Loading...
HomeMy WebLinkAboutR-384513PLANT 1 " HIGH IN NURSERY FINISH GRADE 5W,W PLANIN6 P�ML NOT TO SCALE PRUNE DISEASED AND 3ROKEN BRANCHES REMOVE TOP 1/3 OF BURLAP ?" SETTLED DEPTH OF SPECIFIED MULCH -ERTILIZER TABLETS/SPECS SPECIFIED AMENDED BACKFILL �IOMPACT AND WATER THOROUGHLY =IRM NATIVE SOIL MOUND ROOT BARRIER WHEN TREES ARE - ADJACENT TO SIDEWALKS AND RO SPECIFIED PLANTING SOIL UNDISTURBED GROUND 12" MIN. FOR WOOD — STAKES & 18" FOR REBAR FINISH TYPICAL V P,,,, 6 pN TP,,,PLANfIN6 erAiL NOT TO SCALE STAPLE REINFORCED RUBBER HOSE OR VINYL W/16 GA. WIRE TIES PRUNE DISEASED AND BROKEN BRANCHES HOSE & WIRE TIES, SEE DETAIL ABOVE REMOVE BINDING TWINE & TOP 1/3 OF BURLAP. 2" SETTLED DEPTH WITH SPECIFIED MULCH FERTILIZER TABLETS (4-21 GRAM -20-10-5) ROOT BARRIER WHEN TREES ARE ADJACENT TO SIDEWALKS AND ROADS SCARIFY PLANTING PIT SIDES AND BOTTOM 6" DEEP, FIRM, NATIVE SOIL MOUND 2x ROOTBALL WIDTH —IN HEAVY SOILS, AUGER 8"x6' DEEP T� HOLE (OR THROUGH HARDPAN) FILL WITH CRUSHED ROCK. VERIFY GOOD DRAINAGE PRIOR TO PLANTING. fTICA, P�ANfIN6 P�TAL NOT TO SCALE NOTE: DO NOT PIERCE ROOTBALL WITH TREE STAKES BBER HOSE GA. WIRE TIES i AND IES TI ES, /E STAKE(S) MATERIAL AND R LA P TH MULCH QED BACKFILL -TS -S AND BOTTOM MOUND LANDSCAPEE NOTES 1. CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING THEMSELVES WITH ALL OTHER SITE IMPROVEMENTS AND CONDITIONS PRIOR TO STARTING LANDSCAPE WORK. 2. CONTRACTOR SHALL USE CAUTION WHILE EXCAVATING TO AVOID DISTURBING ANY UTILITIES ENCOUNTERED. CONTRACTOR IS TO PROMPTLY ADVISE OWNER OF ANY DISTURBED UTILITIES. LOCATION SERVICE PHONE 1-800-424-5555 3. CONTRACTOR SHALL MAINTAIN AND WATER ALL PLANT MATERIAL UNTIL FINAL INSPECTION BY OWNER. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPUTING SPECIFIC QUANTITIES OF GROUND COVERS AND PLANT MATERIALS UTILIZING ON—CENTER SPACING FOR PLANTS AS STATED ON THE LANDSCAPE PLAN AND MINIMUM PLANTING DISTANCES AS SPECIFIED BELOW IN THESE NOTES. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE QUANTITIES OF PLANTS THAT ARE REPRESENTED BY SYMBOLS ON THE DRAWINGS. 6. SUBGRADE IS TO BE WITHIN 1/10" OF ONE FOOT AS PROVIDED BY OTHERS. ALL PLANTING AREAS TO BE CLEARED OF ALL CONSTRUCTION MATERIAL AND ROCKS AND STICKS LARGER THAN 2" DIAMETER. 7. 4" DEPTH TOPSOIL IN LAWN AREAS AND 6" TOPSOIL IN ALL BED AREAS. TOPSOIL TO BE PACIFICTOPSOILS 3—WAY TOPSOIL OR APPROVED EQUAL. 8. 2" DEPTH OF MULCH IN ALL BED AREAS. MULCH TO BE PACIFIC TOPSOILS PACIFIC GARDEN MULCH OR APPROVED EQUAL. 9. ALL PLANT MATERIAL SHALL BE FERTILIZED WITH AGRO TRANSPLANT FERTILIZER 4-2-2 PER MANUFACTURER'S SPECIFICATIONS. 10. ALL PLANT MATERIAL SHALL CONFORM TO AAN STANDARDS FOR NURSERY STOCK, LATEST EDITION. ANY REPLACEMENTS MADE AT ONCE. A. GENERAL: ALL PLANT MATERIAL FURNISHED SHALL BE HEALTHY REPRESENTATIVES, TYPICAL OF THEIR SPECIES OF VARIETY AND SHALL HAVE A NORMAL GROWTH HABIT. THEY SHALL BE FULL, WELL BRANCHED, WELL PROPORTIONED, AND HAVE A VIGOROUS, WELL DEVELOPED ROOT SYSTEM. ALL PLANTS SHALL BE HARDY UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT. B. TREES, SHRUBS, AND GROUND COVER: QUANTITIES, SPECIES, AND VARIETIES, SIZES AND CONDITIONS AS SHOWN ON THE PLANTING PLAN. PLANTS TO BE HEALTHY, VIGOROUS, WELL FOLIATED WHEN IN LEAF. FREE OF DISEASE, INJURY, INSECTS, DECAY, HARMFUL DEFECTS, AND ALL WEEDS. NO SUBSTITUTIONS SHALL MADE WITHOUT WRITTEN APPROVAL FROM LANDSCAPE ARCHITECT OR OWNER. 11. A PERMANENT FULL COVERAGE IRRIGAITON SYSTEM TO BE DESIGN BUILD. IRRIGATION SYSTEM MUST BE WINTERIZED. 384513 State of Wash inq-ton rcgistered �anJscape Architect Bevin Peterson certificate no 1222 C- p: �.-38N51 Ca111—LOCT" 1725 Westlake Ave. N Suite 201 Seattle, WA 98109 p 206.632.7703 Stephen sonCollective.com Stephenson Design Collective, LLC 2014. These drawings were prepared for "Maplewood Park Community Center" project in Renton, WA. They are not intended for use on any other project. Stated drawing scale is based on 34x22 sheet. sv (D 0 0 rWL No. Date �O01 CD W D � O 3 06.23.13 Pre -Application '—' O w No. Date Z 0 D � O 3 06.23.13 Pre -Application '—' O w 2 o C/) cn .� M 4A n 3 Do rt N '111111111114 No. Date Issue 1 03.10.14 Schematic 2 04.11.14 Consultants 3 06.23.13 Pre -Application '—' O C >� 2 K T O7 ' O V V)171 M 4A n Do D N M Notes and Details Job #. 790 L1.1 Sheet D ^ z z b r y, r� 00 '—' O C >� 2 K T O7 ' O V V)171 M 4A n Do D N M M M cn O D D n C7 mp �C �Cn -a • b �z m� cry �z z M cn 0 D LO b r r� 00 '—' O 44hw�� O � r ' O V V)171 Q 4A LO n Q n Do D