Loading...
HomeMy WebLinkAboutRES 3209 CITY OF RENTON, WASHINGTON RESOLUTION NO. 3209 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO A SUPPLEMENTAL AGREEMENT WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION FOR CONSTRUCTION OF A PEDESTRIAN/BICYCLE FACILITY LOCATED ALONG LAKE WASHINGTON BOULEVARD. WHEREAS, the City of Renton is constructing a pedestrian/bicycle facility along Lake Washington Boulevard from Gene Coulon Park South Access to N. 44th Street; and WHEREAS, the Washington State Department of Transportation is willing to assist in the funding for such construction; and WHEREAS, the current participation by the Washington State Department of Transportation is $744, 256 . 00 of the costs; and WHEREAS, the City desires to supplement the original agreement with $101, 816 . 00; and WHEREAS, it is necessary to document the funding agreement between the Washington State Department of Transportation and the City of Renton; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS : SECTION I . The above recitals are found to be true and correct in all respects . 1 RESOLUTION NO . 3209 SECTION II . The Mayor and City Clerk are hereby authorized to enter into an interlocal agreement and sign all required documents with the Washington State Department of Transportation for funding of the cost for construction of a pedestrian/bicycle facility located along Lake Washington Boulevard from Gene Coulon Park South Access to N. 44th Street . PASSED BY THE CITY COUNCIL this 24th day of June , 1996 . Marily ! I/Petersen, City Clerk APPROVED BY THE MAYOR this 24th day of June , 1996 . Toni Nelson, Mayor Pro Tem A7.;e12 as to f rm: Lawrence J. Warren, City Attorney RES . 532 : 6/20/96 :as . -2-