Loading...
HomeMy WebLinkAboutR-383806LTJ M Q z w J LL N 0 0 0 INSTALL 6 I qqQ D I L1J 0 0 ry W I 0 ry m Q Ld U Z W Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) D.R. STRONG CONSUL TING ENGINEERS D�,ENGINEERS PLANNERS SURVEYORS FE, 620 7TH AVENUE, KIRKLAND, WA 98033 O 425.827.3063 F 425.827.2423 SE 1/4 SECTION 14.9 1 G1Y COMMENTS 11.13.14 2 CITY COMMENTS 3 CITY COMMENTS 4 MYLARS N0. 1 REVISION TOWNSHIP 23 N, RANGE 5 E, W.M. 'EA T BRIDLE RIDGE PROPERTY UNE, SEE`'gHEETS C8 AND C19 FOR LOCA 770N$ AND DETAILS MAJ 02.13.15 MAJ SURVEYED: MAJ 05.19.1Sis 5 107.13.15 � DESIGNED: YLP � MAJ MA�J 07.23.15 MAJ DRAWN: YLP m CHECKED: MAJ BY DATE APPR APPROVED: CONS TRUC TION SEQUENCE: 1. PRE–CONSTRUCTION MEETING. 2. POST SIGN W77-1 NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED N077CE OF CONSTRUCTION SIGN). J. FLAG OR FENCE CLEARING LIMITS AND PROVIDE TREE PROTECTION. 4. INSTALL CATCH BASIN PROTEC77ON IF REQUIRED. 5. GRADE AND INSTALL CONSTRUCTION EN7RANCE(S). 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). Z CONSTRUCT SEDIMENT PONDS AND TRAPS 8. GRADE AND STABILIZE CONSTRUCTION ROADS 9. CONS 7RUC T SURFACE WATER CON 7ROL S (IN TERCEP TOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMUL TANEOUSL Y W H CLEARING AND GRADING FOR PROJECT DEVELOPMENT. 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDA TIONS 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE COND177ONS CHANGE THE EROSION AND SEDIMENT CONTROL IS AL WA YS IN ACCORDANCE WITH 774E CITY'S EROSION AND SEDIMENT CONTROL STANDARDS 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DA YS DURING THE DRY SEASON OR TWO DA YS DURING THE WET SEASON WI7H STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEE77NG OR EQUI VALENT. 13. STABILIZE ALL AREAS THA T REACH FINAL GRADE W 77-I/N SEVEN DA YS. 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DA Y5 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE NO TES.- 1. ES: 1. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY COR INSPECTOR. 2. ALL ONSI7E EXISTING IMPROVEMENTS TO BE REMOVED. 774/S INCLUDES ALL ONSITE FENCES. SEDIMENT TRAP SIZING SUMMARY.- 774E TRAP WAS SIZED USING THE REQUIREMENTS STA 7E'D IN APPENDIX D OF 77 -IE 2009 KING COUNTY SURFACE WATER DESIGN MANUAL WHICH REQUIRES 2,080 S.F. OF SURFACE AREA PER CFS OF INFLOW; DEVELOPED 2– YEAR STORM, 15–MIN. TIME STEPS. CATCHMENT AREA: 2.63 AC. 2– YEAR PEAK FLOW RA TE ................... 0.676 CFS REQUIRED SURFACE AREA ..................... 1, 406 S.F. PROVIDED SURFACE AREA ..................... 1,600 S.F. TESC LEGEND CONSTRUCTION LIMITS REINFORCED SILT FENCE 0 0 0 STABILIZED CONSTRUCTION EN7RANCE DC DUST CONTROL MULCHING, MA TTING, & COMPOST BLANKETS O INLET PROTECTION PS PERMANENT SEEDING AND PLANTING �.J STREET SWEEPING & VACUUMING INTERCEPTOR SWALE WITH ROCK CHECK DAM EVERY 50' 12" TEMPORARY CULVERT —a-0--0--0-- TREE PROTECTION FENCE OREMOVE EXISTING STRUCTURE OREMOVE EXISTING UTILITY ELEMENT TREE TO BE REMOVED FENCE NO TE. - POND FENCE IS REQUIRED DURING CONS7RUC77ON. SEE SHEET C19 FOR DETAILS NORTH GRAPHIC SCALE 0 20 40 80 1 INCH = 40 FT. 1 1 1 ECOMMENDED OR APPOVAL BY• Date:11Z?1�r BY: Date: BY: Date: BY: Date: SCALE: uA i t: VERTICAHORIZONTAL: AD 11983/1991 tR THE ENCLAVE AT BRIDLE RIDGE 10• AS NOTED CITY OF 03.14 FIELDBOOK: ba RENTON PAGE: ONE INCHDATM CLEARING AND TESC PLAN DRAWING NO: AT FULL SCALE Planning/Building/Public Works Dept. C6 IF NOT ONE INCH U14005368 SCALE ACCORDINGLY SHEET: 6 OF: 29 DRS PROJECT NO. 131171AI-INININliNIAIA f J C iV m m v d 0 M' z 9 ED I't'1 m i i D n m s= m Cf,