SHALL BE INSPECTED BY THE CONTRACTOR DAILY. WATER LEAVING THE SITE DURING CONSTRUCTION, INCLUDING WATER CARRIED BY TRUCKS, SHALL BE CLEAN. THE CONTRACTOR S HALL CLEAN CITY CATCH BASINS AND IMPLEMENT EXTRA SEDIMENTATION CONTROL MEASURES IF NECESSARY AND AS DIRECTED BY THE RENTON INSPECTOR AT NO ADDITIONAL EXPENSE TO OWNER. 11. THE TESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED DAILY AND WITHIN 24 HOURS FOLLOWING A STORM EVENT. 12. PROTECT STOCKPILES FROM WET WEATHER AND CONTAMINATION FROM OTHER SOURCES. PROVIDE DUST CONTROL MEASURES AND STOCKPILE PROTECTION IN ACCORDANCE WITH CITY OF RENTON REQUIREMENTS. STOCKPILES THAT BECOME UNSUITABLE DUE TO LACK OF PROTECTION MEASURES SHALL BE PROPERLY DISPOSED OF AND REPLACED AT CONTRACTOR'S EXPENSE. 13. THE TESC MEASURES SHOWN ON THE PLANS ARE FOR CITY OF RENTON PERMITTING PURPOSES ONLY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL MEANS AND METHODS AND SEQUENCING OF TESC MEASURES AND ENSURING WATER QUALITY REQUIREMENTS ARE MET. EARTHWORK AND GRADING NOTES 1. NONCOMPLIANCE WITH EROSION CONTROL REQUIREMENTS, WATER QUALITY REQUIREMENTS, AND CLEARING LIMITS MAY RESULT IN REVOCATION OF PROJECT PERMITS, PLAN APPROVAL, AND BOND FORECLOSURES. 2. PRIOR TO ANY WORK INCLUDING GROUND DISTURBANCE, THE CONTRACTOR SHALL CONTACT THE CITY OF RENTON TO SCHEDULE A PRE -CONSTRUCTION MEETING. 3. PRIOR TO ANY SITE CONSTRUCTION (WHICH INCLUDES CLEARING/LOGGING, DEMOLITION, OR GRADING THE SITE), CLEARING LIMITS SHALL BE LOCATED AND FIELD IDENTIFIED BY THE CONTRACTOR'S SURVEYOR. 4. ALL EARTHWORK SHALL BE PERFORMED IN ACCORDANCE WITH CITY OF RENTON STANDARDS. 5. ALL STRUCTURAL FILLS SHALL BE COMPACTED TO A MINIMUM OF 95% OF MAXIMUM DENSITY BY MODIFIED PROCTOR TEST UNLESS SPECIFICALLY INDICATED OTHERWISE IN THE SPECIFICATIONS. 6. APPROVAL BY CITY OF RENTON OF THE DRAINAGE AND TEMPORARY EROSION CONTROL PLANS DOES NOT INCLUDE APPROVAL OF THE GRADING ACTIVITIES SHOWN HEREIN. GRADING ACTIVITIES WITHIN THE RIGHT-OF-WAY REQUIRES A PERMIT FROM CITY OF RENTON. GRADING ACTIVITIES ON ADJACENT PROPERTIES REQUIRES WRITTEN APPROVAL BY THE ADJACENT PROPERTY OWNER. 7. GRADING AND EXPOSED SOILS MUST BE STABILIZED BY OCTOBER 15TH AND NO EXCAVATION TO BE PERFORMED BETWEEN OCTOBER 31 ST AND APRIL 1 ST UNLESS CONTRACTOR HAS OBTAINED WRITTEN APPROVAL BY CITY OF RENTON. STORM DRAINAGE NOTES 1. PROVIDE STORM DRAIN STENCILING IN PAVEMENT AT ALL STORM DRAIN CATCH BASINS, INLETS AND AREA DRAINS THAT ARE IN OR WITHIN ONE FOOT OF A PAVED AREA. STENCILING SHALL BE IN ACCORDANCE WITH PUBLIC AGENCY STANDARDS. INFILTRA11ON AND LID FACILMES PROTECTION NOTES 1. MAINTAIN AND UPGRADE EXISTING PROTECTION AND FLOW DIVERSION MEASURES. REDIRECT SHEET FLOW, BLOCK DRAIN INLETS AND/OR CURB OPENINGS IN PAVEMENT AND INSTALL FLOW DIVERSION MEASURES TO PREVENT CONSTRUCTION SILT LADEN WATER AND DEBRIS FROM ENTERING ROADSIDE BIORETENTION FACILITIES AND POROUS PAVEMENTS. 2. DO NOT STOCKPILE MATERIALS ON PERVIOUS CONCRETE PAVEMENTS, BIORETENTION SWALES AND WITHIN PROTECTION ZONE (r-,DRIPLINE) OF TREES. PRE-CONSTRUC11ON MEETING PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL SCHEDULE AND ATTEND A PRE -CONSTRUCTION CONFERENCE WITH THE CITY OF RENTON. THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE OWNER'S PROFESSIONAL ENGINEERING CONSULTANTS OF THE PRE -CONSTRUCTION MEETING TIME AND LOCATION. IF A PRE -CONSTRUCTION MEETING IS NOT REQUIRED, A FIRST GROUND DISTURBANCE MEETING WITH THE OWNER AND CONSULTANT DESIGN TEAM IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITY. HORIZONTAL AND VERTICAL CONTROL NOTES* *PROVIDED BY BENCHMARK SURVEYING LLC HORIZONTAL DATUM: NAD 1983/91 UTILIZING CIN OR RENTON MONUMENTS N0. 58 AND 1843 ON NE 12TH ST. VERTICAL DATUM: NAVD 88 PER CITY OF RENTON CONTROL NETWORK CONTROLLING BENCHMARK: CITY OF RENTON MONUMENT NO. 57: 3" BRASS DISC W/ "X" IN CASE AT INT. OF NE 12TH ST. & EDMONDS AVE. NE. ELEVATION = 326.43' (99.496 METERS)+ BENCHMARKS: �Z n n a SITE BENCHMARK NO. 1: FOUND & ACCEPTED PK NAIL AT THE INTERSECTION OF KIRKLAND AVE. NE & NE 15TH ST. ELEVATION = 376.12 SITE BENCHMARK NO. 2: FOUND & ACCEPTED PK NAIL AT THE INTERSECTION OF KIRKLAND AVE. NE & NE 16TH ST. ELEVATION = 379.91 ELECTRONIC INFORMATION TRANSFER AGREEMENT (EITA) AN AUTOCAD@ CIVIL 3DB 2015 FILE (FOR THE SOLE PURPOSE OF 2D HORIZONTAL LAYOUT) WILL BE PROVIDED TO THE CONTRACTOR AT THE BEGINNING OF THE PROJECT'S CONSTRUCTION. THE AUTOCAD FILE WILL PROVIDE FOR HORIZONTAL LAYOUT OF GRADING CONTOURS, STRIPING, AND/OR PAVING SHOWN ON PLAN VIEW OF THE DRAWINGS. PRIOR TO RELEASE OF AUTOCAD FILE, CONTRACTOR WILL BE REQUIRED TO SIGN AN ELECTRONIC INFORMATION TRANSFER AGREEMENT (EITA) FORM FROM SvR DESIGN COMPANY. PLEASE SUBMIT REQUEST FOR SvR'S EITA FORM THROUGH THE OWNER'S PROJECT CONTACT ESTABLISHED FOR THE JOB. OWNER'S PROJECT CONTACT WILL THEN NOTIFY SvR DESIGN COMPANY'S PROJECT MANAGER FOR A COPY OF THE EITA FORM. AFTER SvR HAS RECEIVED THE SIGNED EITA FORM, ALLOW UP TO SEVEN (7) BUSINESS DAYS FOR PREPARATION OF THE FILE BY SvR. IF DISCREPANCIES ARE OBSERVED BETWEEN THE AUTOCAD FILE PROVIDED AND INFORMATION SHOWN ON THE HARD COPY OF THE CONSTRUCTION DOCUMENTS, NOTIFY PROJECT CONTACT BY SUBMITTING A RFI. rC=, 0 NT12i1C?oR SlffaLl_ GG MP'LY �t,lT(-f 444 E: cctv of REhrcn. T12tAi-14- Q E­6TC P_Pr--P(h Ahs .57REET Gb'CRLA-V RPCtiL"l2N; T'S CITY OF RENTON Approved by: ,i,- ..�w Date: z1- 5cv. Zo .� Approved by: Approved by: Approved by: R- 383402 Date: Date: Date: PLEASE CALL 811 3 Working Days BEFORE YOU DIG ON HOS �-� b , SURVEYED: BENCHMARK scA�E SON,_ � 1!/1991 �� �3/19/2015 DESIGNED: AS NOTED �!► CITYOFRENTON HOUSING AUTHORITY DES IGN COMPANY I_ AA/PB NE 16TH ST & KIRKLAND AVE NE REPAVING FIELDBOOK: 1205 SECOND AVE. SUITE 200DR AWN: m RENTON PAGE 1I SEATTLE, WA 98101 KA RENTON WA 98056 T 206.223.0326 CHECKED: ONE INC DATU V DRAWING N0: F 206.223.0125 Ke IFAT FULL NOT ONEINCH Planning/Building/Public Works Dept. NOTES G1.1 O www.svrdesign.com N 0 . REVISION BY DATE AP P R APPROVED:S SCALE ACCORDINGLY SHEET: OF: D T 0 u ]o C �cn D �z 0 sK z m In D m >. - }z z'I c m m D �Z n n a O �-m z T o j° gMrn z We m m m 0 D D T 0 u ]o C �cn D �z 0 sK z m In D m >. - }z z'I c m m D n n a O �-m m o � gMrn - We Z CITY OF RENTON GENERAL EROSION CONTROL NOTES 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRECONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON'S PUBLIC WORKS DESIGN ENGINEER. 0 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION z Q AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED IN THE FIELD AND OBSERVED DURING CONSTRUCTION. z z 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING Q AND/OR CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER z DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A Y SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING Y AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR z ON—SITE EROSION HAS PASSED. THE IMPLEMENTATION, Q MAINTENANCE, REPLACEMENT AND ADDITIONS TO cn EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE. CID T_ o� Ld z 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THE DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO 8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, W THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND H A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES. SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO 1 ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE 9. NOT USED OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE r� SYSTEM. 5. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 6. DURING THE TIME PERIOD OF OCTOBER 1 ST THROUGH APRIL 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER THAN 5,000 SQUARE FEET, THAT ARE TO BE LEFT UN—WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING. PORTION OF: SE 1/4 & NE 1/4 OF THE SW 1/4, SECTION 04, T. 23 N., R. 05 E., W.M. PERMIT NUMBER: U13000867 zi uj 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND z ® c z m m r� EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. 7. IN ANY AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD 30 DAYS OR MORE, ALL DISTURBED AREAS MUST BE IMMEDIATELY D STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF APRIL THROUGH SEPTEMBER, INCLUSIVE. SEEDING MAY r PROCEED, HOWEVER, WHENEVER IT IS IN THE INTEREST OF THE PERMITEE, BUT MUST BE AUGMENTED WITH MULCHING, NETTING OR HER TREATMENT APPROVED BY THE CITY OF RENTON, OUTSIDE HE SPECIFIED TIME PERIOD. o� 8. FOR ALL EROSION/SEDIMENTATION CONTROL PONDS WHERE THE DEAD STORAGE DEPTH EXCEEDS 6 INCHES, A FENCE IS REQUIRED W H A MINIMUM HEIGHT OF THREE (3) FEET, 3:1 SIDE SLOPES. >� 1 9. NOT USED 0 r� AON HO S A CITY OF RENTON Approved by: -.:. Date: f'• 3 �• ZsL; Approved by: Approved by: Approved by: Date: Date: Date: R-383403 PLEASE CALL 811 3 Working Days BEFORE YOU DIG DESIGN C O M P SURVEYED: ENCHMARK SCALE-. vExncx: mw Im HORQONTA _ NAD j W/1 "I �� DATE - 1205 Y DESIGNED: AS NOTED AA/PB �- CITY 0RENTON HOUSING AUTHORITY 3/19/2015 1205 SECOND AVE. SUITE 200 ,,� N E 16TH ST & KI RKLAN D AVE FIELD800K. �"N RENTON NE REPAVING SEATTLE, WA 98101 KA � PAGE. T 206.223.0326 ONE INCH DATUM RENTON, WA 98056 CHECKED: DRAWING NO. F 206.223.0125 KG AT FULL SCALE Planning/Building/Public Buildin Public Works Dept. www.svrdesign.com N 0 . REVISION IF NOT ONE INCH 7 / g /� � ��� ��� BY DATE AP P R APPROVED: SCALE ACCORDINGLYG1.2 TVs SHEET: OF: F-1 _F r - I 0 mp °co: D M- T U] I D Z y �/ z:� m M ul N z rl1 m D 0 _Z Q d. Lil Cy W Z Lit Q C) Z g Y Y r) Z Q F— 2 F— (C) Tl- T Co rn° D �o C M me 7 n z Q n LLJ Of w z LLJ 0 z 0 z Q cs� LLJ Z ry D n C') O C U7 m DO n r 0 n- n� ll z z m O D CD z Q n W ry W z W Q O z Y Y 0 z Q F— Cf) F— cD w z Q ry cn D m n �o no c �cn D � rn C m m .� �rn z m cn D cn z CD° 13 mp o o° rrl m m cn z m m O --I D' CD z Q n W ry W z W Q O z Y Y 0 z Q F— Cf) F— cD w z Q ry cn D m n �o no c �cn D � rn C m m .� �rn z m cn D cn CD° 13 mp o° m� m m cn z c' 7 m m > 0 z Q n w Of w z LLJ Q 0 z Y Y z Q F-- CO z rn z m w CDD 0 z CD z c Fb cam n r r d C 00 CD o�� C CD z� W 0�0 0 m .p D T C3 0 m 0o D �Cf) r aJ 1 Lel Q� Z W J LL. J> � z 0 m z 2 m C3 c 10 En rn- cy Nz m m m m > rn rn 70 cr) z m T CT) - NzCil z m cn O U) 0 m C3 10 En