Loading...
HomeMy WebLinkAboutRES 3512RESOLUTION NO. 3512 A RESOLUTION OF THE CITY OF • • UPDATING THE CITY'S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 2002-2007. WHEREAS, the City of Renton has heretofore adopted a "Six -Year Transportation Improvement Program" pursuant to Chapter 7, Extraordinary Session Laws of the State of Washington, and Chapter 195 of the 1961 Session Laws of the State of Washington, and as same has heretofore been amended from time to time, and such plan and program having heretofore been duly amended and modified from time to time as authorized by law; and WHEREAS, the City Council, after recommendation of its Planning/Building/Public Works Department, caused to be held a public hearing thereon on June 25, 2001, and after notice to the Flow IRTIFIN jj�� of said plan and program; and WHEREAS, at such public hearing held on June 25, 2001, due consideration was given to the proposed changes and amendments for the purpose of updating such plan and program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The City's "Six -Year Transportation Improvement Program!' and the City's "Arterial Street Plan" are hereby further amended and modified, all as more particularly shown on the attached Exhibits "A," "B" and "C" incorporated herein as if fully set forth. SECTION 11, The aforestated plan and program, as evidenced by said Exhibits, shall be and constitute the City's "Six -Year Transportation Improvement Program" and the City's 1 RESOLUTION NO. 3 512 "Arterial Street Plan," and same to remain in full force and effect until further revised, amended, and modified as provided by law. SECTION III. The Administrator of the Department of Planning/Building/Public Works and the City Clerk are hereby authorized and directed to file this Resolution, together with the Exhibits, with the Director of Highways for the State of Washington and as otherwise provided by law. PASSED BY THE CITY COUNCIL this 2 5 th day of June , 2001. Marilyn kpdirsen, City Clerk APPROVED BY THE MAYOR this 2 5 th day of June , 2001. Approved as to form: Lawrence J. %66, City Attorney RES.853:5/25/01:ma 2 Dan Clawson, Mayor Pro tempore •ee .P V F7 A W N m W O�O ■ m � ■ a m m 'z N m W CITY OF RENTON SIX YEAR T.1. P. 2002-2007 �Y O U� T 24 (�3) LAKE WASHINGTON I I n 17 4z) 50) 46 ''I nrlru25 KI AA 9 -F r EXHIBIT 'A' aA-Alh Cl 4M ® yrs+ NE M ST \� 43 � ■ S lir A br 57 P. a 4 1f1q A a g N 7.H ST � S IN ST 10 n+ ■N■ ■■.■.. a �L g,iawsa ■ •••••■■� Sara WMST — 33 Sf �r ST . 1 1 31l 2 soar I ■ '&� SC m�S�LJp'a ' u s. n ■ ■S 311t 5a ■ 51&w ■ e SE INr Si G s. str n a S+r ST ■ g 47 ■ 5 17Lp 57 SL ❑bM �►3ftl 45 S>dr � STr 57 S. nth ST 34 Sl 410 ST 51 „y, yi 1 ■ 3 W SE 37M ST 1 s. as aw® s ONO �Sr R 49 PL 22) 52 12 EXHIBIT `B' City of Renton 2002-2007 Transportation Improvement Program Map Index TIP No. Project Title 1 Street Overlay Program 2 Oakesdale Avenue SW Phase 2 3 I-405/NE 44'' Interchange 4 Transit Program 5 Walkway Program 6 Benson Road Pedestrian 7 Downtown Transit Access 8 Transit Priority Signal System 9 SR-167/SW 27th Street/Strander Blvd. Connection 10 Grady Way/SR-167 11 SR -169 HOV and Queue Jump (140''' Way SE to SR -900) 12 Duvall Avenue NE 13 Renton Urban Shuttle (RUSH) 14 Arterial HOV Program 15 Trans -Valley and Soos Creek Corridor Program 16 Bridge Inspection & Repair Program 17 Logan Avenue Bridge Seismic Retrofit 18 Transportation Demand Management (TDM) Program 19 Loop Replacement Program 20 Sign Replacement Program 21 Light Pole Replacement Program 22 Sunset/Anacortes Avenue NE 23 Lake Washington Blvd.—Park Avenue North to Coulon Park 24 Lake Washington Blvd – Coulon Park to NE 44th 25 South 2nd Street Safety Project 26 Arterial Circulation Program 27 Project Development/Predesign Program 28 WSDOT Coordination Program 29 1-405 HOV Direct Access 30 City Gateways Program 31 Traffic Safety Program 32 Traffic Efficiency Program 33 Arterial Rehabilitation Program 34 East Valley Road & SW 43`d Rehabilitation 35 Transportation Concurrency Program 36 Missing Links Program 37 Park -Sunset Corridor/Duvall Avenue to Garden Avenue 2-2 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Railroad Crossing Safety Program Interagency Signal Coordination Program Environmental Monitoring Program Bicycle Route Development Program Rainier Avenue -SR -167 to South 2nd Street NE 3rd/NE 4th Corridor Improvements CBD Bike & Pedestrian Connections Lind Avenue SW 16th to SW 43rd SW 7t' Street/Lind Avenue SW Benson Road South/South 31St Street Monster Road Guardrail Valley Connections to West Oakesdale Avenue SW Extension South Renton Project NE 8th Street — Union to Duvall GIS Needs Assessment H:Trans/Planning/SharonlrIP/2002/TIP No_2002_index.doc