Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRES 2852 A
r
CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2852
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, UPDATING
THE CITY'S SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1992-1997 .
WHEREAS, the City of Renton has heretofore adopted a "Six-Year
Transportation Improvement Program" pursuant to Chapter 7 ,
Extraordinary Session Laws of the State of Washington, and Chapter
195 of the 1961 Session Laws of the State of Washington, and as same
has heretofore been amended from time to time, and such plan and
program having heretofore been duly amended and modified from time
to time as authorized by law; and
WHEREAS, the City Council, after recommendation of its
Planning/Building/Public Works Department, caused to be held a
public hearing thereon on June 17 , 1991, and after notice to the
public as provided by law for the purpose of considering adoption,
modification, and amendments of said plan and program; and
WHEREAS, at such public hearing held on June 17 , 1991 , due
consideration was given to the proposed charges and amendments for
the purpose of updating such plan and program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO RESOLVE AS FOLLOWS:
SECTION I. The City' s "Six-Year Transportation Improvement
Program" and the City' s "Arterial Street Plan" are hereby further
amended and modified, all as more particularly shown on the attached
Exhibits "A, " "B, " "C, " and "D" incorporated herein as if fully set
forth.
1
f
RESOLUTION NO. 2852
SECTION II . The aforestated plan and program, as evidenced
by said Exhibits, shall be and constitute the City' s "Six-Year
Transportation Improvement Program" and the City' s "Arterial Street
Plan, " and same to remain in full force and effect until further
revised, amended, and modified as provided by law.
SECTION III. The Director of the Department of
Planning/Building/Public Works and the City Clerk are hereby
authorized and directed to file this Resolution, together with the
Exhibits, with the Director of Highways for the State of Washington
and as otherwise provided by law.
PASSED BY THE CITY COUNCIL this 1st day of July, 1991 .
Marily Petersen, Ciry Clerk
APPROVED BY THE MAYOR this 1st day of July, 1991 .
r
Earl Clymer, ayor
Approved a to form:
may..
Lawrence J. WarrV, City Attorney
RES . 148 : 6-26-91 :as .
2
1. Street Overlay Program RESOLUTION NO. 2852
2. Oakesdale Ave SW - W 31st to SW 16th St
0 3. North Renton liveable Streets
4. Park Ave NLake Washington Blvd
5. S. 43rd St LID 329)
6. Park Ave N - Bronson Way N to N 10th St
7. Mill Ave S Rebuild - W/1-405 (WSDOT Project)
8. Main Ave S / S 4th St
9. Houser Way Relocated - Sunset Interchange to N 8th St Phase I
0 10. Transportation Demand Management Program
0 11. Walkway Program
0 12. CBD Transportation and Streetscape
0 13. Transit Program
0 14. Houser Way Relocated - Sunset Interchange to N 8th St Phase II
0 15. Bridge Inspection Program
0 16. Traffic Signal Loop Replacement Program
0 17. Traffic Sign Replacement Program
0 18. light Pole Replacement Program
819. Sidewalk Inspection and Replacement Program
20. Arterial Circulation
21. Monster Road Bridge
22. NE 44th St/1-405
23. SW 16th St - West City Limits to Lind Ave SW
24. Sunset Blvd N Project Development
25. S 2nd St/Logan Ave S, Williams Ave S & Wells Ave S
26. SW 43rd St/SR-167 Loop Ramp
0 27. Lake Washington Blvd - N Park Dr to N 44th Prject Development
0 28. Neighborhood Improvement/Beautification Program
0 29. City Gateways Program
30. S 2nd St / Main Ave S
31. Maple Valley Highway - Maplewood Ave SE to
East City Limits (WSDOT Widening)
32. N 4th Blvd - Logan Ave N to Monterey Or NE Project Development
33. Talbot Rd S - S 43rd St to South City limits
0 34. TBZ Project Development
0 35. Missing Links Program
36. Oakesdaie Ave SW - Monster Rd to SR-900
37. Bronson-Houser Corridor Project Development
38. S Grady Way / Rainier Ave S Project Development
39. Miscellaneous Traffic Safety Program
0 40. Guardrail Program
41. S 192nd St / 200th St - SR-167 to SR-515 Project Development
42. S 3rd St / Smithers Ave S / Logan Ave S
43. Monroe Ave NE - SR-169 to Sunset Blvd NE Project Development
44. Duvall Ave NE - Sunset Blvd NE to NCL Project Development
45. SW Grady Way - SR-167 to SR-515
46. 1-405 / SR-515 Project Development
47. SE Puget Or - Jones PI SW to Edmonds Ave SE
48. N Park Or - Lake Washington Blvd to 1-405 Project Development
49. Aberdeen Ave NE - NE 20th St to NE 27th St Project Development
50. Benson Rd S / S 31st St
51. S 3rd St / Rainier Ave S
52. S 2nd St / Rainier Ave S
53. Sunset Blvd NE / Anacortes Ave NE Exhibit A
054. Other Volley Improvements
(See booklet on file)
I Q
1
UTO
r ' 1i
f f • f
n
fll�
j
IT
Amr�
� � .....
�f �4rr:
I ■
` •GC �!y
------------------
E
8
CITY OR AREA—WIDE PROJECTS NOT SHOWN ON MAP
RESOLUTION N O. 2852
NE 44 ti/I-4C5 n - NORTH RENTON LIVABLE S RETS
TRAFFIC:SIGNALS -TRANSPORTATION DEMAND M"GNENT PROGRAM
CITY OF RENTON ' f - CBD TAY PROGRAM
1881 TRANSPORTATION — CBD TRANSPORTATION AND STREEISCAPE
- TRANSIT PROGRAM
PROJECTS IN PROGRESS •® ' t �� — WRC SIGNAL LOOP RUIACBIENT PROGRAM
3. -TRAFFIC SIGN REPLACEMENT PROGRAM
< - LIGHT POLE REPLACIEMENT PROGRAM
- SIDEWALK INSPECTION AND REPLACE PROGRAM
�B s - ARTERIAL CIRCULATION
g t 0 I - CITY GATEWAYS PROGRAM
ECT DEVELOPMENT
- MISSINGLINKS PROGRAM
,® -VEHICLE MAW"ENT SYSTIEM UPGRADE
LEGOW
f r9
1991 OVERiAY AND SLURRY SEAL
ii ui i►v>04#OR® 1991 CONSTRUCTION L eJLJ• D
,..c■a■a■.a OR 21 PROJECT UNDER DEVELOPMENT OR D1 SM e' =IIS
+ c
PARK AVE N/LAKE
WASHINGTON BLVD I'� 6 ,. ♦•
PARK AVE N
�Qf� oo�.f f o o tONSCN
To
16TH
2 L.�C]C�
® s a _
P I(1I�
i oo��l
RAI'; AVE AIRPORT WAY
I IR
SAFETY IMPR04lAETiTS DDD ° ■ s + = f s
E �� + HOUSER WAY REIACATED
+ • 1 SUNSET TD N STH PH4SE t !
• � D
-
�n MAPLE VALLEY WYE
_aal=
MILL AVE S SET)
tooM._ -Do
W 16TH �. I(f]
Da
C.I.TO UND AVE
i
t
■ . . •� MAPLE VALIEY HIGHWAY
■ LEWOOD TO ECL(WSDO
s C i
STY 1 6TH TO SW 31 ST ■ L t a "' •,
6 'I
t � f 2�?t •
A !!
• a + E
M S 43RD WIDENING
• I UD 329HEARING
`I-
sw 43RD I ADOPTED
RESOLUTION
S 192ND/S 200TH EXHIBIT 'C'
SR-10 TO SR-51`' !
I
ARTERIAL STREETS 1991
LEGEND,
Y PRR4CIPAL ARTERIAL
V�� O�
....... WROR ARTERIAL
....... COLLECTOR ARTERIAL
L-AR
�l sa
st
i
LAKE WASHINGTON
� 4
46
im
t
2ECK ' f
11 '
Cz
® 1 •4Y v . 42
f
• 2 •oe --
., 3 a82
18 S8 m
y 2
RUA r 13 g 8
� 5
17
4 6 g
'I 33
29
71
31 ♦�
3o c P
4 2
73 .
F
SII t 5 ar�,r»n
4 4 i :.iCne.0."® wW:'�`•'b°':..�„v..w �"aiw..o°':....`d
:i �u'Y„'�r�:�s b.-.b umm.►......o °'. ��..i�:s.n�'°"vu w
��1. A •b�j ltw.�.IUM 4.X
.n... Zu K
m' w •..m x/w� R n.m w�M;wu M. 1 Y 1-.� ..M��,
- nu cwy�y iEwfem 4ww.w.ryM w
°.. M fin.t .n. .v
~ UYs a°lmwmw a
mm—.—l� Ilmlu'In �1.
M °��n./n[�oniw eirR �
.V 11mM.
EXHIBIT D'
IF.ARINO—
ADOPTED-_-- --_--
Af{OLUT"
t
t
� I SIX YEAR TRANSPORTATION
� IMPROVEMENT PROGRAM
1982 THRU 1887
1
1
Y �J
1 II ♦ NT
ayu 'y
1
� HEARING: JUNE 17 1991
ADOPTED _ JULY 7 1997
� RESOLUTION: 2852
Table of Contents
SECTION ONE SIX YEAR TRANSPORTATION IMPROVEMENT MAP
TIPMap............................................................................................................... 1
Indexto TIP Map................................................................................................. 2
SECTION TWO PURPOSE OF SIX YEAR TIP
MissionStatement.............................................................................................. 3
Purposeof Six Year TIP...................................................................................... 4
SECTION THREE DEVELOPMENT AND PRIORITIZATION OF SIX YEAR TIP
Development of Prioritization of Six Year TIP .................................................... 5
Infrastructure Projects and Programs....................................... 7
Multi-Modal/Transportation Demand
' Management Projects&Programs........................................... 7
Neighborhood Protection/Livability Projects&Programs..... 7
Economic Development Projects&Programs......................... 8
Operations/Safety Projects& Programs................................... 8
SECTION FOUR SIX YEAR TIP FUNDING SOURCES
TotalProject Funding ......................................................................................... 9
Funding Sources
Business License Fee................................................................. 10
' Vehicle License Fee.................................................................... 11
GrantsIn-Hand ........................................................................... 12
GrantsProposed ........................................................................ 13
L.I.D.'s Formed ........................................................................... 14
L.I.D.'s Proposed ........................................................................ 15
MitigationIn-Hand ...................................................................... 16
' Mitigation Proposed ................................................................... 17
Other........................................................................................... 18
Unfunded .................................................................................... 19
1992- 1997 Summary of Funding Sources........................................................ 20
' SECTION FIVE SIX YEAR TIP PROGRAMS
Six Year TIP Project Listing ................................................................................ 21
TIPProjects................................................................................. 22-75
APPENDIX
Six Year TIP Abbreviations&Acronyms ............................................................ 76
i�
i
mr
•. • .
ice..• "' - `..
a \
OEM wNit
a -
ISI
ot
�\"t0'
I \ �
�-- Ir L
y _ f"
` -tti —T'—fes•.• ,, � ,� ��
1
Section One
Map Index to Six Year TIP
TIP
0 1 Street Overlay Program
2 Oakesdale SW-SW 31 st to SW 16th
0 3 North Renton Livable Streets
4 Park Ave N/Lake Washington Blvd
5 S 43rd St(LID 329)
6 Park Ave N-Bronson Way N to N 10th St
7 Mill Ave S Rebuild W/1-405(WSDOT Project)
' 8 Main Ave S/S 4th St
9 Houser Way Relocated-Sunset Interchange to N 8th St Phase I
0 10 Transportation Demand Management Program
0 11 Walkway Program
0 12 CBD Transportation and Streetscape
i 0 13 Transit Program
0 14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II
0 15 Bridge Inspection Program
0 16 Traffic Signal Loop Replacement Program
0 17 Traffic Sign Replacement Program
0 18 Light Pole Replacement Program
' 0 19 Sidewalk Inspection and Replacement Program
0 20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th St/1-405
23 SW 16th St-West City Limits to Lind Ave SW
24 Sunset Blvd N Project Development
25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S
26 SW 43rd St/SR 167 Loop Ramp
0 27 Lake Washington Blvd-N Park Dr to N 44th St Bike/Ped Trail Project Development
0 28 Neighborhood Improvement/Beautification Program
0 29 City Gateways Program
30 S 2nd St/Main Ave S
31 Maple Valley Highway-Maplewood Ave SE to East City Limits(WSDOT Project)
32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development
33 Talbot Rd S-S 43rd St to South City Limits
0 34 TBZ Project Development
0 35 Missing Links Program
36 Oakesdale Ave SW-Monster Rd to SR 900
37 Bronson-Houser Corridor Project Development
38 S Grady Way/Rainier Ave S Project Development
0 39 Miscellaneous Traffic Safety Program
0 40 Guardrail Program
41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development
42 S 3rd St/Smithers Ave S/Logan Ave S
43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development
' 44 Duvall Ave NE-Sunset Blvd NE to North City Limits Project Development
45 SW Grady Way-SR 167 to SR 515
46 1405/SR 515 Project Development
1 47 SE Puget Dr-Jones PI SW to Edmonds Ave SE
48 N Park Dr-Lake Washington Blvd to 1405 Project Development
49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development
50 Benson Rd S/S 31st St
51 S 3rd St/Rainier Ave S
52 S 2nd St/Rainier Ave S
53 Sunset Blvd NE/Anacortes Ave NE
0 54 Other Valley Improvements
2
it
SECTION TWO
1
CITY OF RENTON MISSION STATEMENT
1
-o
The City of Renton, in partnership with
1
residents, business, and government, 1
is dedicated to:
* Providing a healthy atmosphere in which 1
to live and raise families,
* Encouraging responsible growth &
economic vitality,
* Creating a positive work environment;
Resulting in a quality community where
people choose to live, work, and play.
_ 1
� 1
� 1
SERVICE
INTEGRITY
1
3 1
Section Two
CITY OF RENTON
' SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
PURPOSE
o Mandated by State law
' o Multi-year work/funding plan for development of the
arterial street system
o Required for State and Federal funding programs
o Used to coordinate transportation programs with
other jurisdications and agencies
o Meets City of Renton Mission Statement
r
o Reflects involvement by citizens and elected officials
' o Vital Part of Planning Under Growth Management Act
I
1
' 4
Section Three
DEVELOPMENT AND PRIORITIZATION OF THE SIX-YEAR TIP
The yearly update of the Six-Year Transportation Improvement Program is part of an
on-going process intrinsically linked with the development of the City's Capital
Improvement Program,with various state and federal funding programs and with
regional/inter urisdictional planning and coordination processes.
Projects are developed and prioritized based on both specific goals to be achieved by the
program and on general programming considerations.Those general programming
considerations are:
Planning. How,on both-a local and regional level, a project fits with or addresses
identified future transportation goals, demands and planning processes must be ,
evaluated. This is strongly influenced by ongoing land use decisions.
Financing. Many projects are dependent on acquisition of outside grants,
formation of LID'S or the receipt of mitigation funds. Prioritization has to take into
account the peculiarities of each of the various fund sources and the probabilities of
when and how much money will be made available.
Scheduling. If a project is interconnected with, or interdependent on, other
projects taking place this is reflected in their relative priorities.
Past Commitments.The level of previous commitment made by the City in terms
of such things as resources, legislative actions or interlocal agreements also must be
taken into consideration in prioritizing TIP projects.
In addition to the general considerations discussed above, there are five specific project
categories through which the TIP is evaluated and analysed.They are:
o Preservation of Existing Infrastructure
o Multi-Modal and Transportation Demand Management
o Neighborhood Protection and Livability
o Economic Development
o Operations and Safety
These categories not only provide a useful analysis tool,but also represent goals to be
achieved by the transportation program. These goals have been distilled over a two-year
period in an effort to reevaluate the City's transportation program and to respond to ,
local input from citizens and elected officials and to new state and federal legislation.
5 ,
1
' Taken as a whole, the five categories provide a framework through which projects can be
evaluated both individually and as part of a strategy that seeks to meet and balance the
transportation needs of Renton during a time of heavy growth, funding limitations and
increasing environmental concerns.
j 1 Although each project can be identified with an important concern that allows it to be
classified into one of the five categories, most projects are intended to address and are
developed to be compatible with multiple goals.
PRESERVATION OF THE EXISTING INFRASTRUCTURE is a basic need that must
1 be met by the program. The Mayor, City Council and Citizens Transportation Advisory
Committee have all addressed the importance of sustaining strong programs in this
project category.The state Growth Management Act also requires jurisdictions to assess
and address the funding required to maintain their existing transportation system.
MULTI-MODAL AND TRANSPORTATION DEMAND MANAGEMENT(TDM)
involves projects and programs oriented toward "moving people" through a balanced
transportation program that involves multiple modes of transportation and provides
alternatives to the existing heavy reliance on the single occupancy vehicle (SOV).
Included are facilities that serve pedestrians, bicycles and transit services and programs
that promote the use of high occupancy vehicles (HOV's) and reduce the numbers of
SOV's. The State's new Clear Air and TDM legislation have added momentum to
regional efforts to promote these transportation elements.
NEIGHBORHOOD PROTECTION AND LIVABILITY consists of projects that have
been developed with major emphasis on addressing community quality-of life issues by
improving and/or protecting residential livability while providing necessary
transportation system improvements.
ECONOMIC DEVELOPMENT projects and programs involve areas where
transportation improvements are necessitated by new development that is taking place.
Thus, a major source of local funding for these projects is projected to come from
mitigation payments and LID's financed by developers building in these areas.
1 OPERATIONS AND SAFETY projects and programs are developed through on-going
analyses of the transportation system and are directed mainly toward traffic engineering
concerns such as safety and congestion. Projects are identified not only by analysis of
traffic counts, accident records and geometric data, but also through review and
investigation of citizen complaints and requests.
On the following two pages are tables that display and summarize the six-year funding
plan broken out in accordance with the five categories.
6
Section Three '
o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 a : 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O O O N O CO 0 0 0 0 0 0 iGT:
O !� p o
Z} O O O O O C O r' :::zLO 0 MN N Sim V::; Cl) (D Cl) N N W
C: 1- � N tf� O M M 00 LOO, n N M f- "Cr N 4r3:
04
N d: :
O
O
O O O
O
O O '�
if` O
O
O
O O
O
O O
O
O O O
O O
O
O O
O
O O
O O
>' O
O O
O O
O ;
s> O O O
O
O O
O O O
O
O O O :
O O GT:
O
O O
0 0 0 0 0 0 0 .-0 LO
Lr) O CO (n p > «+: to r O
N to (D O Cl) Cl) 3` 00 N N (D O O CO W CO
M M (D N N
I- r� N M Cl) N v N et:
Cr) M fin' '- - rf CO r ft«
V.
O O O O O O5:
O O O O "£S:
O C3
i O p O
>: O O
O
O O
O
O
O O
h(�}:; O O O O C3
- Ci Ci Ci 0 0
In O O O
tt N N N r +r»; r: N to N : :r;
Y::;
r
O O O
o:; O O
O O
O O
0
0 0 0 0 0
0 0 C C 0 0 ::
< �i>.
uS o 0
o u�:
(n o
to O O O :: (p;: N t�
N N N r tf? ,:: N t(y O pp :: iii::t
.- it-::
O >:
:::>::> ::s:::::::: O O O
O O O Q {{}}
O O O O O O
O (� a O O O
1► :E: O o O C3i
0 0 0 0 0 0 O :�: 0 0 0 �3:
O
O
O CS:
• I 0 0 0 0 0 0 O � Q :::::::i::i ;i:i; -
W L o 0 ao oh ,`� M:
cod o u5 0 L o o L
:.'`r. cC N N N r In r, N t C) o �`'s r•; LO (O
ct CO cD (D:
r
O '�f O p
O O O C�
U `:'
0 0 0 0 0 0 O O O O
:`;:i O O O O W :<:: :<;:< p
cc
0 0 0 0 0 0 0 ': :i::::::::i:::C -. ........ N 0 0 0 0 CV::
a o Ci 0 0 0 0 Ci 0 W o 0 0 0
0 0 ori o LO i 0 0 0 0 Cs '' Lri o 0 o tt5: :::'. - _ _ _
N N N r O (O lt7 y«. N In O In LtT: '`%.ii:r•. r N :
w ..: r? a .::: C r
N
r eic::
Q '`'.
O
O
O
is
O
O
O
O i
0 0 p
O O CV, O ` O O
0 0 0 0 0 :: pp.
<: O
O O O
o O
O O
O O
O O
O
O CU.
O
O O -
W
0
- Q pppp Qi
LO 0
0
"` qt N N N o Cl) In i:. z8::>:;; -:: N Ln O (D 3:a ": pp
r` O
:: ::::<:::>::<:<:: N
M
CL
:::>::>:
2
W o 0 o O 0 0 0 0 0 0
0 0 0 0 0 0 0 W >:' o
0 0 0 0 0 o cis:
0 0 0 o a o o : a 0 0 0 0
O O O O GT, O O O O O O O
1
- - - Z - - - pp- U ?:":i`.:. : ltd O Q)
►� N N N r O t� O (OD t0[) (D cT?' ti M ;
T Q (D N M
O O O O O o 0 o c
0 0 0 p 0 0 0 0 0 0 0 0
o o 0 0 0 po 0 0 0 0 0 0 0
W 0 r y 0 0 0 t?a O C (� rn v v
2
LO
M .. i3 C~7 N r` M N F
O
m
m —
(^ :ii:.:: Y —
^ v ':�:::::i:::::....
I.L
L
O 'ii
E
CL
;' L L
LA Y ... L Y
00
(SS L dQ)
L COm L ::::::
� E Z Z
CL
U
L Y
J
i >s
C (n
O O
L
E#<`N'
: :::::::
(C � C) C)
o _ U E Y
Z o
Y
L RS
U) Cz —
d �
d
+:
.LJ � Y
O l
O7 �
Y
'O O
— O E ::;i;:;ii,: ::::: c C O %:ii2CO
— to to m G ?: >'.
c� :<<v tts ° Z Z m c c c \ d
[3; d Q Q — m L L E — J O O U O
/� 'O :>>::: -. C RS O viii�3>: .. .;
.W >, O 4) fl- O • O C to 'd (n (n >.
U Cr- ��( Cl)M O >»:: O t`�•aa� O Y ;::z:::: Gt: 2 — O C
(C O 1. W RS L is ''' L V• Y :.:>:iM; O / L
# D:
E o
z J o
a a> - m >.
cn a> � CL J � CL
> U
L
L —
C
L
is D:
fn —
,
— L :ii
0)
O N
a Z Z
Z
4.
Y
Y C'3
O N
Y
•D >: fn -
� U
U (n
U -
L
z
..,, O L SC L
� � •— — m is —
C
L L d
n> O CO (0 RJ O — O O .O
L •—
C6 O
2 n
L (�
::. L L J l� is;:
L L .— Z
Cn m H I— J Cn 2 F- C3 in z :;:;..
GL r In CD 1- CO O r M O O r Cl) N N Q, M (D I� O r N (OV M
r N COr-
r
7
Section Three
0 0 0 0 0 0 0 0 0 0 Cn 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 ':.[ 0 0 0 0 CO o 0 0 0 0 0 0 o C o
O o 0 0 0 0 �,: tl- 0 0 0 0 0 0 0 0 0 0 0 0 0 k
r, C C o CO o L6 Ui cfl o C 0 0 pp
i. O Lo N LO 0 ton SJD: f3 N CO CD O CO CO r Ln cod M Ln CD ct
4x }} T:
CO
C] O O O O Cn C C 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 COO O O O O O O O O O O O O O O
s Gi`' i>•'?:i 0 0 0 0 0 0 0 0 0 O O O O O O O O O O
0 0 0 0 0 0 0 0 0 t` O O O 0 O O
0 0 CV U) 0 0 o 0 0 ti 0 0 0 CA O Ln Ln (D O Q O O O Q O
»� N N CD O M M r- Ln v' O CO � �+ C) to C) 1-
:: Ln Ln O �- Ln to v 0 ..:.... r 0 M T C-4
r N N .
a:... .: � M CO N O O <.. M C N
O O
C)
O O
O :: p ;p:
N E {{{� 2CfY
N � Sit;
(D
O :; : O 0: : :
O C ?:
LOO C :
C6
y " o o :;fir; 0 0 0 oC Vii:
0 C 0 0 0 0 0 ;
C - :::- �et
C 04
o C 0 0 o 0 C ;Cs;
D 0 0 0 0 0 o o O o 0 0 0
�j
0 0 0 0 0 a "`''> O O o 0 0 0 0
Q , C) CO 0 LO O
O O O O �3JI? r Cl)
C ua
M r Ln O r r
� :::�� O N
W
U o 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
o 0 0 0 W 0 0 0 0 0 0 0 0 0 0 0
0 A: i> i 0 0 0 0 0 0 _
Co C) 0 p 0 0 p p 0 IR o
LO 0 0) Ci{7): .- N O CO to M c0 CD N Cn W tD
r r ii7; :. N N r N
W >?< Cr) :
C :>:
C O
C) O O O 0 0 :
�! to CA Ln Lti N O O
isLO
N
U') Cn 3 N M
1 z r
U � aj O O O O O C1 F� by o C 0 0 C) O O O O O
O O O O O 0 0 0 0 M 0 0 0 0 0
C 0 0 0 0 0 0 C. 0 0 0 0 C1� O O O O O
ZZS O O O Ln to A W .+ N Cp O M O Ln to (D O
Q is O O CD C <L CO T O CO CO I� to
VM O CV ;
:::•:>
W :;:; m o J Ln
U
iiCr.DJ
CU. LC)
7
C Z C
'•Od
rCn
ww ''^^
Cr
CLO
y 2 O poO ZC n y Qn CD ) ZO O O O N
O
(D i
U LT i CD
»: .. —
Cn U
`•'�'i r J d � a.. N
i
'^ CU T
Cl) Cn > r T O Q s:::: i/ C U O U .� (� i (n �/ RS
U O N >' L).- N — U r cn C CCS i C Lr \ ` C
" — >:;>:>:N; L Ln O C p — CA U Cn U Q : ::
Q J Cn U y W > ? p;: M «• O i CCS _ _ O () L U) ' rte-
':s3: U tll Z L C CL Cu
,- L' i
Cts C� O N O O fscc
\ L Z J d j C >^ t`C CO Z Cts Cr C ., :.
N o :. CD
z3 a a� M a m = v, \
rZ \ a L v — -a Cts (7 y � >:
U CD � tD <=: C �t C CO O U L � C
?>: ,C Q C 0) W C C y O (� COM N
N O L r::<: N CSS .- 0 0 7
Cv W O N . —
CSS fTl �Q r O a tt
d O »'>: <X UJ Z Cn Cn CO CO CD Cn Cn D CA — ) Cn Cn CA
O U Cn E U) Q
a�:
'^ C O
N
M
T YI
t` C� N
M
CC' O
to w.c.
Ln m
N N Cr) �7 r CO t` Cn rl ,. lf7 C� N N N N M M M M Cl) M v Ln Ln Ln U) Q:
� N M t � �r '�7 Ln Q: �:
..............
8
s s:s
•� a •• •e• ••• •e• •e• -oe ee• •e• ••• e•'t•• •of 1.1 ••• te• Me e11
©�. - •. - • • f1 •e• • ••• ••• • •:t 1•• •1111 • 1e1 •1e •11
�'. • • •11 tee• �-- • 111 • 1••
�. •.rk N-Bronson to • •• ••• • ••• • :e/ ••• •• ••• :• :1•
E ''• • •• et1 : ••• --- • e11 • •••
eet 8.1 -- ••teffa •"11 t 1•e
M. - • • ••• •• •t• 1• ••• .• f•• f•1 • •t•
m • •- • • •• •e• ••• •tt 1e• /f/ e•• : ••• ••1
m • •• 8 eel • ••• t fee t •1t t 1e• 1 e11 • 1•• a e•1 • r•e
® .• • ••- ee b1• •• ••/ • ••• a /•e • ee•e
® •• : MOM 1•• --- t1 e•e •• ••• ••• •••
moulTs"Tol now,Mm
m _ • '-• - • • ••e • •e1 • /f1 a /•• • /f• • ••• • ••• f ••1
• •• '-• - • ••• ee• t1• lee •1• e11 a111 • •-t1
m • • '-• - • •e• 1 111 a ••• • te• • ee• 0 0 • t•• Fm 11e mou • •tt
© • '•_• L•••- • 11• •• ••• t• ••• •• ••• �•• •1• ••• 11• •e• ••• � •• 111 e• 11•
® • • •• ••• • ••1 • •et •• 1e• • ••• • e•4
m • •• 1• •t• ---- e• 1e1e1 •11
Wor.11
®. • •• :• 1111 ••8 • 1 1f• • • •11 :11eJ
• •1• • ••• e11 t 1
©' • e•1 11e •1t •t1 -- • ••1 • •e1
• ••• ----- ••• NEC 111
® _• - • • • ••• ---_�� ••• fe1
® ••. • • - / ee• • •t• ---�- :/ /•• :• 111
© •• • • -- • •t• •/ •/• --- • 111 MIR a •••
C • - •- - •• - ••• ------ ••• I./
® • • ••. ee• /• et• // •i/ t• e•e 0••• ••• 0 a••• fJ�f
©. �_ •. - • - • ••• 1 e11 • •f• •• •e• eft :•• •f• :• 111 • / etf /-•f
®: • • • • •• • 11• ----�- 1 •e1 aee•
IMF.WCTPr.PYA: 1 tee .t t11 --�- •t 1•• •• •t1
®` • • •ee 1 •t1 1 111 t e•fNIEMENt f•e /1 •1t8• •e8
m • _ •• ee a •ee • e1• 1 et• t t1• • /•• t 1•f •e 1•t
m • 11 • • • tte Ie1 ---�- 1 ef• No Wel t1
m • •- •• • --- t •e1 a e1• t1••
m• •- • - • • • • --- 11111 • t ••• • • 1e1
•. • •• -- .• ttf -- .• •••
S • •• -- t e11 1 Itt1lie -
® • - -- •If -- e1e -
e - i-6 i :e1 Bi f It 8 86 a ee •: /�
Section Four
BUSINESS LICENSE FEE SUMMARY
. ....................
.................... X X ...... ......... . ........
................
.................... :>
...............
.................................
...............
.... ....... .......
4
. ......... .......... ....... ............
................................
..................... ..................... . ..
.................Pr ......
...... ......
......T WU
..................... 0:.... .. ........
- T1&-".*".'.'." _`i:.`.,.**'.*'..'j*: .
..............
................. ...... ...... ..... .............. .....
..... .............. ...... , .......d.
............. .. . ...... ............ ............. ............... ...................... ................. ........
1 Street Overlay Prgm 150,000 150,000 150,000 150,000 150,000 150,000 900,000
2 Oakesdale SW 31 to SW 16 100,000
31 North Renton Livable Streets 45,000,
4 Park N/Lk Wa Blvd inter. 70,000 70,000 70,000
5 S 43rd Widening (LID 329) 100,000
, Park N-Bronson N to N 10th 640,000 510,800 150,000 1,300,800
7 Mill S Rebuild-W/1405 47,000 283,000 283,000
8 Main S/S 4th 158,000 22,000 22,000
9 Houser Rel-Sunset to N8th 1 61,000 60,000 19,200 81,000 160,200
10 Transp Demand Mgmt Prgm 60,000 25,000 25,000 25,000 25,000 25,000 185,000
11 Walkway Program 150,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
12 CBD Transp&Streetscape 100,000 40,000 210,000 250,000
13 Transit Program 378,000 50,000 200,000 200,000 450,000
14 Houser Rel-Sunset to N8th 11 30,000 30,000
15 Bridge Inspection Program 50,000 40,000 40,0001 40,000 120,000
16 Traffic Sig Loop Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000
17 Traffic Sign Replace Prgm 20,000 20,000 20,000 20,000 20,000 20,000 120,000
181 Light Pole Replace Prgm 25,000 25,000 25,000 25,000 25,000 25,000 150,000
19 Sdwlk Insp&Replace Prgm 15,000 10,000 10,000 10,000 10,000 10,000 65,000
20 Arterial Circulation 120,000 160,000 290,000 449,000 1,030,000 925,000 885,000 3,739,000
21 Monster Road Bridge 50,000 50,000
22 NE 44th 1405 Interchange
23 SW1 6th-WCL to Lind SW 60,000
241 Sunset N Prj Dev 100,0001
25 S2nd/Logan,Williams&Wells 13,889
26 SW 43rd/SR 167 Loop Ramp 13,300
27 LWB-N Park to N 44th Bk Pd 75,000 50,000 50,000
21 Neigh Improve/Beaut Prgm 70,000 70,000 70,000 70,000 70,000 70,0001 350,000
291 City Gateways Prgm 55,000 55,000 55,000 55,000 165,000
30 S 2nd/Main S 75,0001
31 MpI%fly Hwy-Mplwd SE to ECL 5,000
32 N 4th-Log.N to Mont.NE 50,000 30,000 30,000
33 Talbot Rd S-S 43rd to SCL . 30,000 30,000
34 TBZ Planning Prj Dev 115,000
35 Missing Links Prgm 446,000 200,000 200,000 200,000 200,000 200,000 1,000,000
36 Oakesdale-Monster to SR 900 10,000 10,000
37 Bronson-Houser Corridor 50,000
38 S Grady Wy/Rainier S Prj,Dv, 30,000 30,000
39 Misc:Traffic Safety Prgm 50,000 50,000 50,000 50,000 50,000 50,0001 300,000
40 Guardrail Program 33,150 50,000 50,000 50,000 50,000 50,000 50,000 300,000_
41 S1 92/S200-SR1 67 to SR515 15,000
42 S 3rd/Smithers S/Logan S 30,000 30,000
43 Monroe NE-SR 169 to Sunset 50,000 50,000
44 Duvall NE-Sunset to NCL 50,000 50,000
45 SW Grady Wy-SR1 67 to SR515 60,000 60,000
46 1405 SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
...54...Other Valley I I mpr I ovem,en.ts, ......
........... ............. ......
........................................
....... ......%.......... .......
000 3 8f>D 180000:
x...mwpw -0i
...... k800
Previous Funding + 6-Year Total = 13,355,339
10
Section Four
VEHICLE LICENSE FEE SUMMARY
..... ... .. . ...............
. . ................. ............ ..........
.. ................ .
....................... ..........
'04..
...... ...... ..
............ .... .. .
.. .......
. ...... ..
...... ..
....... ........... ......... .... . .......-...... ..........-.....- .............. ........-..........
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
41 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N 10th 240,000 350,000 50,000 640,000
7 Mill S Rebuild-W/1405
8 Main S 4th 350,000 350,000
9 Houser Rel-Sunset to Nath I
101 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to Nath 11
15 Bridge Inspection Program
161 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm
19 SdwIk Insp&Replace Prgm
20 Arterial Circulation 350,000 350,000 700,000
21 Monster Road Bridge 50,000 50,000
22 NE 44th 1405 Interchange
23 SW1 6th-WCL to Lind SW 60,000 60,000
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28Neigh Improve/Be ut Prgm2 9
9 City Gateways Prgm
X) S 2nd Main S
31
1 Mpl My Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL 300,000 300,000
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S1 92/S200-SR1 67 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SRI 69 to Sunset
44 Duvall-Sunset to NCL
-4 k 5 SW Grady Wy-SR1 67 to SR515
46 1405 SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
"-
............... ......................-......
............................. ......... ............... 35o D00 iso Boas 000 95t3 a» .........
............................................... ...... ......... . .....
..........
.... ........ .........
....................
Section Four
GRANTS IN-HAND SUMMARY
II ...... .......
..........
. ...... .... .. ............................
............
.... . . .... ........ .. . ... . ......
dot
................ . .....
............
.......... ....................
...................................... ...... ... ........
...... ....
1 11 Street Overlay Prgm
2 Cakesdale SW 31 to SW 16
3 North Renton Livable Streets
4 Park N/Lk Wa Blvd inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N loth
71 Mill S Rebuild-W/1405
8M ain S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetsoape
13 Transit Program
14 Houser Rel-Sunset to N8th 11
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
181 Light Pole Replact Prgm
19 SdwIk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th,1405 Interchange 28,336 182,886 182,686
23 SW16th-WCL to Lind SW
241 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells 125,0001
26 SW 43rd/SR 167 Loop Ramp 66,700
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd Main S
31 Mpl\Ay Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCI
34 TBZ Planning Prj Dev
351 Missing Links Prgm
36 Oakesdafe_Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj. Dv.
39 M i so Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515 80,000 120,000 1 120,000
42 S 3rd/Smithers S/Logan S
43 Monroe NE-SR 169 to Sunset
44 Duvall NE-Sunset to NCL
45 SW Grady Wy-SR1 67 to SR515
461 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31 st
51 S 3rd/Rainier S
521 S 2nd Rainier S
531 Sunset NE/Anacortes NE
541 Other Valley Improvements
................ ...... ....... ....................
.......................... .............................. ... .......
W*D36
00
Previous Funding + 6-Year Total = 602,922
12
Section Four
GRANTS PROPOSED SUMMARY
Ik' .:::.. ..... :::>::>::> �'revious::. ..:::..:..:.. >:::>>::<:: S►x Year
?l;993 .:::::. F954... . .:.i 95:<'^ ..... 3 1997: 'ictal;
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16 177,400 1,239,900 1,926,200 963,100 4,306,600 '
3 North Renton Livable Streets
41 Park N Lk Wa Blvd Inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N 10th 579,000 2,559,000 1,504,000 4,642,000 '
7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to Nath 1 992,000 580,000 1,572,000
101 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II 64,000 254,000 813,000 1,131,000
15 Bridge Inspection Program
161 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge 1,050,000 1,050,000
221 NE 44th/1405 Interchange
231 SWI 6th-WCL to Lind SW 1,772,000 1,772,000
r27
Sunset N Prj Dev
S2nd Logan,Williams&Wells
SW 43rd SR 167 Loop Ramp 20,000 619,300 639,300
LWB-N Park to N 44th Bk/Pd
Neigh Improve Beaut Prgm
r32
City Gateways Prgm
S 2nd Main S
Mpl My Hwy-Mplwd SE to ECL
N 4th-Log.N to Mont.NE
Talbot Rd S-S 43rd to SCL
341 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900 275,000 650,000 1,9CC,000 11,900,000 4,725,000
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj. Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192 S200-SR167 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe NE-SR 169 to Sunset
44 Duvall NE-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405 SR 515 Prj Dv 30,000
30,000
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S31st 15,000 91,000 106,000
51 S 3rd Rainier S 44,000 44,000
52 S 2nd/Rainier S 26,000 150,000 176,000
53 Sunset NE/Anacortes NE
54 Other Valley Improvements 1,471,000 5,182,000 4,147,000 10,800,000
::::::>:::
95 0
.....
756 400 4' 900. 711307 : 3,488 f 00 :7 800; 6,t3+#7.i lOiT 3E3;993 900
Previous Funding + 6-Year Total = 30,993,900
13 ,
Section Four
L.I.D.'S FORMED SUMMARY
i?thevit5
1
7 Qtaf......
#'ioJect.'f3TEe .:.).993...; .._ 99d ....::9�5 . ..:...'[x.,.:...:.1997..:. ...,'�......_...
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
4 Park N Lk Wa Blvd Inter.
' 51 S 43rd Widening (LID 329) 2,044,300 1,145,700 1,145,700
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
' 12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm
1 19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th 1405
23 SW16th-WCL to Lind SW
24 Sunset N Prj Dev
25 S2nd Logan,Williams&Wells
26 SW 43rd SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
311 MpI My Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont. NE
' 33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900
371 Bronson-Houser Corridor
' 38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd Smithers S/Logan S
431 Monroe-SR169 to Sunset
1 44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
491 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
51 S 3rd/Rainier S
52 S 2nd Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
.............................................................
tlxai .:::::::::::::::::::.:.:::::::::::::::::::::::::::.:::::::. i.45
Previous Funding + 6-Year Total = 8,190,000
1 14
Section Four
L.I.D.'S PROPOSED SUMMARY
....... ......
...... ..... .
..... ....... ..........
.ip
. ...... .......................................
................. .......................................
............ ..................................... .......
................... .... ......
IN3:.....
..............
. . .... ::u Fig.
... . ....................
.4.
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
4 Park N/Lk Wa Blvd Inter.
51 S 43rd Widening (LID 329)
6 Park N-Bronson N to N loth
7 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th 11
151 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace-Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
211 Monster Road Bridge
22 NE 44th/1405
23 SW16th-WCL to Lind SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp 330,700 330,700
271 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd Main S
31 Mpl My Hwy-Mplwd SE to ECL
32 IN 4th-Log.IN to Mont.NE
331 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
391 Misc Traffic Safety Prgm
40 Guardrail Program
41 Sl 92/S200-SR1 67 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SRl 69 to Sunset
44 Duvall-Sunset to NCL
451 SW Grady Wy-SRl 67 to SR515
46 1405/SR515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st
511 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements 980,000 3,455,000 2,765,000 7,200,000
.......... ............... ................................................ ....... ............... ...............-
...............
................ ....................
..........
......................
.... ........................
... ............
,...i I I.....................
............................... ... ....
.....tow
4 . ......
........... ....
Previous Funding + 6-Year Total = 7,530,700
15
Section Four
MITIGATION IN-HAND SUMMARY
........... ... ........ .. ........ .......... ....................
tar....
...... . .. .....
...........
...........*...... Y
... ..... ...............:
.... .......................... ............
............ ... . ........... ...... ................
..............
..................
. .............
....... ......
............ . ...........
016a:...i. ...........
..........- ......... .,....,
... ....... .... .....
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16 100,000 437,600 262,400 700,000
3 North Renton Livable Streets 115,000 283,200 283,200
4 Park N/Lk Wa Blvd Inter. 121,000 500,000 500,000
5 S 43rd Widening (LID 329) 159,000
6 Park N-Bronson N to N 10th
71 Mill S Rebuild-W/1405
8 Main S/S 4th
9 Houser Re]-Sunset to N8th 1 330,000 51,800 381,800
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th 11
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm
19 Sdw[k Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th 1405 15,664 33,114 33,114
23 SWI 6th-WCL to Lind SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
1 26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk Pd
28 Neigh Improve/Beaut Prgm
29 City Gateways Prgm
30 S 2nd/Main S
:31 Mpl My Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Cakesdale-Monster to SR 900 40,000 50,000 225,000 315,000
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv. 60,000 60,000
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S1 92/S200-SR1 67 to SR515
42 S 3rd/Smithers S/Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR1 67 to SR515
46 1405 SR515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S 31st
1 51 S 3rd/Rainier S
52 S 2nd Rainier S
531 Sunset NE/Anacortes NE
541 Other Valley improvements
..........
...............
talis
..... ...........
............ ........
............................. ...
X, 90
.:::.::.:.:...:::;;.`:;'::`<; ... S. 4
............ .......... 4
Previous Funding + 6-Year Total = 2,783,778
16
Section Four
MITIGATION PROPOSED SUMMARY
-.
a ............
,:.:::.::::::::::::::.:�:::::::.:::::: .::::.�::::::..:...........................IP
.::..
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16 1,612,700 4,553,800 2,276,900 8,443,400
3 North Renton Livable Streets 351,8001 351,800
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S S 4th
9 Houser Rel-Sunset to N8th I
101 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to N8th II
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace-Pgrm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation 1 210,000 400,000 400,000 325,000 365,000 1,700,000
21 Monster Road Bridge 50,000 150,000 50,000 250,000
22 NE 44th 1405 Interchange
23 SW16th-WCL to Lind SW 159,000 479,000 1,772,000 2,410,000
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
261 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve Beaut Prgm
29 City Gateways Prgm
30 S 2nd Main S
31 Mpl My Hwy-Mplwd SE to ECL
321 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900 467,000 1,966,000 1,967,000 4,400,000
37 Bronson-Houser Corridor
38 S Grady Wy Rainier S Prj.Dv. ,
39 Misc Traffic Safety Pgrm
40 Guardrail Program
41 S192/S200-SR167 to SR515
42 S 3rd/Smithers S Logan S
43 Monroe-SR169 to Sunset
44 Duvall-Sunset to NCL
45 SW Grady Wy-SR167 to SR515
46 1405/SR 515 Prj Dv
47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405 '
49 Aberdeen-NE 20th to NE 27th 40,000 40,000
50 Benson Road S S 31st
51 S 3rd/Rainier S
52 S 2nd/Rainier S
531 Sunset NE Anacortes NE 86,000 192,000 278,000
541 Other Valley Improvements
4fs3fis 56fl,800 2 a7�i,7D0 :6 867 8()(3 3 143 900 2 X91 000:: 2332 0� 17 873,200
..
Previous Funding + 6-Year Total 17,873,200
17
Section Four
OTHER SUMMARY
..... . . ..........
............ ........... ..................
TIP
X
...................... ..... X
.............
fX9
............T ............. ... ...
..
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
41 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N 10th
7 Mill S Rebuild-W/1405
8 Main S 4th
9 Houser Rel-Sunset to N8th I
10 Transp Demand Mgmt Prgm
11 Walkway Program
12 CBD Transp&Streetscape
13 Transit Program
14 Houser Rel-Sunset to Nath 11
1 15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
18 Light Pole Replace Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation
21 Monster Road Bridge
22 NE 44th 1405
23 SW16th-WCL to Lind SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28 Neigh Improve/Beaut Prgrn
29 City Gateways Prgm
301 S 2nd Main S
31 MpI My Hwy_Mplwd SE to ECL
32 N 4th-Log.N to Mont. NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
36 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj.Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41 S192/S200-SR167 to SR515 35,000 35,0001
42 S 3rd/Smithers S/Logan S
43 Monroe-SR1 69 to Sunset
1 44 Duvall-Sunset to NCL
45 SW Grady Wy-SR1 67 to SR515
46 1405 SR515 Prj Dv
1 47 Puget-Jones to Edmonds
48 N Park Dr-LWB to 1405 30,000 30,000
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S 31st
1 51 S 3rd/Rainier S
52 S 2nd/Rainier S
53 Sunset NE/Anacortes NE
54 Other Valley Improvements
........... ... ..... ..........
............
............
.
............I..............................................
.....................................
...................
..............
..............
xx
................
Previous Funding + 6-Year Total = 65,000
18
Section Four
UNFUNDED SUMMARY
................
::::.:::;::>:::>::>::::>::>;::>::»::>:::<:;
..................%.......... ....
..
... .............
.............. ........................................................
...... ..... .
....
.......................
....
.. .....
........ 9 . T
. .. .....
......
1 Street Overlay Prgm
2 Oakesdale SW 31 to SW 16
3 North Renton Livable Streets
4 Park N/Lk Wa Blvd Inter.
5 S 43rd Widening (LID 329)
6 Park N-Bronson N to N 10th 360,200 360,200
71 Mill S Rebuild-W/1405
81 Main S/S 4th 90,000 90,000
91 Houser Rel-Sunset to N8th I
101 Transp Demand Mgmt Prgm
ill walkway Program
121 CBD Transp&Streets�-_ape
13 Transit Program
14 Houser Rel-Sunset to N8th 11 34,000 254,000 812,000 1,100,000
15 Bridge Inspection Program
16 Traffic Sig Loop Replace Prgm
17 Traffic Sign Replace Prgm
181 Light Pole Replace Prgm
19 Sdwlk Insp&Replace Prgm
20 Arterial Circulation 1 451,000 170,000 621,000
21 Monster Road Bridge I
22 NE 44th/1405
23 SWl 6th-WCL to Lind SW
24 Sunset N Prj Dev
25 S2nd/Logan,Williams&Wells
26 SW 43rd/SR 167 Loop Ramp
27 LWB-N Park to N 44th Bk/Pd
28. Neigh Improve/Beaut Prgm
291 City Gateways Prgm
301 S 2nd/Main S
31 MpI\Ay Hwy-Mplwd SE to ECL
32 N 4th-Log.N to Mont.NE
33 Talbot Rd S-S 43rd to SCL
34 TBZ Planning Prj Dev
35 Missing Links Prgm
361 Oakesdale-Monster to SR 900
37 Bronson-Houser Corridor
38 S Grady Wy/Rainier S Prj. Dv.
39 Misc Traffic Safety Prgm
40 Guardrail Program
41. Sl 92/S200-SR 167 to SR515
r42
S 3rd/Smithers;S/Logan 5 1DO,000 1DO,000
Monroe-SR169 to Sunset
Duvall-Sunset to NCL
SW Grady Wy-SR167 to SR515 200,000 200,000
1405/SR515 Prj Dv 60,000 60,000
471 Puget-Jones to Edmonds 100,000 910,000 1,010,000
48 N Park Dr-LWB to 1405
49 Aberdeen-NE 20th to NE 27th
50 Benson Road S/S 31st 5,000 19,000 24,000
51 S 3rd Rainier S 10,000 10,000
52 S 2nd Rainier S 10,000 48,000 58,000
531 Sunset NE/Anacortes NE
541 Other Valley Improvements
...........
.................
.......... ........
...........
..................... ...........
................ xx��V �W, ODOX3300
74�2W.1:1.j,472= 2
Previous Funding + 6-Year Total 3,633,200
19
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
SUMMARY OF FUNDING SOURCES
r
Period
' 1992>:>::::::<:>::»:::..39H3...... .......399 1195 1396 1997
:: ITEH4:::::........:............ .:Perisx3:TctaT
EXPENSES:
Planning/Project Development 1,050,000 410,000 290,000 180,000 70,000 30,000 70,000
Precon Eng/Admin 7,800,000 1,429,000 1,592,000 1,028,000 2,486,000 995,000 270,000
r R-O-W (includes Admin) 9,403,000 1,390,000 4,361,000 191,000 2,081,000 1,190,000 190,000
Construction Contract Fee 55,838,400 3,077,900 4,374,300 16,129,700 6,438,500 13,661,500 12,156,500
Construction Eng/Admin 4,203,600 249,100 331,500 1,302,500 434,500 1,002,500 883,500
Other 162 700 92 700 14 000 14 000 14 000 14 000 14 000
TALE]C .... .............. .:_.. ::.:::::. �........:.:::::: .::r ..::::::::..•....... .:: :.. :.::::::..:�.....:.:.:.....
SOURCES OF FUNDS:
1/2 Cent Gas Tax 1,740,000 290,000 290,000 290,000 290,000 290,000 290,000
r Business License Fee 10,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000 1,800,000
Vehicle License Fee 2,100,000 350,000 350,000 350,000 350,000 350,000 350,000
Grants In-Hand 302,886 120,000 182,886
Grants Proposed 30,993,900 756,400 4,899,900 7,907,500 3,488,100 7,895,000 6,047,000
L.I.D.'s Formed 1,145,700 1,145,700
L.I.D.'s Proposed 7,530,700 330,700 980,000 3,455,000 2,765,000
Mitigation In-Hand 2,273,114 1,590,800 457,314 225,000
Mitigation Proposed 17,873,200 560,800 2,577,700 6,967,800 3,143,900 2,291,000 2,332,000
I Other 65,000 35,000 30,000
Unfunded 3 633C200 375,000 974 2004 000 81
1 72 200 0
84870Cf x0962800 ]$885,200 1:4' 41 Ma :168932306 73,584
r
r -
1
r
r
r
r
i
r
File::TIPCIP_A.XLS 20 Printed 7/3/91 at 11:40 AM.
Section Five
Six Year TIP Project Listing
TIP
# Page
1 Street Overlay Program 22
2 Oakesdale SW-SW 31st to SW 16th 23 '
3 North Renton Livable Streets 24
4 Park Ave N/Lake Washington Blvd 25
5 S 43rd St(LID 329) 26
6 Park Ave N-Bronson Way N to N 10th St 27
7 Mill Ave S Rebuild W/1-405(WSDOT Project) 28
8 Main Ave S/S 4th St 29
9 Houser Way Relocated-Sunset Interchange to N 8th St Phase 1 30
10 Transportation Demand Management Program 31 ,
11 Walkway Program 32
12 CBD Transportation and Streetscape 33
13 Transit Program 34
14 Houser Way Relocated-Sunset Interchange to N 8th St Phase II 35
15 Bridge Inspection Program 36
16 Traffic Signal Loop Replacement Program 37
17 Traffic Sign Replacement Program 38
18 Light Pole Replacement Program 39
19 Sidewalk Inspection and Replacement Program 40
20 Arterial Circulation 41
21 Monster Road Bridge 42
22 NE 44th St/1-405 43
23 SW 16th St-West City Limits to Lind Ave SW 44
24 Sunset Blvd N Project Development 45 '
25 S 2nd St/Logan Ave S,Williams Ave S&Wells Ave S 46
26 SW 43rd St/SR 167 Loop Ramp 47
27 Lake Washington Blvd-N Park Dr to N 44th St Bike/Ped Trail Project Development 48
28 Neighborhood Improvement/Beautification Program 49
29 City Gateways Program 50
30 S 2nd St/Main Ave S 51
31 Maple Valley Highway-Maplewood Ave SE to East City Limits(WSDOT Project) 52 '
32 N 4th Blvd-Logan Ave N to Monterey Dr NE Project Development 53
33 Talbot Rd S-S 43rd St to South City Limits 54
34 TBZ Project Development 55
35 Missing Links Program 56
36 Oakesdale Ave SW-Monster Rd to SR 900 57
37 Bronson-Houser Corridor Project Development 58
38 S Grady Way/Rainier Ave S Project Development 59
39 Miscellaneous Traffic Safety Program 60
40 Guardrail Program 61
41 S 192nd St/S 200th St-SR 167 to SR 515 Project Development 62
42 S 3rd St/Smithers Ave S/Logan Ave S 63
43 Monroe Ave NE-SR 169 to Sunset Blvd NE Project Development 64
44 Duvall Ave NE-Sunset Blvd NE to North City Limits Project Development 65
45 SW Grady Way-SR 167 to SR 515 66
46 1405/SR 515 Project Development 67
47 SE Puget Dr-Jones PI SW to Edmonds Ave SE 68
48 N Park Dr-Lake Washington Blvd to 1 405 Project Development 69
49 Aberdeen Ave NE-NE 20th St to NE 27th St Project Development 70
50 Benson Rd S/S 31st St 71
51 S 3rd St/Rainier Ave S 72
52 S 2nd St/Rainier Ave S 73
53 Sunset Blvd NE/Anacortes Ave NE 74
54 Other Valley Improvements 75
. 21 ,
i
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
1
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317;102
1 Proj: 12108
Rank: 1
PROJECT TITLE:
Street Overlay Program
DESCRIPTION:
Annual program for repairing and resurfacing existing roadways, operating the City's Pavement Management System and
providing data for Arterial Deficiency Ratings.
JUSTIFICATION:
Overlay and slurry seal of streets provide for improved driving surface and are highly cost.effective ways
of avoiding expensive-repairs and reconstruction. The computerized Pavement Management System and video inventory
of existing roadway conditions greatly improve the efficiency of the Overlay Program.
STATUS:
Yearly program.
i
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 2,640, e. 2,640 000 1,740,000 900,000
Spent Through h 1990
...................... ...........
1991 Budget + ...
Carry Over: `'`ii3fied -
.................
Remaining Cost: 2QO
Period
.......:.. ..:.::: : :.
::::::.::::.::.:::::::..ITEM.::......:...................Pew:. .a�;: .;::<.;::.;�99*........ ........�. ::.:::.,:.:.:::.
EXPENSES:
1 Project Development
Precon Eng/Admin 270,000 45,000 , 45,000 45000 45000 45,000 45,000
R-O-W (includes Admin)
Construction Contract Fee 2,100,000 350 000 350,000 350,000 350,000 350,000 350,000
Construction Eng/Admin 270,000 45,000 45,000 45,000 45,000 45,000 45,000
Other
T...T. iJ(PEN ;::;> ,$44,000 :::::.:.440;000. ..:.::.:?f40;ODf2...::...;:; 90;olt3 : .....440,{X3#Y: ::;X. :::;::>44#f i}00 :;::;;;;;
:::..::.........:::..:::>:.................................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax 1 740 000 290,000 290,000 290,000 290,000 290,000 290,000
Business License Fee 900 000 150,000 150,000 150,000 150,000 150,000 150,000
I Vehicle License Fee
Grants In-Hand
Grants Proposed
1 L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
T}TAL SQi]RCES`;:::> :::.........: ::.>;:;. ....... $4t)000 :>.... 94U 06(3 : ...:'...:
1 File::TIPCIP_A.XLS 22 Printed 7/10/91 at 11:33 AM.
CITY OF RENTON '
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 022
Rank: 2 ,
PROJECT TITLE:
Oakesdale Ave SW- SW 31st St to SW 16th St
DESCRIPTION:
Construct new 5 Lane roadway, with curbs, sidewalk, drainage, street lighting, traffic signals,
channeLization and landscaping. A portion of this facility at either end may be on structure. '
JUSTIFICATION:
High priority project in Renton's Valley TBD and in South County TBD. Serves Valley industrial area, including
proposed Boeing Longacres site. Completes missing section of important North-South corridor.
STATUS:
On TIB fund List. Prospectus to TIB in June 1991. Design will start in 1991.
Previous Funding: Preconstruction E/A = 5300,000; Business License Fee = S100,000;
Mitigation In-Hand = S100,000; Grants Proposed = $100,000. ,
CHANGES:
Southern terminus extended from SW 27th to SW 31st. Estimate increased from former E6,800,000 to $13,750,000.
FINANCIAL DATA
::::: ::::::.;:««.::.:::::. 1
Total Project Cost: 13,750,000:::':::d ldei > 900 000 100,000 800000
n Through 1990: »»»:» :.»:><»»:..........:>:>:>:>:>.>>>: ::
Spent ou
Pe 9 lA1.:;:::..:: ..........
>:>:>:>:>:>:>::;:;;:::; ;;;;;;;;;;;;;;;;;;;::;:;.;::.::::::...
1991 Budget + Carr Over: 300 000::::::>:> lftiiiift ::s 12 850 000 4,406,600 8,443,400
Remaining Cost: 1:,+,....A%?W 00
Period
::>:;<:>::,^.:992:>>>:: »:<::<:f99 :>:>[:::>:>>:>« 9$ii>::><s:<:........
::>:<::«::>;>:<s:<:>::>ffEM«<:>:<>«:s::;»»:<:»:>:::::>Prk>�#>Ttrtai. ......... .......
EXPENSES:
Project Development
Precon Eng/Admin 1,230,000 615 000 615,000 ,
R-O-W (includes Admin) 2,500,000 2 500 000
Construction Contract Fee 9 000 000 6,000,000 3 000,000
Construction Eng/Admin 720,000 480,000 240 000
Other
.....::.::..:.: ::: _.. _.:... :.... ...
OTALI�tP>"NS�S..::..:.:.:::::.::.:.::..::<:::. ��,�5(1404....;:.>::::»StS.� ; 13.1C �,.QO(). :.: 3,24Q,�DdO
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand '
Grants Proposed 4,306,600 177 400 1,239,900 1926200 963,100
L.I.D.'s Formed
L.I.D.'s Proposed ,
Mitigation In-Hand 700,000 437,600 262,400
Mitigation Proposed 8,443 400 1,612,700 4 553,800 2,276,900
Other
Unfunded
135 00Q' 480 OOi1. .... 40 »>:::::>:; :<:::. ...::. ::::.:.::::.:.
3TAL 54lJR ES>; ">:>a>'.: 3,+1:50,00[);:,......815,000.. ::..... .:...�_. . ...... _i_ _._, ,400.. .:..:,....:.. ::::.._ ::c
File::TIPCIP A.XLS 23 Printed 7/10/91 at 11:34 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 044
Rank: 3
PROJECT TITLE:
' North Renton Livable Streets
DESCRIPTION:
Neighborhood protection/traffic management improvements in the North Renton residential areas to reduce thru
commuter traffic volumes on residential streets. General boundaries are Sunset Blvd, Bronson Way, Logan Ave, and
N 6th St. Work will be conducted to conform to direction provided by the North Renton Arterial Facilitaties
Plan process.
' JUSTIFICATION:
This project is directed by the North Renton Plan, which resulted from City Council Resolution 2708 to preserve
the integrity of the,North Renton single family neighborhood.
STATUS:
Project is currently under design.
Previous Funding: Preconstruction E/A = $115,000.
Mitigation In-Hand: Boeing = $398,200.
CHANGES:
None.
FINANCIAL DATA
»>.`9th:::::::::::::"<:> #1.:........::::>:i: Via...+ . .........................................................
.....:...........::::::::::::::::.::::
Total Project Cost: 795,000:.::.:: ;''> 3ittdti ; 443 200 398200 45000
Spent Through 1990: 0::>:':> >......::>::::>::::>::::>::>: <': ::::::
Pe
1991 Budget + Carr Over: 150 000< #iifiiri2ted4f> 351 800 351,800
Remaining Cost:
Period
>[:::>'>:>:<::::;>:::: `>Pei�liul:Ttstal:>
1 992.......... ...:....1993:................'#99?{..................1E99�.................'Eggs........ .........�99T......::::
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 5T7,000 577,000 .
Construction Eng/Admin 58,000 58,000
Other
3(3TAI:
.. X...... ►:::..;:..;:.::.;:.::: 11 5004 5
,.........................�........ ...
:::.: ::.;:.;:.;::.;;;:.:;:.;:.;:.;.:;.;:.;:.;;:.:<.;:............... ..............................::::::::.<.:.:.:;;;:;;:.::.;:.;:.;;:«.;:.;:.;;:.:;.;::.;:.:;:..;;:.:;:.;:.;::.;:.;;;;:.;:.;;;::;.;;:.;:.;:.:;<.;:.;:.;:.;;;;:.;::.;::.:<.;;:.;:.;:<:.;:.::;;;;:;:.;;:.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
I Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 283,200 283,200
Mitigation Proposed 351,800 351,800
Other
Unfunded
LUTA
.... .......... ...........
><: s:';:;�.' : #.?:>::>'::>:: '6<E::; : :>::::;::»:::::;?; :::::... ... ::..:.:.�.
D00 .:........:......::.
File::TIPCIP_A.XLS 24 Printed 7/10/91 at 3:34 PM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 199'
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works ,
Div: Transportation Systems
Fund: 317
Proj: 12081 '
Rank: 4
PROJECT TITLE: ,
Park Ave N/ Lake Washington Blvd
DESCRIPTION:
Reconstruct intersection of Park and Lake Washington Blvd to discourage through movements from utilizing Lake '
Washington Blvd and improve traffic flow from Park Avenue N. to Boeing and Paccar. Intersection will be designed to
conform to direction provided by the North Renton Arterial Facilities Plan process; to include roadway
reconstruction, signal modifications, drainage, channelization and signing.
JUSTIFICATION: '
High priority project; culminates North Renton Facilitation process directed by City C(>mcil Resolution 2708 to
assure that arterials providing access to North Renton and Kennydale neighborhoods are designed and
operated in a manner responsive to citizen needs.
STATUS:
Project is currently under design.
Previous Funding: Preconstruction E/A = $131,000; ROW = 560,000.
Mitigation Sources: Boeing = 5421,800; E&H = $199,200.
CHANGES:
None
FINANCIAL DATA
::::�:::.::.y.....::.;:::.;:::.:;.;::....:...:::......::..:.:::.:::.;:.:::::::.::;.:..:.. :...
::::::::::.........qt 1:..:..:..:#......Eicr. a . :<>NI.. ........ ::.::.;:.;:.;;:...............;:.;:.;:.....::...;:.;::........;.....
...........................
Total Project Cost: 761,000 < :` uttfecl '>' 761 000 140,000 621,000
Spent Through 1990:
Pe
9
+ ................. ...................... ..............................................
1991 Budget Carr Over: 1 00
:>::><::::�i::::>::::>::::i::::>::;>::>::>::>::»i:;::�;i»»;::> ::»i::>::>;>i::i::;::>:::::>::: :::;:;`-::fi;»»»:7::>;::>::>::i:;:::i:c>::;
g iI1"i�iltic(etl�:>
Remaining Cost: t1G
Period
:;;:;;:.;;.. .......................:.... ....:.... ........ ..........
[EM:'::>:>:::'»>><:> ::::
. ....1E .. ..........:.......'f396::::::>::::> '::>:;>::>`:
EXPENSES: _
Project Development '
Precon Eng/Admin
R•O•W (includes Admin)
Construction Contract Fee 520,000 520,000
Construction Eng/Admin 50,000 50,000
Other
7. : : _ : : i
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 70,000 70,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 500,000 500,000
Mitigation Proposed
Other
Unfunded
1TOW. :>::>::::>::::;.;::>::::>:::. :<::<::>..::;::::>:::> ... ..
File::TIPCIP_A.XLS 25 Printed 7/11/91 at 7:27 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317;320
Proj: 108;329
Rank: 5
I PROJECT TITLE:
S 43rd St (LID 329)
DESCRIPTION:
Widens S 43rd St from SR-167 to Talbot Rd by 2 lanes„ SR-167 NS ramps and Talbot Rd by 1 lane and includes
curbs, sidewalks, lighting, signals and channelization. Also includes a tunnel under S 43rd with retaining walls
and connecting roads; realignment of sewer, water and drainage lines; new VMC power and water service; PVR Station
and landscaping.
JUSTIFICATION:
This project is designed to increase capacity and safety in this congested corridor and to mitigate traffic
impacts due to expansion of Valley Medical Center, which is funding the LID.
ISTATUS:
Construction will start in 1991.
Total project costs: Preconstruction E/A = $417,000; Contract Fee = $2,490,700; Construction E/A = $220,000;
Financing = $200,000.
CHANGES:
Scope and cost have increased
FINANCIAL DATA
io
Total Protect Cost: 3,327,700::::'>::>::>�::Frltidecl«>:_
Spent Through 1990:
;:;:.;::;:.;;;: :::::::::::;:.::327 700::<:<>::;3,190,000 .::.:.;;:.;;;;: ? . ::.....� +� ........ 25,000
1
991 +
Budget ...
Ca ...
rr
_ 182 00 > >: :� ' ':<::::<
0
. .......::::..::::...:.:::::::
•
Remaining Cost: ? 7
..... ::::::::::..::.::::::. . Period
EXPENSES:
Project Development
Precon Eng/Admin
R•0-W (includes Admin)
Construction Contract Fee 980,400 980,400
Construction Eng/Admin 86 600 86,600
Other (Financial) 78,700 78,700.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed 1,145,700 1 145 700
1 L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Pro sed
Other
Unfunded
T{)TAL SOURCES <: #;1A5 700
::..
1 Fil.e::TIPCIP_A,XLS 26 Printed 7/11/91 at 7:28 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
i
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works ,
Div: Transportation Systems
Fund: 317
Proj: 008 ,
Rank: 6
PROJECT TITLE: '
Park Ave N- Bronson Way N to N 10th St
DESCRIPTION:
Reconstruct roadway between Bronson Way N and N 4th St, widen to 5 lanes between N 4th St and
N 10th St, signal modifications at N 6th St, N 8th St and N 10th St. Provide new curbs„ sidewalks, street
Lighting, channelization and storm drainage.
JUSTIFICATION:
This high priority project will ease traffic congestion by improving capacity, thus reducing traffic usage of
adjacent residential streets. This project ranks as a high priority project with the TIB based on regional
significance of Boeing traffic, access to I-4O5 and SR-900, and the need for Park Ave to serve as a major
transit route. ,
STATUS:
Design will start in 1991.
Previous Funding: Preconstruction E/A = $340,000; UATA funding of $2.4 million previously
requested, additional $2.242 million UATA funding to be requested. ,
CHANGES:
None
FINANCIAL DATA
atd:'lh.::.....�i€s ��;tres>.<'. :k lea�: `°.: ::::::::.:: :. :.::
Total Project Cost: 7,283,000fUttfecl';< 2 280 800 133x578 11432,222 715,000
Spent Through 1990 :n:.;'':
LIZ-
:.::::<. ....
....................................................
. ............................
:.::.:::.........::.; :.:::..................:.::..................:....:....:.::.
1991 Budget + Carr Over: 340 000 ftri�cj6d :[: 5 002,200 4,642,000 360,200
Remaining Cost: ;f'::.6.443,+W0i
Period
.::.:::.:::.:::.::.::::.::.::........ fE €>:::>:::>:>:>:::'>:>:: :::::: ::Peiftd ta[. ::... .7892::>::;::>::>:::>::>:::::>9933: ::::::
...
EXPENSES:
Project Development '
Precon Eng/Admin 379,000 279,000 100,000
R-O-W (includes Admin) 2,000,000 1 000 000 1,000,000
Construction Contract Fee 4,226,000 180 000 2 159 800 1,886,200
Construction Eng/Admin 338,000 160,000 178 000
Other
OTAI,.>*XPEt�5 5;::>;>::.>:::: ::>::::>::::>::>:::.>:.>:::.> :::>::»: 943 Q�Q >. :. 4 �QO ...> 9'8G0> .::.. 2. :::.
...................................................................... ................. ............... ...... .....,.......... ,....................
SOURCES OF FUNDS: '
1/2 Cent Gas Tax
Business License Fee 1,300,800 640 000 510,800 150 000
Vehicle License Fee 640,000 240,000 350 000 50,000
Grants In-Hand
Grants Proposed (UATA) 4,642,000 579 000 2,559,000 1 504 000
L.I.D.'s Formed
L.I.D.'s Proposed ,
Mitigation In-Hard
Mitigation Proposed
Other
Unfunded 360,200 360,200
,.: ....
::... ... 4 084 SOD ::>::>::> :::::``:;:>::::>:: :>::' .....:....:......:.........:...
T�..Air$OUTiGES .:::: ,
File::TIPCIP_A.XLS 27 Printed 7/11/91 at 8:02 AM. ,
' CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee "aro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
1 Proj: 070
Rank: 7
PROJECT TITLE:
Mill Ave S Rebuild W/ I405 (WSDOT Project)
DESCRIPTION:
Reconstruction of existing roadway to include: Raising the Southbound roadway to the sane level as
the Northbound roadway to provide a 35' residential street. The existing NB roadway and sidewalk will
remain. Project will be done jointly with WSDOT I-405 Project. Approximately 50% of the project will be funded
by WSDOT.
JUSTIFICATION:
Reconstruction of Milt Ave is required to meet commitments made to the Renton Hitt Community.
STATUS:
WSDOT will assume lead for design work in 1991 and will administer the construction contract.
Previous Funding: Preconstruction. E/A = $47,000
1 Funding shown below represents City's share of construction and will be matched by an approximately equal
share by WSDOT.
CHANGES:
None
FINANCIAL DATA
Total Project Cost: 330,000:;::......f..uttdecl::;::: 330,000
SP
e
nt Throughh 1990
,00
1991 Budget Carr Over: 47 000 3300
tlt�funded.....
Remaining Cost: ;
Period
ITEM............. .' ...........P�1'iOd.TtitBi,..........�992:::>
--
EXPENSES:
' Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 283,000 283,000
Construction Eng/Admin
Other
:::::::.:::::::.::::.:.:..::::::.:.::.:::::::.:............. .............:..:....::.::...::::::::............:...
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 283,000 283,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
' L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTAL S ......::.
File::TIPCIP_A.XLS 28 Printed 7/11/91 at 8:03 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works O
Div: Transportation Systems
Fund: 317
Proj: 024
Rank: 8
PROJECT TITLE:
Main Ave S / S4th St
DESCRIPTION:
Improvements to Main Ave S including widening and signal reconstruction at the intersection of S 4th St.
in conjunction with the work done by WSDOT on the I-405 Project. Includes curbs, sidewalks, signal, channelization,
signing and street lighting.
JUSTIFICATION:
Modifications required to fit with WSDOT I-405 Project and also needed to reduce accidents and
congestion in this heavily travelled corridor.
STATUS: O
UATA funding requested.
Previous Funding: Preconstruction E/A = $58,000; ROW = $100,000.
CHANGES:
None
FINANCIAL DATA
vial......:... ?......k30. ee.. ......h.£
.. ...............:.
.............................
..
Total Project Cost: 620 000 ed<.:; 530 000 180r000350r
n ' >``'r :> :>.. . % : ..: .Spent Through 1990: = ........
:.:.
1..... ::::::..:.:::.::::::::::::::::.::::::::.::::::::::::.:::::::::.;:.;::.;:.;:.;:.;:.;:.;:.;:.;:.;:............
1991 Budget + Carr Over: 158 000:.. A 90 000 90,000
Remaining Cost: »'s2
Period
::::t:::::..... .... .......;:;;:.;:.;:.;:.. ........ .........
::::>:>:f994:<::>:>: ::>'>>: I#19:►:::::>::: ::>:>::::1g9fi:::>:'>::::>::::
::.:.:.::. E1VI:.<::<:>:::>::::<>:>::::::>::::>:'.>::: ::::Pe Ttxta;>:::>::>::::::::;�:942:::<:>:'':">:::>::f:393:<::::::'.:'.>::::>........
EXPENSES:
Project Development
Precon Eng/Admin 22,000 22,000
R-O-W (includes Admin)
Construction Contract Fee 40-010-0-0- 400,000
Construction Eng/Admin 40,000 40,000
Other
:;;
44l)�DOQ
OTAI.> 'EISES > :>:>::;:;::::::<:>::::>::::>::: GoG2 D40 ::.::. ... ..
........................................::...::. . ..:::::::::::...:�....:::...:::::::::;::::::::::::::.::::.::::::::.:::::.....:.:.. .:::.:::::.:.:::. :.:.:....:.:
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 22,000 22,000
Vehicle License Fee 350,000 350 000
Grants In-Hand
Grants Proposed (UATA)
L.I.D.'s Formed
L.I.D.'s Proposed 0
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 90 000 90,000
TOTAI_:501.lRC.E.S::.: :::482000
File::TIPCIP A.XLS 29 Printed 7/11/91 at 8:05 AM.
SCITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 025
Rank: 9
' PROJECT TITLE:
Houser Way Relocated - Sunset Interchange to N 8th St Phase I
DESCRIPTION:
Houser Way Phase I and II will provide a new interchange connection with Sunset Blvd and a new roadway to
N 8th St. Phase I will determine the layout for Phase I and II and design and construct the Southbound
Lane(s) from N 8th to Sunset Blvd. Includes curbs, sidewalks, street lighting, signing, landscaping
and channelization.
JUSTIFICATION:
This high priority project is a culmination of the North Renton Facilitation process directed by City Council
Resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar
employees and relieving traffic usage of North Renton residential streets.
STATUS:
TIA Grant denied, will reapply. Design will start in 1991.
Previous Funding: Preconstruction E/A = $210,00, ROW = $10,000
Mitigation Sources: E&H = $540,800
CHANGES:
Because of funding short fall, this project has been divided into two phases. The funding need has
increased mainly due to Right of Way cost.
FINANCIAL DATA
:::::.::::: ::.::;;.;•.; ::::...................:::..
....:::::::::.:.. :,: c.: c a.: ::.1H.. ..#a k:.:""»;::>:::;>:::<;:>::::>::>?:i:>:z<>::;::... > >::::>.>:::::
. ::::: ::::..... "....:.::.........:..:::.::::::::::::.:::::::.:::::::
Total Project Cost: 2,334,000 762,000 762 000 221200 5401800
Spent Through 1990:
1991 Budget + Carry Over: 220,0000rfrded 1,572,000 1,572,000
.... .
Remaining Cost: i : ,flGQ;
Period
;;;: :.::.:.....€996.......
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin) 790,000 390,000 400,000
Construction Contract Fee 1,227,000 614 000 613,000
1 Construction Eng/Admin 97,000 _ 49,000 48 000
Other
......... 3>4
_....:`++::::: :: ::: :...:::::._:::.::' .:.,DiDQ. .3$Q,?DQr):....... . 3t?�0.:::.::::::.$f>.�: 0._.:::::::::.:::::::.:::::.. :.:::::.::........._.........::::......:::.:
.............................. ............................ ........:..::..::....::::..:::::::.. .:�.::.:.:.:::::::::..:.:::z::::::::.:::::::.:::::::::::.::: : :::.:::::::::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 160,200 60,000 19,200 81 000
1 Vehicle License Fee
Grants In-Hand
Grants Proposed (TIA) 1,572,000 992 000 580,000
L.I.D.'s Formed
' L.I.D.'s Proposed
Mitigation In-Hand 381,800 330,000 51,800
Mitigation Proposed
Other
Unfunded
TAL
i 3000'
. _� _ 661100D ;::>:'::>;::::>:.::::':.: <: ....;;:
' File::TIPCIP_A.XLS 30 Printed 7/11/91 at 8:07 AM.
CITY OF RENTON o
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
0
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12135
Rank: 10 o
PROJECT TITLE:
Transportation Demand Management Program
DESCRIPTION:
Develop and implement a program that will maximize the "people-carrying" capacity of the Transportation System
by promoting use of high occupancy vehicles. The program will include, but not be limited to, development
of a transportation demand management ordinance, working with major employers on TDM measures, and recommending
facility improvements such as HOV lanes, signal modifications, and park and pool tots.
JUSTIFICATION:
The City is required by State Legislation passed in 1991 to develop and implement TDM.
STATUS: ,
The City is working with King County and other jurisdictions to develop coordinated TDM strategies.
CHANGES: o
New program.
FINANCIAL DATA
::::::.:::.:.::::::::::::::. .. :.::......
..
:<::::...:::...::.::...•. .
:::::::::::::::::.:::::::::::.:.::::::::..:: :::.......... .........................................................
Total Project Cost: 185,000< `:<Finided >;;; 185 000 185,000
n through 1990:
Spent t
9
Pe
+ .............. ....... .......................
1
1991 Budget Carry Over:
Remaining Cost: .......'.>a65
.......:::.........
Period
<rta»:::>::>:;<:>:: »:1993::::::::>:<::::; >::>:>::1:994::::>::>::>:::>::>::>:r<:: 995«:>«s>::>s»:<:>1998:::':';; ::::'.3997: > >
:>::»>?:'lTer€od'[ #.. ........ 992:>:::::............
EXPENSES:
Project Development 185,000 60,000 25,000 25,000 25,000 25,000 25,000
Precon Eng/Admin o
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin _
Other
t3TTAI: :::::::f$5004 »>`.> :>Sd' 40 5 iDtiO :::::::.... QdC 2S OGQ
EXP ►iSS..::..:.::::.:::..:.:......................... ..........................i........ ................a..........................�............... . . rh . . r<:::::::�#..JO!OQ
......_.....................................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 185,000 60,000 25,000 25 000 25,000 25 000 25,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded o
7 }TAL SOtlACES> 185,000 60,000 25;000 25,000 25,000' 25,000 25 0001
File::TIPCIP A.XLS 31 Printed 7/11/91 at 8:14 AM.
_ o
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee "aro
' DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 009
Rank: 11
' PROJECT TITLE:
Walkway Program
DESCRIPTION:
This program provides for the development of City-wide non-motorized transportation walkways for pedestrians,
and for undertaking improvements identified and prioritized by this program.
JUSTIFICATION:
Providing safe and convenient non-motorized facilities is an integral part of a complete transportation
network. Specific improvements will respond to the needs of school children, the elderly and the handicapped,
and wilt support increased use of transit.
STATUS:
On-going yearly program.
$33,000 spent on improvements in 1990. Needs and Priority Report will be completed in 1991.
Previous Funding: Project Development = $25,000; Preconstruction E/A = $11,000; Contract Fee = $73,000;
Construction E/A = $8,000.
CHANGES:
None
FINANCIAL DATA
::.. :::::.:.:....:.:.:.:.:.:. . ::.:.:.:.:.:.:....:.:.:.:.:....:.:.:.:.:.:.:.:.:.:.:.....><.:> » >' [ . ................: ::::::
:. ..... :.:: .. ......... ... ......................
.
450000450Total Project Cost: 450 000>:.> > id ...., 0..... ............0 .
Spent Through 1990: 33 00 s .. .
:.......................... ................................................................................................................
1991 Budget + Carr Over: 117,000......104"d: etl :<
Remaining Cost: i<; 3itlti0
:::.. _ . ....................._.....: Period
«::>...... ............... .: tEM:><::><:>:::;::;<.::::;:>:::>::>;:Per#zx€:Tirtai. .:... 992 :::::. ::::. 3998 ::::>:.:»»::>::
::...... .......x994 :..:.:::::::>::<?::a995 <>::>:::::>'E99G.;::.;:;. :.::.>::;::f997........
EXPENSES:
1 Project Development
Precon Eng/Admin 36,000 6,000 6 000 6,000 6 000 6,000 6,000
R-O-W (includes Admin)
Construction Contract Fee 240,000 40-10-0-0- 40,000 40,000 40 000 40,000 40 000
Construction Eng/Admin 24,000 4.000 4 000 4,000 4,000 4 000 4,000
Other
.
, ...........::.:.:............:.........::. : � ;:: .... . . ..: S GOS :
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 300,000 50 000 50,000 50 000 50 000 50 000 50 000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hard
Mitigation Proposed
Other
Unfunded
' T.OTALSOURCES: ;::::......;:;<. 304009 ,�i0`000 O;OOQ .......:.s0`OQO 50000' 56000; is o 0;
Fite::TIPCIP_A.XLS 32 Printed 7/11/91 at 8:13 AM.
I
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12111
Rank: 12
PROJECT TITLE:
CBD Transportation and Streetscape
DESCRIPTION:
Analyze, design and construct improvements to vehicular and pedestrian traffic patterns and streetscape elements
within the City's Central Business District, compatible with CBD development proposals and Comprehensive Plan
Land use designations.
JUSTIFICATION:
Future development and economic vitality of the central business district depends upon the ability
of the transportation system to handle additional traffic, parking demand and pedestrian movement. The specific
types of transportation improvements need to be coordinated with the type of land use proposed in
the Comprehensive Plan.
STATUS:
The City's Comprehensive Plan, which may propose changes to land use in the CBD, is currently being reviewed.
Transportation elements which are compatible with and enhance the proposed land use will be recommended
as part of the Transportation Plan initiated in the Spring of 1991.
Previous funding: Project Development = $100,000. Remaining $250,000 for streetscape improvements.
CHANGES:
Combined with CBD Transportation and CBD Streetscape Projects.
FINANCIAL DATA
........ ................................,........................................................................
...
. .. . . ....... ..
Total Project Cost: .
350, ...... .......................... .........................................................
Spent9
Through 1990:
0
ci>e;d;.>...�.
1991 Budget Carr over: 100 .... :>
Remaining Cost: rj0;t)4Q
Period
:>::::>::::>:::>`::Rer€oi€>::tzta::> >:::<::: :i39i::::«<::: ':> >:1g :::i`:: :#>:>:»195A<:?:<%>::
»::::::.%...:::::::::::::::> e T EM ....... ............ .. : ........
EXPENSES:
Project Development
Precon Eng/Admin 40,000 40,000
R-O-W (includes Admin)
Construction Contract Fee 190,000 190,000
Construction Eng/Admin 20,000 20,000
Other
TC)M EMNSES :.;<:<::: :: 25d�0 :: 40 4W. X10 Q00
...........::..............:.,:...::.::..:......:..............:.:::.:::::::::::::.:::::: ,.:...........;.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 250,000 40,000 210 000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTAL SOURCfS
000:
40
210,000. .
File::TIPCIP_A.XLS 33 Printed 7/11/91 at 8:09 AM.
1
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
1 CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund:
Proj: 121 12109
Rank: 13
' PROJECT TITLE:
Transit Program
DESCRIPTION:
Determine short-range and long-range transit needs, routes and facilities, including a transit center, intra-Renton
shuttle, rail system and park and ride lots. Work with Metro Transit, Downtown Renton Association, Boeing, etc.,
for implementation of short-range needs. Include transit improvements in proposed transportation demand
management programs, impact fee program and capital facilities needs assessment.
JUSTIFICATION:
Transit improvements are a vital component of the transportation system's ability to absorb future traffic demand.
Transit will be one key to meeting the goals of the downtown area as well as industrial and office park development
in other parts of the city.
STATUS:
Staff is currently working closely with Metro Transit staff on near-term service improvements in Renton.
Work is beginning on the Transportation Plan, which will examine the need for future transit improvements.
Previous Funding: Project Development = $50,000; Design and Construction = $328,000.
CHANGES:
$168,000 ending balance of 317 Fund put into Transit program-plus $160,000 that was replaced by grant for
NE 44th signals.
FINANCIAL DATA
Total Project Cost: 8
82 000::::::[:;::;::;::''':<<:>::
1 Funded:.::;:.: 8%28,000 828, ...... .......................... .........................................................
Spent Through
1990:
Pe
9
+ ..................................
1991 Budget Carr Over 7
3 8 000``a�> > ' >;� =>
t3r�f
................................................ .:::.::::::.:::.:::::::::::.:..
....................:............................:::::::::::::::::::::::::::.........................................................
.................... ......................................................:::::::::::::::::::::::.::::.::::::::::::::::::::::::::::.
9 utxied..,..
Remaining Cost: x$0..
000'
.:::.............:<>:::«.;::ITEM
-: Period
9993 ::'. ....7997::::> :
EXPENSES:
Project Development 50,000 50,000
Precon Eng/Admin 48,000 24,000 24,000
R-O-W (includes Admin)
Construction Contract Fee 310,000 160,000 160,000
Construction Eng/Admin 32,000 16,000 16 000
Other
...........
..
............: ..:::.:..::.:.:: ::::::::::::.
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 451,000 50,000 200,000 200,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
1 L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
T1kT,AL S R s " .
QL! CES......:::::>::>:;
File::TIPCIP_A.XLS 34 Printed 7/11/91 at 8:12 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works ,
Div: Transportation Systems
Fund:
Proj:
Rank: 14
PROJECT TITLE:
Houser Way Relocated - Sunset Interchange to N 8th St Phase II
DESCRIPTION:
Houser Way Phase II will design and construct the new undercrossing of Sunset Blvd and the new Northbound
lanes) from Sunset Blvd to N 8th St. Includes curbs, sidewalks, street Lighting, signing, landscaping
and channelization.
JUSTIFICATION:
This high priority project is a culmination of the North Renton Facilitation process directed by City Council
resolution 2708 with the objectives of providing additional ingress/egress for Boeing and Paccar
employees and relieving traffic usage of North Renton residential streets.
STATUS:
Funding to be determined.
CHANGES:
Because of funding short fall this project has been divided into two phases. The funding need has
increased mainly due to Right of Way cost.
FINANCIAL DATA
ata);.;..:.
Total Project Cost: 2,261,000':><:;; �w.< 30 000 30�000:•::::•.:•:::::::::::.:.:•::::::..:::::::::::::::::::::::::::::::::::.:::::::::%,'%--:::..
Spent Through 1990:
I3.rifiiesl«' >< �ratfs> ;;< >» `»»<[>>> »[>[> > » >=>
oug
1991 Budget + Carr Over: .un&d <: 2,231,000
1,100,000 1,131,0(N)
Remaining Cost: € 21i4G
Period
r r>:< a >s:::::
<ttttl 1992»::>:> :: <>3993 �9JA. >:< 1<7395::::.;:;:.><;.:.;;;;;E996. >::>:>.::: >:>::»#997:.»:.:«::.
::>» ITEM::»>>'.^'::: :: :::.;;.Pe T.. '
EXPENSES
Project Development
Precon Eng/Admin 256,000 128,000 128 000
R-O-W (includes Admin) 380,000 380,000
Construction Contract Fee 1,505,000 1 505 000
Construction Eng/Admin 120,000 - 120,000
Other
TpTAt,EXPEN5E5 » ; 6t> . ... .....W.
:........ . ...........
SOURCES OF FUNDS: ,
1/2 Gent Gas Tax
Business License Fee 30,000 30,000
Vehicle License Fee
Grants In•Hand ,
Grants Proposed (TIA) 1,131,000 64,000 254,000 813,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 1,100,000 34,000 254,000 812,000
2,261,000 r<:;:::»>:::>
128 OW
081 A 62 U00'
TAt S RCE -:.......:::::..:......
File::TIPCIP A.XLS 35 Printed 7/11/91 at 8:08 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
' Proj: 106
Rank: 15
PROJECT TITLE:
' Bridge Inspection Program
DESCRIPTION:
Inspect all roadway bridges owned by the City every two years.
JUSTIFICATION:
Must be done for safety and funding purposes and as part of S.W.I.B.S. Program to determine structural
deficiencies, physical deterioration, or functional obsolescence and to qualify for federal bridge replacement
grant funding.
ISTATUS:
On-going bi-yearly program. $50,000 budgeted for 1991 program.
' CHANGES:
Changed to biannual program and "Emergency Repair" taken out of title. Repairs as required will be funded
on case-by-case basis.
FINANCIAL C DATA
s
....................... :<:`:<:;::: : :....>::>:.::::::>::>:>:>: :<:>:::>:::::>::»::::>::::>:::<:>::::> ::::>::<::<::<:::
.::...:.:::::::::::::::::::.:
Total Project Cost: 170
000:::> <:'>::, ;::.......::.1.70: .:.::.::..:::.:::.::::;;;.;:..�::::::::.: ::::::::::::::::::::.;:.
1 .....,:I Utld2d..:.: 000 170,000
Spent Throughh
1990:
'>
.. .....................1991Bud et + Carr Over: 50 000
Remaining Cost: : i2pt
Period
::>:,;::::::; Peritt>d.Total
EXPENSES:
' Project Development 120,000 40,000 40,000 40,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
oT1l. x.. rss:: ...........::.>:::.:<... : ......iso ooa :::::>::::;;.; a _ .::
IE
..:::::::.:::.:: :. .;.:......:::::,Qoa:.
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 120,000 40,000 40,000 40,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.Is Formed
L.I.D.Is Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
i _ CSS
i
File::TIPCIP_A.XLS 36 Printed 7/11/91 at 8:17 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 016
Rank: 16
PROJECT TITLE:
Traffic Signal Loop Replacement Program
DESCRIPTION:
Replace failed or failing traffic signal vehicle detection loops and repair pavement as required to achieve proper
installation and assure reliability.
JUSTIFICATION:
Most of Renton's signals require extensive vehicle detection systems to provide traffic count data needed
for the intersection controllers and VMS signal coordination system to operate effectively. . The detection
Loops in the pavement must be properly maintained; their failure results in highly inefficient operation.
Pavement deterioration due to heavy traffic volumes, trucks, and adverse weather have increased the need
for replacement.
STATUS:
On-going yearly program.
CHANGES:
None.
FINANCIAL DATA
...... ....
Total Project Cost: 150,000 'Itlttlecj: 150000 150,000
Spent Throughh 1990:
XX
..............................
liltc . .............
1991 Budget + Carr Over:
........
'
.. ...... ........ .. ...
Remaining Cost: ......54fl0
Period
otsi: ; y:992>» 9J93;:;:::::. »:<199A ;::>::::::::::: 995:::>'.:€:::.:::'.>:>::199E .... .; :::199
:«: :>:::> :PurTodT
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 126,000 21,000 21,000 21,000 21,000 21 000 21 000
Construction Eng/Admin 9,000 1,500 1,500 1,500 1,500 1,500 1 500
Other (Cit force) 15 000 2,500 2,500 2,500 2,500 2 500 2,500
T < :::::»:......f::'>:::::..:.. ... 25`400 " ' > G00:::>< :»?::::25 :: >::::::::>::»>:2 :::.:25#fOQ:
QXi. XP .tSS :: a � ^+. , ,.......,. ,.......:. ..,.........::::::::::.....5 . :>::>::>:::..::: :._._:
........ ...........................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 150,000 25,000 25,000 25,000 25,000 25,000 25,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
00 "25 000
T't)TAi::SOIJRCES;>
File::TIPCIP A.XLS 37 Printed 7/11/91 at 8:18 AM.
CI'T'Y OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
' Proj: 12113
Rank: 17
' PROJECT TITLE:
Traffic Sign Replacement Program
DESCRIPTION:
' This program provides for the replacement and/or relocation of signs that are obsolete, faded, poorly
Located or no longer appropriate.
' JUSTIFICATION:
Poor signing can be one of the highest liability exposures for a city by creating safety problems and driver
confusion.
STATUS:
On-going earl ram.
9 9 Y Y program.
9
Contract fee amount is for purchase of materials that will be assembled and installed by City.
CHANGES:
None
FINANCIAL DATA
s
.............................
:..........A:x:+ ..........$......tic.#�ee< :> :.... :»::>:>.>:>>�«> «««><>< <`':«':'»> > <>
Total Project Cost: 120 00 :>
...:.:: :_::::::::.:._::::::: ::: ::.;;
J 0..>:>< futiflecl;:' 120 000 120,000
Spent Thr9
Through 1990:
1991 Budget Carr Over:
er:
Remaining Cost: ...... ..... ...
..........
Period
lou
:::><:: 199 199A 7.:..:::
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 51,000 8,500 8,500 8,500 8,500 8,500 8,500
' Construction Eng/Admin
Other (City Force) 69,000 11 500 11 500 11,500 11 500 11 500 11,500
TQzAXPI~NSES ' I4,Q09Q,040 2p;Q90Q »'.'i` : >::>>:2p
......... .
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 120,000 20,000 20,000 20,000 20,000 20,000 20,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
0,
File::TIPCIP_A.XLS 38 Printed 7/11/91 at 8:19 AM.
CITY OF RENTON '
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 091
Rank: 18 '
PROJECT TITLE:
Light Pole Replacement Program
DESCRIPTION:
This program is for the replacement of damaged luminaire poles.
These poles have been damaged in unknown incidents where reimbursement through normal channels is
impossible.
JUSTIFICATION:
Pedestrian and vehicular safety is highly related to adequate street lighting. Purchase of these poles falls
beyond normal maintenance budget.
STATUS-
On-going yearly program.
Contract fee amount is for purchase of poles.
CHANGES:
None.
FINANCIAL DATA
................................................................................... .......................... .........................................................
y...
Total Project Cost: 150,000:: :: ;:!> ed;::<; 150,000 150,000
Spent9
Through 1990:
1991 Budget Carry Over:
Remaining Cost: f>«..... ! �
Period
TEM.......
.....
.......
..............................
><:>:;:: ;PewTota .199 .: 3393 1994.....:: >:>:`a995:.;:.; .:iz::<<.1396:>;X-X- ::::;:;1997 ... .:
.....__ . ...... .. ._
EXPENSES:
Project Development
Precon Eng/Admin 12,000 2,000 2 000 2,000 2 000 2,000 2,000
R-O-W (includes Admin)
Construction Contract Fee 138,000 23,000 23,000 23,000 23 000 23,000 23 000
Construction Eng/Admin
Other
Q'IAi EXPELASES;:::.::.;;;;;;:::::;'++...
SOURCES OF FUNDS: o
1/2 Cent Gas Tax
Business License Fee 150,000 25,000 25,000 25,000 25,000 25,000 25,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTALSOURCES;:: lSO,O00 25;000 :..i .25;000 25,OQ(f
File::TIPCIP A.XLS 39 Printed 7/11/91 at 8:21 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
' Proj: 056
Rank: 19
PROJECTTITLE:
Sidewalk Inspection and Replacement Program
DESCRIPTION:
' Inspect sidewalks to determine areas needing repair, notify property owners of those sidewalk areas that are
their responsibility to repair and finance repair by City crews of areas that are City's Responsibility.
JUSTIFICATION:
Dangerous sidewalk sections are safety problem for pedestrians and a liability exposure for City.
STATUS:
On-going yearly program.
Program began in 1990 and will complete backlog of repair locations in 1992.
CHANGES
Inspection began in 1990 and will complete backlog of repair locations in 1992. Budget increased from
$5,000 to $10,000 per year.
55,000 for inspection & notification, $5,000 for City repairs.
FINANCIAL DATA
...........................
::::: ::::.::...... .......................................
Total Project Cost: 65,000"....'...'F.
J 65,000
Spent Through h 1990•
99
1 1 e Bud a
Budget Carry Over:
Remaining Cost:
Period
....;:.;:.:
.::A99T:: ... .
EXPENSES:
Project Development 30,000 5 000 5,000 5,000 5,000 5,000 5,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 35,000 10,000 5,000 5,000 1 5,000 5 000 5,000
' Construction Eng/Admin
Other
:: :> . ,�Oa t �� . ...... 1 ,400 �n Qdd tQ .:..:.:.::.: .::::;.><::<;::>»::G 00Q
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 65,000 15,000 10,000 10,000 10,000 10,000 10,000
' Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TE}TAi S0UR0ES fi'> >::::::;>:<::::<.;::;::>.: >::.>::>;;:>::::$S OOU < .......15006 10; 10,004: 70,000:: 1: tf00 ##)000:
File::TIPCIP_A.XLS 40 Printed 7/11/91 at 8:22 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 029
Rank: 20
PROJECT TITLE:
Arterial Circulation
DESCRIPTION:
Completion of a computer model of the City's arterial system is scheduled for 1991. This model will be used to
develop an arterial plan as part of the City's Transportation Plan. Transportation projects will be recommended
to improve traffic flow on a multi-model basis and will be coordinated with Transportation Demand Management and
Clean Air requirements. This fund will provide for planning, design and construction of projects.
JUSTIFICATION:
Recommendations for arterial system improvements will be a key product of the Transportation Plan.
These projects are essential to support further development and to reduce negative traffic impacts in the City.
This fund is necessary to allow for completion of relatively low-cost projects which will improve traffic operations,
promote increased use of high-occupancy vehicles and comply with clean air legislation.
STATUS:
Work is just beginning on development of the Transportation Plan. Initially, this project will fund the
planning work which will lead to recommendations of improvement projects.
CHANGES:
None.
FINANCIAL DATA
.........................................................................................................................................................................
................................................................................... .......................... .........................................................
Total Project Cost: 61880,000;<` >ifilttlk+d 4 559,000 3,859,000 700,OOCI
..:: :::::: :>::
........: : ;;:`::. :SPent Through 1990: ..; ........ : Mig4o
. .... ::: ::...... .... ....:: ::: : ::
1991 Budget i Carry Over: 120 000 . ktnfuncled ; 2 321 000 1,700,000 621,00()
Remaining Cost:
Period
TfEM>::::::::::::>::::::;.<:::>:::>:::: ;.Pei ior3 Tctai :::::>::.>:'»::> I99S <::>:::.;:::>;::::>:1994 99 ..;::;. .::: 997:::::::::..;
992........ 1€ .: _f 6 .....1
EXPENSES:
Project Development 80 000 80,000
Precon Eng/Admin 830,000 80,000 150,000 150,000 150,000 150,000 150,000
R-O-W (includes Admin) 650,000 50,000 150,000 150,000 150,000 150,000
Construction Contract Fee 5,200,000 300 000 1 000 000 1,300,000 1,300,000 1300000
Construction Eng/Admin
Other
t3T . .....
Af.1`7CA S S .....::::.::.:::.:;.>:;;;::::::.> $y360,(NOG� SO,00. 5QOa4�4 :::>:::.:� ��:.::>::>::::#i�4e000 ��600�000' 1a X000
...................... ......... .
SOURCES,OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 3,739,000 160,000 290,000 449,000 1 030 C00 925,000 885 000
Vehicle License Fee 700,000 350,000 350,000
Grants In-Hard
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 1,700,000 210 000 400 000 400,000 325,000 _36__5r0_0_0
Other
Unfunded 621,000 451,000 170,000
T(?TAL.SOtJRCES >:::>::::<;::::>::.
$,7&0,000 :> i60;00C+ x00;0011 a300,00(i: .....t'800,000::::....9'60C�,000'
File::TIPCIP_A.XLS 41 Printed 7/11/91 at 7:57 AM.
' CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
' CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
' Fund:
Proj: 121 12117
Rank: 21
PROJECT TITLE:
Monster Road Bridge
DESCRIPTION:
Replace Monster Road bridge. May be combined into Oakesdale Ave SW/Monster Rd to North City Limits project.
' JUSTIFICATION:
Bridge requires interim repairs based on evaluation by an independent bridge engineer. Due to increasing
truck traffic, age and.condition of structure, partial or full replacement of the structure may soon be required.
STATUS:
Bridge will be fully evaluated in 1991 as part of S.W.I.B.S. Program, which determines the structural integrity of
the bridge and whether it qualifies for Federal Bridge Replacement Funding.
CHANGES:
Former scope of work was only for interim repairs.
FINANCIAL DATA
Total Project Cost: 1,400,000<::>::»:<::lUttletl ::;;: 100,000.::.::50,00......•:.::::::SOt000::•:::•::::::::::.::::.;:.;:.;:.;;:•;;:;:<.>;;::.:::.::.::.::.::.::.::.......
;s :<:>> M
ala:;:: z:;::;:::: .........>: .........
Spent Through 1990: ;:.;:.:rpran �::: :::::::::::::::.�:::::::::.:::::::::.�::::::::::::::::::
1991 Budget + Carry Over: 1,300,000 1,050,000 250,000
Remaining Cost:
Period
:;::>::: :^; <: P�r#odT I 7992 1993:;: 1994 . a995 ...
... #TEM .
EXPENSES:
Project Development
Precon Eng/Admin 200,000 100,000 100 000
R-O-W (includes Admin) 100,000 100,000
Construction Contract Fee 1,000 000 110-0-0-10-0-0-
Construction
000,000Construction Eng/Admin 100,000 100,000
Other
.
... ..
7 1 ,;:...;;::.;
TSCA# EXPENSES......<:r sa:;: 30 0�4 <':> ':1 Ob 000 2QQ;,
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee 50,000 50,000
Grants In-Hand
Grants Proposed 1,050,000 1,050,000
L.I.D.'s Formed
L.I.D.'s Proposed
' Mitigation In-Hand
Mitigation Proposed 250,000 50,000 150,000 50,000
Other
Unfunded
TOTAL SOURCES... . >--+...-.-.-.-'.-".-; :; #;+00,000' : 1;100,OOa ,. ..
#D0,000 200;000
File::TIPCIP_A.XLS 42 Printed 7/11/91 at 8:46 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works '
Div: Transportation Systems
Fund: 317
Proj: 054
Rank: 22
PROJECT TITLE:
NE 44th St / I405
DESCRIPTION:
This project is signatization of freeway ramps and widening of signal approaches where warranted.
JUSTIFICATION:
Growing traffic volumes are warrenting signals at this location.
STATUS:
FADS funds of $211,222 have been approved. Mitigation funds of 548,778 in hand.
Previous Funding: Preconstruction E/A = $44,000.00, including $28,336 FAUS grant.
WSDOT money is also available to refurbish bridge deck.
CHANGES:
None
FINANCIAL DATA
«> {;:<>::::<: :: sats><> M .::>::;:.;•<;<:;::: . <?<> >> > ' - >
.......::.:..
al::::::.. ..::::G. .::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.
Total Project Cost: 260,000 ; Fi`w6d : 260,000
. 211,222 48.778
.
: .. . .. ..:::........ > . ... .: . .. . ::: ::SPent Through 1990: » .
.....................
1991 Budget + Carry Over: 44,000f> ti5fii►Sddr:> ,
Remaining Cost:
Period
..................................................................:`>::1{EM:>>:€:»>>;:::>'.'.::::>:: :>Pe. ..: [i3ta[:> :z::>:>: :�32........ ' ::.". 993:::::>::::>:::>:::.»:<:::1994>:;;<:>:::::; >':::>I#;95::::::::: :::::::..2 6::>::>::::»:::>::::::::>::>:.: 7;::;::::;::r;:
_. .. . 99 ......... ........t99........... '
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee 200,000 200,000
Construction Eng/Admin 16,000 16,000
Other
................................... ... . .........00.0 ...:::::._:::::::::::::.::.:::.......:..........::..:::::::::.:::::::::.:::..::: ............I................
...................:.......................... . ............................ ................................................................................. ..................................................................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand (FAUS) 182,886 182,886
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 33,114 33,114
Mitigation Proposed
Other
Unfunded
.:..::. ... #S,O_DO 216,
_ ,TTAhSOUROES
File::TIPCIP_A.XLS 43 Printed 7/11/91 at 8:27 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 023
Rank: 23
PROJECT TITLE:
SW 16th St - West City Limits to Lind Ave SW
' DESCRIPTION:
Roadway improvements to include: Widening to 3 lanes, roadway reconstruction, curbs, sidewalks, street
Lighting, channelization and storm drainage and bikeway.
JUSTIFICATION:
Traffic demands due to proposed development in this area, including the Boeing Longacres site, will accelerate
the need for this project and a re-evaluation of the project scope, including number of Lanes.
STATUS:
Begin P.S. & E. in 1992 pending funding
Previous Funding: Pre-construction E/A =$60,000
CHANGES:
West Limit extended from Oakesdale to West City Limits, combining with the former "SW 16th Oakesdale
to Monster Rd" project.
FINANCIAL DATA
.:::.::::::::.................:.............................:.:.... ..........:........................................................ .
Total Project Cost: 4,302, 120,120 000 60,000 _
:::'"»»:
6.0,00.0.. «: XX
:SPent Through 1990:
1991 Budget + Carr Over: 60,000:;>::>itfunded::>:: 4 182 000 1,772,000 2,410,000
Remaining Cost:
Period
>:: ::<;:'::: <:;:::z:>. »: »><:>:::. 9 ..z:i>::>::
:....................�f EM :::>.:............ Pertod Taal:: :::X992....,.. .......3993 i 94.. .... ..:.......
EXPENSES:
Project Development
Precon Eng/Admin 498,000 219,000 279,000
R-O-W (includes Admin) 200,000 200,000
Construction Contract Fee 3,282,000 3282000
Construction Eng/Admin 262,000 262,000
Other
:.:
:>::::»[::: ;::;: ::::::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee 60,000 60,000
Grants In-Hand
Grants Proposed 11772-10-0-0- 1,772,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 2 410 000 159 000 479,000 1,772,000
Other
Unfunded
TOT <:S41IR£E
....'4 242000 :;;;;:•;:.:.;2t9 000::: ;R79,00ff ..::> 54. ....::::::::::::::::
FiLe::TIPCIP_A.XLS 44 Printed 7/11/91 at 8:33 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works 1
Div: Transportation Systems
Fund: 317
Proj: 032
Rank: 24
PROJECT TITLE:
Sunset Blvd N Project Development
DESCRIPTION:
Conduct preliminary engineering studies for improvements to Sunset Corridor between Maple Valley Wye
(SR-169) and Houser Way relocated.
JUSTIFICATION:
This congested corridor lies between two interchanges to I-405 and is at the confluence of two state routes
and three heavily traveled principal arterials. This area contains the two most heavily congested intersections
in the City. Long-range and short-range improvements are required.
STATUS:
Previous Funding: Project Development = 4100,000
CHANGES:
This project was formerly called 11I-405 Studies,' but has been narrowed down to this key location.
FINANCIAL DATA
tal Pro' c 0 00
To �e t Cost: 10 0..::»>'::>Itiideds;:€ 100 000100,000•
Spent Through 1990:
Pe
9
+ ...................... ..............
1991 Budget Carr Over: 100 000":
Remaining Cost:
Period
Tota[<: ....... 932:::>::>» 4393::.:>;; ::<:> X99#...'<:<>:: :<:::::>:> 93r ,:;;: :;:•;;::;::1398 ::>:::::::<:>::#997:::>::>:>::
EXPENSES:
Project Development O
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
r.. . rrs 5 >:::: . .;::.;.;.;..
... .... :::.;:.:;: .:.:::::.:..... ..:...:..:.....
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hard
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed a
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
ITOT ROES:::>:: :>:::::;::::>: ::::;>:. i:'::>:::»::>::::>: `:<:::::>::>^<:.,:;:>;:`:: .:.:. >::.>:::>::::::;::":::' ?::;;::::'.::>>::':>::>::>:.::>:>:::>:::`;:;:::><:>::......»
File::TIPCIP_A.XLS 45 Printed 7/11/91 at 8:29 AM.
CITY OF RENTON
' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
' CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
1 Fund: 317
Proj: 058
Rank: 25
' PROJECT TITLE:
S 2nd St /Logan Ave S,Williams Ave S &Wells Ave S
' DESCRIPTION:
Bring signal indications up to MUTCD standards. Provide overhead signal displays free from roadside
obstructions. Increase intersection visibility and awareness. Major work is signal foundations, wiring and
new poles.
JUSTIFICATION:
Qualified for Federal Safety Funding due to accidents caused by poor signal head visibility.
' STATUS:
Final design and construction are on hold awaiting input from CBD Transportation and Streetscape projects.
' Previous Funding: Preconstruction E/A = $23,000; Contract Fee $107,000; Construction E/A = $8,889
CHANGES:
' None.
FINANCIAL DATA
afil:.;;:.;;:.;:::bus_�3c:. e;:::;.;;;;: arss:.:;.;:.;:..:;.>:.:;>;:;.;;;::;;;:.;;:.:.::.::.;:.;:.:;:.:;;;:.;;:.;:.;;;;.;;.;:
Total Project Cost: 138,8.89 138 889 13889
'
f„
125,000
Spent Through 1990: ''::...::1990Budget Carr Over: 138,889:::::A
LlF1dAt1,.:::
...............
Remaining Cost:
.........................
Period
ITEM::::::::.::::::•:::•.::..::
X992::::::_:»:::>::»:«;9 >::>::<:> ^::`:.
993 ,:: f99A:.;::::.;; ::;:•.:�99�<.;:>;: :::..1.998
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
N
7gTAC '£...S 5...............:,:.::::::::::::.:::::::::::::::::::::: :::.:::::::................... ...................................................... ........::.:::.:.::.:::::::::.:::..,:...........................................
1 .................................................... ........................ ................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
' Business License Fee
Vehicle License Fee
Grants In-Hand (HES)
Grants Proposed
' L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hard
Mitigation Proposed
Other
Unfunded
I.TOTAi.SOURCES ...... ........ . . ..
' File::TIPCIP_A.XLS 46 Printed 7/11/91 at 8:34 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 028 '
Rank: 26
PROJECT TITLE: '
SW 43rd St / SR 167 Loop Ramp
DESCRIPTION:
Construction of new Southbound to Eastbound off ramp at SW 43rd St and SR-167. WSDOT is Lead for design and '
Construction management. City will hire consultant and manage the funding.
JUSTIFICATION:
Identified in Valley TBD Study as an improvement needed to reduce congestion at the intersection of
SW 43rd St/East Valley Road.
STATUS:
Previous Funding: Preconstruction E/A = 580,000
CHANGES:
None
FINANCIAL DATA
ra`
F..ilS: . rets ;f#ua,i ._. e......................................_.......
80000 7 :.: 13
Total Project Cost: 1,050,000:::: ><' Uttieth<< 66 3
t.............. ....................................................................................
Spent Through 1990: j;;�
9
Pe ... ....................................................
1991 Budget + Carry Over. 80,000::::::,::::tlrifunded 970 000 639,300 330,700
Remaining Cost: zt3
.. .......... ..
Period
::::::...:::;;: :::: f99A :<:::;:> ::>:::::>a995;:;:: 1<396:[;: :::> >::::>T99T...... ::
I.I(EM ...................... .Perfud Totat. 7892... . 1.993 '
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin) 20,000 20,000
Construction Contract Fee 860,000 860,000
Construction Eng/Admin 90,000 90,000 ,
Other
T31A►. it' .N.SI*S .C QQQ: ................... C 4dG 9 >:<:::»:::.>; ;:::: : :<:; :>:;;::r
.......................................... ............................ ........................ ..
SOURCES OF FUNDS: '
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee '
Grants In-Hand
Grants Proposed (TIA) 639,300 20,000 619,300
L.I.D.'s Formed
L.I.D.'s Proposed 330,700 330,700 '
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
.........
,.
File::TIPCIP_A.XLS 47 Printed 7/11/91 at 8:35 AM. '
' CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee "aro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund:
Proj: 121 12121
Rank: 27
' PROJECT TITLE:
Lake Washington Blvd - N Park Dr to N 44th Project Development
' DESCRIPTION:
Preliminary engineering studies on Lake Washington Blvd to rehabilitate the roadway and to conduct safety
improvements such as a pedestrian/bike path and traffic metering.to N Park Dr.
' JUSTIFICATION:
This is an important route in the City's trail network and the City has made a commitment to limit
through traffic in this area. The existing roadway is in poor condition, resulting in high maintenance costs, and
is in need of rehabilitation.
STATUS:
Construction funding to be sought, including grant money.
Existing carryover funds will be used to develop proposals for the rehabilitation and trail improvements which will
be undertaken as funding is available and in conjunction with the Overlay Program.
CHANGES:
None
FINANCIAL DATA
................;:. ;:.
........
Total Project Cost: 125,000. funded.: 125,000 125,000
Pe 9
Spent Through 1990
•
1991 Budget
Y
Carr Over: 75000 `> `` Tided:::.:. .
Remaining Cost: St7#)<l0
Period
.;p :...�:. :::: ..::.>:.>:.::...::.::.:.>: .. .
:.� iii`:.: •:
..•.......:...:P .T :. t.9J2 1193:::::.:>:;:.::::>::::: �gg4 :..;:..:::..;:.f9g5...... t99B
EXPENS
Project Development 50,000 50,000
PrecoES:n Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
7flT .::: .::.;.;;;;:.;;: .. ......:::::.::.....:::. :.:.:
50 000: ::::::..:::::::>;»: >:.;:..:::::.::.. ....... :.;:.;:.;:.:.;:.::;;:.......::.::...
..............::::...... :.:.:,::.::.......... ........::.:.::::...::::::::::.:::.:.................... .................�.....
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
uUnfunded
■�
_QT
File::TIPCIP_A.XLS 48 Printed 7/11/91 at 8:55 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12110
Rank: 28
PROJECT TITLE:
Neighborhood Improvement /Beautification Program
DESCRIPTION:
Provide traffic flow management, and residential street beautification.
will include such items as signing, benches and trees.
JUSTIFICATION: '
This program is intended to enhance "livability" qualities on residential streets.
STATUS:
Previously funded $70,000 will finance 1992.
Previous Funding: Preconstruction E/A = $10,000; Construction Fee = $56,000; Construction E/A. _ $4,000
CHANGES: '
None
FINANCIAL DATA
....i ...... ...........r.....4........::..........ln...::�.r..:::::;:::i:
........:::::: :::::: ::::.................... .. .: : :::::::::::�:: :::
Total Project Cost: 420,000:><<>` funtied >z 420 000 420,000
Spent r
t T h ou h 1990: w:....
9
1991 Budget Carr Over: 70 000`» f '
9
ifi.unded
Remaining Cost: 35.d00G
Period
>::::;^: : >:::........ .3I EM .....:.;<;>»:>>:;:»<: Pei kid Total::: . ...�992 ..:. ,::..
3393:: ; t99A..:>: »>:;>::>� :>:>'>::: ......1399 :>;:<.; ......:f99T:.:>::>;
_..
EXPENSES:
Project Development
Precon Eng/Admin 50,000 10,000 10-10-0-0 10,1000 10 000 10 000
R-O-W (includes Admin)
Construction Contract Fee 280 000 56,000 56 000 56 000 56 000 561070-
Construction
6000Construction Eng/Admin 20,000 4,000 4,000 4,000 4,000 4,000 '
Other
TQT S S> :: :::::: :: ::::::::: ::>: : ::: ::: Q OQC35004 7
O pOQ`
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 350,000 70,000 70,000 70,1000 70 000 70 000
Vehicle License Fee ,
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
>70,000
File::TIPCIP_A.XLS 49 Printed 7/11/91 at 8:38 AM. ,
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12112
Rank: 29
PROJECTTITLE:
City Gateways Program
DESCRIPTION:
Beautify four entrance locations to the City. Project to include signing and landscaping.
JUSTIFICATION:
Displays a sense of civic pride.
STATUS:
Previously Funding $55,000 will finance 1992.
Previous Funding: Preconstruction E/A = $8,000; ROW = $1,000; Contract Fees= $42,000:
Construction E/A = $4,000.
CHANGES:
None.
FINANCIAL DATA
...............::.::::::::::::
: :::::::.
»::
Total Project Cost: 220,000:;::::>><filCded ' 220,000 220,000
Spent9
Through 1990:
1991
Budget Carr Over: 0
s ilnfutx}ed.....
Remaining Cost: ' 3 �; !
Period
T+
Imo:
,.. .. ..
EXPENSES:
Project Development
Precon Eng/Admin 24,000 8,000 8,000 8,000
R-O-W (includes Admin) 3,000 1,000 1,000 1,000
Construction Contract Fee 126,000 42,000 42,000 42,000
Construction Eng/Admin 12,000 4,000 4,000 4,000
Other
EXPNS S ::.:; .;:::..:.; .;: ::.;:.;..;:.; »::>::;:::. »>:::»...:: _;::>::>:::::;..::;.;: ::..:......::...:........::......
:::::::::::: ::.. :...........i�500Q: ........................................55QcOG......:::.::..5� DQ. .::::::.:::::�6.. :;;;::;.:. ..:.::.::::.::.:..::..:...
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 165,000 55,000 55,000 55,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
11 L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
li Other
Unfunded
5S 000< �5 0005;5 <:.: .:»;.;;;:;.:;:;::;: .;:::::>:::>;•.:.;;;:::::>::;::::>:
a ;>:<•. ,008
File::TIPCIP_A.XLS 50 Printed 7/11/91 at 8:39 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 095
Rank: 30
PROJECT TITLE:
S 2nd St /Main Ave S
DESCRIPTION:
Signalization and channelization improvements at intersection.
JUSTIFICATION:
Existing signal does not meet current standards,.
STATUS:
On hold waiting input from CBD Transportation and Streetscape Project.
Previous Funding: Preconstruction E/A = $10,000; Contract Fee = $60,000; Construction E/A = $5,000
CHANGES:
None
FINANCIAL DATA
:.K. 1 ...> :Bus:;:.e <,::> :`; ''`•:>``•:>`.'. `'«»> < :` »> > ;« z»'>':>' <:
::.................. ........
K............. ... . .:..:..:............................................................................
............................................................................................................... .........................................................
................................................................................... ....................................................................................
Total Project Cost: 75,000;<<<>itlttlecl: 75000 75,000
Spent Through 1990:
Pe
9
+ ......................
1991 Budget Carr Over: 75 000'::::` ''""''<«;
:::::::............:::.::::::::::::::.::::.:::.:. .:::............:.......................
2;222:»»>:::::>::>::r::»»::>::»::>::R:::>::.........:::>::::>::>::i::>:::;:::::i::»::a:::»:.:>::>::>::>::>::>::>:........>::is....:i::r>::i::i::i:....»::....::z::
9 ....32nfiund ..... '
Remaining Cost:
Period
......... ...-... ,.�......
...... ..........>::>:::»:Rini :Tota[:;::>::>:::> '992222;2>:::'>:::::::1:993. ..... :.....:a8 ]:::>:::: ;::::<:>i895:::>:>:i::>:: >:>;><::1:998:>;::::::`:<:ii><::f.997:
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
;..:.. .. ... .::>;:.......;;:.:::;:..................;;.-...:;;:.;>:_2.;22.;2..;;.:;;::.;:.;;;;;< . ...:.::::.::::::
TA..... ........£5..........:::::.::::::::::::::::::: :::::.::.::.....:.:::.::::.. ...:::::::::...............:.............::.::.:::.....:....:::.._::::::::.::::::.:.::::::::::._::2:::::::..... .....::......::::..... ..._22 ......::::::::::::::.
SOURCES OF FUNDS-
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTALS4URGES.::::: :::... < z:::':: ::: :< <?::>::>s:;;:>z>:: :::::>::.> ' : ........ :'::::::.< r. .::. ::.>::>`.:`.::::<r:::">.::::;<:::::::r::::::`; :>::::::>::::>:::::::>:::»<::>:.»:>:>: :::>:::.`'.::.... ::::>::. .
.................::::::::::::::::::::::::::::::::::::....::...:................:.:..::::::::::.::::::::::::::: ...........................::::::::::::::::::::::::::.:::._::::::._:::::::::::.:.::::::::::::::::::::::::::: :::::::.................:::.
File::TIPCIP_A.XLS 51 Printed 7/11/91 at 8:40 AM. ,
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
11 Div: Transportation Systems
Fund: 317
Proj: 033
Rank: 31
NPROJECT TITLE:
Maple Valley Highway - Maplewood Ave SE to East City Limits (WSDOT Project)
DESCRIPTION:
Widen existing roadway to 5 Lanes, provide new curbs, sidewalks, storm drainage, street lighting and
channelization.
JUSTIFICATION:
Will address highly needed congestion and accident concerns.
11
STATUS:
N Project will be funded entirely by WSDOT.
City Funds of $5,000 budgeted for plan review and construction coordination"by City.
Scheduled for construction bid ad in February of 1992.
CHANGES:
None.
FINANCIAL DATA
:.;.;:
a-.............0.u...E3c. . .......................:.....................:.....................................
0 000::...
:><:>::<:>;:>::>»:>::'..............:: .::::::::::::::::...::::.......................::.:......................................................::
Total Project Cost: 5, 00<:': ?i>{'FU,W-6d ':? 5 5,000
Spent Throughh 1990:
.. .`` :....... ........... ...
.:A -5000 : t 1991 Budget + Carr Over: ...............
ii Remaining Cost: ..
I' Period
Peri :Tota[:.
y992:?:::::;: :::.. 9:993;:::'> E:z; 19 .::.;:; .::<:%::::: 995 .>': .::::<;;>1999 ::>;::<: 997.
EXPENSES:
Project Development
Precon Eng/Admin
J, R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
T
QT
..........
............................................... ...................... .....................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Harnd
Mitigation Proposed
Other
Unfunded
' FiLe:•TIPCIP_A.XLS 52 Printed 7/11/91 at 8:41 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works ,
Div: Transportation Systems
Fund: 317
Proj: 12083 ,
Rank: 32
PROJECT TITLE: ,
N 4th Blvd - Logan Ave N to Monterey Dr NE Project Development
DESCRIPTION: ,
Prepare a design report for widening N 4th St to a two-way boulevard.
JUSTIFICATION:
Will address serious safety and traffic congestion concerns in this area and reduce impacts on residential
neighborhoods in accordance with the North Renton Facilitation process and as directed by City Council
Resolution 2708.
STATUS:
Previously funded $50,000 to begin project development in 1991.
CHANGES:
None.
FINANCIAL DATA
u ;:.;.0
:: :'' :''t::::>::>::::s 8
:: .. ....................................................................................
n:> >:>:;:o:;:>;:;:;;:<:
:::.80 000 80 000'::::.
:.;:.;:.;:.;:.;:.; .........................................................::.
Total Project Cost: 80,000 : `fUC?d2Cl ' ?:::::::.:::::.:•::::::::•._::.::•::::::::::::•::::::::::::::.::::::::::.:::::::::::::::::::::::::.
Spent Through r u 0:
oh 199
.....................
':':.<: >'::F < '>
1991 Budget Carry Over: 50,000'.::::: '
Remaining Cost:
Period
..14395
,..;.,..;.•.::;;::;:;:;:<»:,::::::;.;ITEM............. .. ;Pe. _ .'CcttaL. .. ..x992.:...... . .::'i94l3....... t_94 ....
EXPENSES:
Project Development 30,000 30,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
Vit} ' FfS S................................ ..............'3(1,OC1Q....:..............,........ .............................:.:.:.....::::.:::::::....: .::::.:..::.....:.::..:.....::.:::::::................:::::::::::::::::...::::.....
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30 000 30,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTAL;SOURGES
000> ... 30 DQ0. <' ^.: x'E:r>. . :::::::;; :rr:::»z>:::>::::..: ............:::::::::::
File:•TIPCIP_A.XLS 53 Printed 7/11/91 at 8:42 AM. ,
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12126
Rank: 33
PROJECT TITLE:
Talbot Rd S - S 43rd St to South City Limits.
DESCRIPTION:
Reconstruct roadway prism in areas with failing pavement and sub-grade conditions and sub-standard cross
slopes. Overlay the reconstructed roadway as part of annual overlay program.
' JUSTIFICATION:
Poor existing roadway conditions are a safety and maintenance concern.
STATUS:
' Evaluation of existing conditions will be done in conjunction with
Pavement Management System inspections and analysis.
' CHANGES:
Changed from a study to an improvement.
FINANCIAL DATA
:::::::.:.::::::.:..:::.:::.::::::::::.::.
T ..
:::.......................::
otal Project Cost: 330,000 €'`: -:: L ded 330 000 30,000 300,000
S
nt Throu h 1
990:
Pe
9
1991 Bud et a r
C r Over:
> `.:':: riled '>::;;:;:.;:..;;;:.;;:.:;.::::
9 {lrtfu. ....
Remaining Cost: 330C)t30
Period
....x:. .
EM> :.PerTa� ptat> ...... .. .;:.:_;.:. ...»:.»::> «<:>::;>:
:..:::::::.:...:.....:......IT _........ __.7 X992 ..:.: :....:.:i9g t99a::: .. #995 :.;:::.> <::<:::?:<199R�::....:..:.. .:� 8�.::..::.
EXPENSES:
Project Development
Precon Eng/Admin 40,000 30,000 10,000
I R-O-W (includes Admin)
Construction Contract Fee 265,000 265,000
Construction Eng/Admin 25,000 25,000
Other
Tfl
TAi.aEO(PEN E .:.>:;>:.;:
:::::::::::::z:>:>::>:::>;v 33(}x000 30,x...... .. e04 ........::;:.;:.;:.;;.;:..;: ....::::..::::::::::.:::::. .:::::::.:.: .::
1 .......... .:.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 30,000 30,000
Vehicle License Fee 300 000 300,000
Grants In-Hand
1 Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hard
Mitigation Proposed
Other
Unfunded
30 000
TOTAt„SOU C S . .:................. 3.. .000;
File::TIPCIP_A.XLS 54 Printed 7/11/91 at 9:05 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 19917
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works '
Div: Transportation Systems
Fund: 317
Proj: 12107
Rank: 34
PROJECT TITLE: '
TBZ Project Development
DESCRIPTION:
Transportation Benefit Zones are areas of rapid growth within the City. To determine and fund transportation
improvements necessary to support new development, traffic studies are performed which recommend
projects and determine appropriate fees to charge as part of the mitigation process. This project supports the
necessary planning effort to develop and revise TBZ studies and manage the funds collected. '
JUSTIFICATION:
Creation and management of Transportation Benefit Zones are an integral part of planning transportation
improvements and ensuring that new development pays a fair share of the cost.
STATUS: ,
TBZs have been finalized in the Valley and Grady Way areas. Interim TBZs have been established in the
NE 3rd/4th and NE 44th areas. Ultimately, a city-wide impact fee system will be developed as part of ,
the Transportation Plan process.
Previous Funding: Project Development = $115,000.
CHANGES:
None
FINANCIAL DATA ,
v..a............8.....t �. e. ......................................................................:.:.:.:...::::.
Total Project Cost: 115,000:>;» Fettled ;; 115,000 115,000::: :::::::::::::::::::::: ::::::::::::::::::: .::::::::::: ::::::
Spent Through 1990:
Pe
9
11 000::::::: >
1991 Bud et Carr Over: 53lnfu ed.
9
Remaining Cost:
Period
>: Y .... ......... S > : :::::::::::;; .... Ttal: : ':: :>;: 99 ..> : :t997>
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
::.;:.;::.;::.:;.;::.. :;:.:::. .........
S ;;:.:.:.:,;:>; .:: ;.:.; ;>:<::::>::»>::c»::: :::;>:>. ........ .............:..::.. .... .
tnAi� XN �5................:.....:.:::...................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.O.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
Tt}T S UR, ................. .
.. ..
File::TIPCIP_A.XLS 55 Printed 7/11/91 at 8:44 AM. '
CITY OF RENTON
' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
' CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12106
Rank: 35
PROJECT TITLE:
Missing Links Program
DESCRIPTION:
This funding provides for the completion of transportation links that do not qualify for other sources of
funding. An example would be a section of roadway between two LID's or between two developer
mitigation improvement projects.
' JUSTIFICATION:
Making the necessary, and often small-scale, improvements needed to connect other projects can achieve
' significant benefits.
STATUS:
Program has functioned well for its intended purpose, providing for timely and cost effective facilities
' to be installed.
Previous Funding of $320,000 will be used in 1992: Preconstruction E/A = $35,000; ROW = $64,000;
Contract Fee $205,000; Construction E/A = $16,000
' CHANGES:
Level of funding adjusted to reflect only solid sources of funding.
FINANCIAL DATA
.........................................................................................................................................................................
................................................................................... ....................................................................................
::: ::.r.:::>::>:>:;: u:.:
a t..........#... .. ...F°ea.. ....................................................................................
Total Project Cost: 1 446 000::><>< z' ''''6 �'..,:.: ;:.;:.1.,446 000.::::.44.::::.
1 funded..:..
1�...6,000.... ........ .. .. .. ..
Spent Through 1990 ......... ... . .........
f . .........
01991 Budget + Carr Over: 4600
�,...
Remaining Cost:
Period
»::>:: [EM<::>:::>::>s:>:>:::<:>:>: ::PiTirta[:< ::>::>:::> 992::>::;> >:>:>:::<>:1993:<:::»:'<:::>::>::>:>:994:>::>::»::>:::>::>::::>:::
: >::>::>:<::: >; 1. .................... 99v;;:<•;>;: >;;;:.;;f:996a9B7:;.;:.;>;;:.:
EXPENSES:
Project Development
Precon Eng/Admin 110,000 22,000 22,000 22,000 22,000 22,000
R-O-W (includes Admin) 200,000 40,000 40,000 1 40,000 40,000 40,000
Construction Contract Fee 640 000 128,000 128,000 128,000 128,000 128,000
Construction Eng/Admin 50,000 10,000 10,000 10,000 10,000 10,000
Other
�r�t. �trss.;;;;:.::.:._:::;:;<;..;:;;;;,.:: ::::»:::; oar. ;;;,:; ;.. 0000; ....:MAW".: ......... Q Sao :>::::>:::>:> >: zooa00
::::::::::::::.::::::::.:.:::.:::::.:::::::.::::.::::::.,.::::::�::::.:: ................. . .................,........ ....: .................x.................... ........ ..:......::.......:,...:..:.
:....:.:.....:......:..::. ............................... .......................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
' Business License Fee 1 000 000 200,000 200,000 200,000 200,000 200,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
1 L.I.D.'s Formed
L.I:D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
' Other
Unfunded
I <i::::> 000 000: :. :::': ::: ..
T,OTALSOURGE :.>;:.>::> ;:;:;:<::>:::.:>[ _.. 200,000 200,000 . ..:;:200,000 .......<20%W: :::7700000::
File::TIPCIP_A.XLS 56 Printed 7/11/91 at 8:45 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12116
Rank: 36
PROJECT TITLE:
Oakesdale Ave SW- Monster Rd to SR 900
DESCRIPTION:
Construct new 4 to 5 lane arterial with curbs, sidewalk, drainage, street lighting, traffic signals,
channetization, retaining walls and bridge structure. Monster Road Bridge project may be combined with
this project.
JUSTIFICATION:
Will serve growing north-south traffic demand and reduce congestion on Rainier Avenue and Grady Way.
This project is included in the Grady TBZ and will serve and be partially financed by development in
those areas.
STATUS:
Initiate project pre-design in 1992.
Grady TBZ: River Tech $70,236; Blume Distributers $254,791
CHANGES:
New project in TIP. ,
FINANCIAL DATA
Total Project Cost: 9,450,000::.....:> eCl >:< 325,000
10,000315,0
r :::...SPent Through 1990: :::: :. :: :::... .. .............................
1991 Budget + Carry Over: :'::<::Uiflitded ::: 9,125 000 4,725,000 4,400,000
Remaining Costy?�ri4iQ
....:.......:................
Period
II EM;.;
'f<iW::: <>::>::<::::'1.992:::;;•;:::.:;;;;>:>;:. » ::>:::::<:>::::::>: >::>;:<_:»:rs::>: :.;:.;;;;; :
.... .........1993 .. ::.... 1994.... 1995... .::.::::.:.::1996 ',997 .....::
EXPENSES:
Project Development
Precon Eng/Admin 1,217,000 50 000 50,000 500,000 617,000
R-O-W (includes Admin) 500,000 500 000
Construction Contract Fee 7,160,000 3 580 000 3,580,000
'
Construction Eng/Admin 573,000 286,000 287,000
Other
:......:..:.:::::::.::::..:::::. ..:.:::. ..:::::: ..45.. >:..... }CQO ,DOG ...... 50 ,Q04..,<::.. .��,'0(lQ:..;;;>;:.:3'$
............. ................................................................::::...:::...... .......l.......1........ }.. f.......f.........
SOURCES OF FUNDS: ,
1/2 Cent Gas Tax
Business License Fee 10,000 10,000
Vehicle License Fee
Grants In-Hand
Grants Proposed 4,725,000 275 000 650,000 1,900,000 1900000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand 315,000 40,000 50,000 225,000
Mitigation Proposed 414-00-10-0-0- 467,000 1 966,000 1,967,000
Other
Unfunded
1117;000
File::TIPCIP_A.XLS 57 Printed 7/11/91 at 8:25 AM. '
' CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
' CONTACT: Lee "aro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund:
Proj: 121 12114
Rank: 37
PROJECT TITLE:
Bronson - Houser Corridor Project Development
DESCRIPTION:
This program provides for an operational analysis and evaluation of neighborhood impacts of alternatives to
the Bronson - Houser couplet. A design report will be prepared.
JUSTIFICATION:
This is a critical corridor for the movement of traffic into and through the City. The goal is to provide reduced
congestion at the intersection of Sunset Blvd and Bronson, to reduce the need for traffic to bypass the signal
' by cutting through the neighborhoods.
STATUS:
Approved by the Council in 1991 budget for $288,000 to design and construct. Decision has been made to only
fund Project Development at this time. Previous Funding: Project Development = $50,000
CHANGES:
' New project in TIP.
FINANCIAL DATA
.........................................................................................................................................................................
................................................................................... .......................... .........................................................
z.........ak a............8.... ...Fee. ....................................................................................
000 ...................... .....................................................
.. ....... ::......................::.::.....................................................::
Total Project Cost: 50,000 «< FtlttleCl '< 50,000
50,000 . ..............:: :: .:
Spent Through 1990: . ................................
1991 Budget iCarr Over 50,000::... d :
::.
Remaining Cost:
Period
` : :::i:<:zr:r : : :..... 97: :::?>::;::.;:>:« »:: : g .;..... ,:; .
..
EXPENSES:
Project Development
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
T .
' SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hard
Grants Proposed
' L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
+ iS'iiii: .... :::::::::::::::::::: ::::::
' TOTAL.SOU RC S
File::TIPCIP_A.XLS 58 Printed 7/11/91 at 8:48 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12118
Rank: 38
PROJECT TITLE:
S Grady Way/ Rainier Ave S Project Development
DESCRIPTION:
This project will grade separate Grady Way and Rainier Ave and provide ramps to connect them. Included
will be new roadways, curbs, sidewalks, structures, drainage, signals, lighting, signing and channelization.
JUSTIFICATION:
Increasing traffic demands in the area, including proposed development of the Boeing Longacres site, will
create the need for increasing the capacity at this critical intersection.
STATUS:
Will be evaluated as part of Arterial Circulation Study.
CHANGES:
New project in TIP. '
FINANCIAL DATA
Total Project Cost: 90,000 €€>> fltclecl 90,000 30000 60x000
Spent Through
1990:
....... ............."... ``
.... ......
uit1991 Budget + Carr Over: 3f.
Remaining Cost: $4OOQ
Period
E -
;::; »::<s:r ::::.... '
992........ . .......3.993. ....„... 1.994 >s'�995 :»>: >?>':>:::<1996 1997»::::>:>;:.
EXPENSES:
Project Development 90 000 30 000 60,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
004 .... .. 440: >:>::::>:::>:<5 »:::::;»::;::
F1SS..:.:::;:.::.::::.:.. 400 ..........::.. ...... ,..:........,........:.:::::.:::::.;:.;:.;:.;:.;::.;:.;:.:;:.;;:.;;;:.::: : ...:
....................................
.............................
SOURCES OF FUNDS: ,
1/2 Cent Gas Tax
Business License Fee 30,000 30,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed '
L.I.D.'s Proposed
Mitigation In-Hand 60,000 60,000
Mitigation Proposed
Other
Unfunded
O T
_
File::TIPCIP_A.XLS 59 Printed 7/11/91 at 8:49 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
' DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
' Proj: 12115
Rank: 39
PROJECT TITLE:
Miscellaneous Traffic Safety Program
DESCRIPTION:
1 This program provides for special small-scale traffic safety improvements that are identified and require materials
labor or equipment beyond the normal scope of City maintenance crews.
' JUSTIFICATION:
Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for
safety projects to address these needs. Projects are typically identified through citizen concerns, analysis of j
accident records or observation by City Traffic Operations and Maintenance personnel. ]I
' STATUS:
On-going yearly program.
Traffic operations section identifying and prioritizing locations.
CHANGES:
New program initiated in 1991.
FINANCIAL DATA
::rn>:::::: : ?'> : >>»<> >< <
tat.::::::..:Sus.Eta. ea. .::::::::..:.::::::.:::.::..:. :: . :::: ::: ::::::::::::::::
Total Project Cost: 300,000::::::;:::i:;:fstidedt:: 300 000 300,000
:::: ....:: :.:::..::::::::.:::.::::::::.: ::::..:_::.::::::.:::::::::.::.::::::.
Spent t Through99
1 0:
99
1 1 Budget Carry Over:
Remaining Cost:
Period
::::>:;»:3:993:>:>:::;:::>::>::>::;::>:::.
' .. ....... 1:9.94......: .:.....1996...... ......1.998 ::.:: . .....1997::. .<.
EXPENSES-
Project Development
Precon Eng/Admin 30 000 5,000 5,000 5,000 5,000 5,000 5,000
R-O-W (includes Admin)
Construction Contract Fee 270,000 45,000 45,000 45,000 45,000 45,000 45,000
Construction Eng/Admin
Other
I.::.:.::::::::.::.:.:::.:::: 30D;OOQ. ..... .SQ,04d '; '4 ><:>:::>f...54' OQ
........................................ ...............:......:...:. ........:.............::.........:..:....::�....::::: ::.:...:•::..:.......:. s .::: : OQO ;:.::.:::.:.;;:;_;;50,
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
' L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
' Unfunded
TOTAL<SWJACES 300 D> 5D OD0 <:... :,.80 D00 80`D00 :..:,.::.50>00(f'. 8000Q :.:•.:;:::::::::fit} D
File::TIPCIP_A.XLS 60 Printed 7/11/91 at 8:23 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 073
Rank: 40
PROJECT TITLE:
Guardrail Program
DESCRIPTION:
Replace existing deteriorating guardrail and install new guardrail sections where needed.
JUSTIFICATION:
Properly designed, located and maintained guardrails perform an important safety function in areas where needed.
STATUS: t
On-going yearly program.
CHANGES:
None
FINANCIAL DATA ,
><!...
:....:.:.................................... .....................................................................................
Total Project Cost: 331,500 331,500 331,500:::::.::::::.::::.:::::::::.::::.:::::::•::::::::::::::::::::::::.:::::::::::::::::::.
Spent Throughh
1990:
.:
.tnfurxl
...... .. .... ............................
.:...... . .................. .. .. . . . ................................................
1991 Budget + Carr Over 315003::;:.1
Remaining Cost: ;;?; QtttipQ
Period
::»::::>::>::::>::>:': ::'>::>:::<:>::>:'::; <:>;'«'>?:»»><:>:>: >Pe .: ;Tota< ><::::>: 952...... ::::::::.9593::::;::>s::>::<:::»:<f99?I::::<:..........::. :.::::: »»::»:<:>:<::>.::< :<:»::»
... ................. 85s..................199fi........ ........_k99T........_
EXPENSES:
Project Development '
Precon Eng/Admin 36,000 6,000 6,000 6,000 6,,000 6,000 6,000
R-O-W (includes Admin)
Construction Contract Fee 240,000 40,000 40,000 40,000 40,000 40,000 40,000
Construction Eng/Admin 24,000 4,000 4,000 4,000 4,000 4,000 4,000 ,
Other
7QT+ . XPNSS'.. 4'OOQ: :::>:::>::>:>SQ 040 ::;:: :.: 0 G04 50`G00' 3U`04Q 400::
:.:......:.............:..:....... :. ,..._... .. ,.............:::::::::.. ... .: :::. ..:.:.:: .. ...50,OOG..
SOURCES OF FUNDS: ,
1/2 Cent Gas Tax
Business License Fee 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTRL :;:::>:;::: :::.<.:<:; >?;;.>::::>:::3 000 r:>:::><":50 000`.>::: :::•<. ::>;"::::::.:
__. _ OtJRGES ....... ............... �___. . ...._50,000; 50;000` 50000: '
File::TIPCIP_A.XLS 61 -Printed 7/11/91 at 8:37 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
' Fund: 317
Proj: 075
Rank: 41
' PROJECT TITLE:
S 192nd St / S 200th St - SR 167 to SR 515 Project Development
DESCRIPTION:
Prepare a feasibility, route and environmental analysis for the City of Renton's portion of a new East-West
principal arterial.
JUSTIFICATION:
This is part of a four-agency (Kent, Renton, King County, SeaTac) study for development of a new
' East-West principal arterial from I-405 to 140th Ave SE.
STATUS:
' TIA grant of $200,000 approved. King County to provide $35,000 and City $15,000. Total = $250,000 for
project development.
$95,000 carryover to be spent in 1991.
' CHANGES:
TIA grant has been approved.
FINANCIAL DATA
Ota < 'E[ : :.'u$
.:.:.:.:.:..:............:.:.:....::::::: ;.;:.;;;....::::.............:::::..................................................
. ..........H. t o . rai is > >:: :: r:<::>:>::::>:»:::>::::>:>:::::::
Total Pro' ....... ... ..
>:>:; ::.......:.::::::::::.:::: ::;::::.;::;;::::::::::::.:::::::.....
ect Cost: 250,000[' <»; 1+iinded<< 250 000 15,000 200,000 35,000
S nt Through 1990:
Pe
9
991 r
1 Budget Car Over: 95 000? »' '"nded '
9 . lTrtfu _ _ ...
Remaining Cost: < ...;:......
' Period
1 1 »::::::
per€odTo#al ........_992....... : _993 1994::; 1995...:::....:..:..f9$6 .. ,:::::...1997
EXPENSES:
Project Development 155,000 155,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
TAL: (PEN E :.>:::
S <:>:::.... . 0: :::::.::.:.155 0
...2!!)!......................4........ .................................................:... ..................................................................................
:::::::::::::::::::::::::::: ::::::::::::::::::::::::::.�:::::: >:;;;;ii:>::::............. .....................................................................:.......:..� ::::::::::::::::::::.:::::. ............:::::::::::::.:.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand 120,000 120,000
Grants Proposed
' L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other - King County 35,000 35,000
Unfunded
QTAL.$ FfGE 15;�000> E3S' 00:: ..........- ...... ......1....iiil
,.:..
File::TIPCIP_A.XLS 62 Printed 7/11/91 at 8:52 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12128
Rank: 42
PROJECT TITLE:
S 3rd St / Smithers Ave S / Logan Ave S
DESCRIPTION:
Remove signal control from Smithers & rechannetize intersection.
JUSTIFICATION:
Will improve corridor signal coordination.
STATUS:
Will be influenced by CBD arterial Circulation Study.
CHANGES:
None
FINANCIAL DATA
:.;:.;:.;:.....;:.;:.;:.;:.;:.......;::::,:.:..
1*:""`-*'< ..H
Total Project Cost: 130,000*-:,.:.:,*:.::.::.::.::.::,::',1 n ed30 000 30,000
U
-. .. . .
Spent Through 1990: > > > >< >>:`:z » > >»> >'»>
1991 Budget + Carry Over: >(Iinrferl 100 000 100,000
Remaining Cost:
Period
. :;::.»;:;;::;:.;:ITEM
9
EXPENSES: '
Project Development
Precon Eng/Admin 20,000 20,000
R-O-W (includes Admin)
Construction Contract Fee 100,000 100 000
Construction Eng/Admin 10,000 10,000
Other
X30
00(}
T..OIAt (P,ENSES..:; 1..._> .......:. .................f.................... ........
................................................................................................. ........
SOURCES OF FUNDS: I ,
1/2 Cent Gas Tax
Business License Fee 30,000 30 000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed '
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 100,000 100,000
t0
3 000 >`.:; >'>°:
70TAL.SOURCES ;` ........ ..::::::: ,::::: :.
Fite::TIPCIP A.XLS 63 Printed 7/11/91 at 9:07 AM. ,
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12122
Rank: 43
PROJECT TITLE:
Monroe Ave NE - SR169 to Sunset Blvd NE Project Development
DESCRIPTION:
Prepare a design report for a new roadway, including curbs, sidewalks, street lighting, roadway
resurfacing, channelization and storm drainage from SR-169 to NE 2nd and evaluate connecting Monroe to SR-900
(Sunset Blvd) as a through route.
' JUSTIFICATION:
Additional North-South route required to meet growing traffic demands.
STATUS:
Will depend on whether development occurs in the area between NE 4th St and SR-169.
CHANGES:
This route changed from Edmonds to Monroe.
FINANCIAL DATA
.....................................................................................:..............:.:.............:....................................................
................................................................................... ....................................................................................
.............................
Total Project Cost: 50,000 ;; ;; iindecl € 50,000 50,000
Spent Through 199
0.
................... ...................... .......................
1991 Budget Carr Over: d'"d
9 ...
Remaining Cost: f'5(I
Period
.:`:::>:::.. Period:T4tal::;::;.:<:::>:.1 1: :::>'.....1 .........
............... .... 992 .,....x993:>: ::.. .....X994::: ;;::,>.;;:.;. 595...::::. .: :.::. 996........ .........99�.........
EXPENSES:
Project Development 50,000 50,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
SO :::> ':. ;: :;:::;::> :<:: "So'000: :<::> ::» <> `.::` ' » : :>::::>:::: «:::>::>::::>:
.................................................................... ............................ ................................................................................. ...................................................................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
' Business License Fee 50,110 50,000
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
File::TIPCIP_A.XLS 64 Printed 7/11/91 at 8:58 AM.
r
CITY OF RENTON '
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works '
Div: Transportation Systems
Fund: 317
Proj: 12123
Rank: 44
PROJECT TITLE:
Duvall Ave NE - Sunset Blvd NE to North City Limits Project Development
DESCRIPTION:
Preliminary Engineering study for widening roadway to 5 lanes, includes: curbs, sidewalks, storm drainage, ,
street lighting, channelization, and bikeway..
JUSTIFICATION:
Growing residential areas use this route which is also becoming a major through route between Renton and Bellevue.
STATUS:
Will be evaluated as part of Arterial Circulation Study.
CHANGES:
None
FINANCIAL DATA
.T > ... .
B. .Lee <s>»><><s`>'< <` `>> > > >> >><>"`%>
?:......... ::::::::::::::::: :: ::......................:: ::.....................................................::
Total Project Cost: 50,000:::::::::::`-'.-.-: und'ed : 50,000 50,000
Through 1 0:
Spent ou 99
9
PeX.
...................... .............
Carry Over:991 Budget C "<>'ak:fu
1 9 _. '
Remaining Cost:
.....................:........
Period
..:.;x:99?.;...:. 1994.:::.; ..... #995....; 1999.. .. .. E997
EXPENSES:
Project Development 50 000 50,000
Precon Eng/Admin '
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
. ..........
00 ......::: :::::...
T.t)TALC(E�NSES................................:::.::.::::::SSfxDQO: :::::;::;;»::>:.::;;;........ ....................:..::..::::;::..;..;::::�.::::::::.::::::::::::::::::::::::::..::::::.::::::.::::::::::::.::::::::::::::..:::.:...:..:.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee 50,000 50,000
Vehicle License Fee
Grants In-Hand ,
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed '
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded
TOTAL:SOURCES ;::;:;;:>;>:::. 50 _....... .. ......
File•:TIPCIP_A.XLS 65 Printed 7/11/91 at 9:01 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
r •
CONTACT: Lee "aro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12127
Rank: 45
PROJECTTITLE:
SW Grady Way - SR 167 to SR 515
DESCRIPTION:
Rechannelize and modify signals to provide a continuous eastbound lane from SR 167 to SR 515.
Develop capacity, safety, HOV and property access improvements.
JUSTIFICATION:
Will improve traffic flow and reduce congestion on SW Grady Way.
' STATUS:
Projected for 1993 start.
1
CHANGES:
None
' FINANCIAL DATA
..........
at
............................................................................:06.......................................................................................
................................................................................... ....................................................................................
.............................
Total Project Cost: 260,000; ;[; F6nd J; 60,000 60,000
Spent Through 1990:
Pe 9 .d.
::::::::::...::::::..........:::.:.............
1991 Budget + Carry Over: lTrfuded ; 200,000 200,000
Remaining Cost: 26t#(1CH ;
r Period
;:STEM . ;:: .PerfodTotal>i f992 1993: 1894...:::::: ::::::'s.�99 199699 . ..:::
EXPENSES:
Project Development
Precon Eng/Admin 40,000 40,000
R-O-W (includes Admin)
Construction Contract Fee 200,000 200,000
Construction Eng/Admin 20,000 20,000
Other
TAL£XlNSES
. ...... .................:...... :...:
rSOURCES OF FUNDS
1/2 Cent Gas Tax
Business License Fee 60,000 60,000
r Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 200,000 200,000
'
TOTAL:SOURCES..
File::TIPCIP_A.XLS 66 Printed 7/11/91 at 9:06 AM.
CITY OF RENTON ,
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems '
Fund: 317
Proj: 010
Rank: 46
PROJECT TITLE:
I405 / SR 515 Project Development '
DESCRIPTION:
Prepare a design report for the construction of new I-405 rams to and from the north at SR-515. Scope
project in 1992. Request grant funds in 1993.
JUSTIFICATION:
High traffic volumes on SR-515 now have to pass through, and contribute to, the most congested areas of
the City to access I-405.
STATUS:
Will be evaluated as part of the Arterial Circulation Study.
CHANGES:
None
FINANCIAL DATA
:::::::::::............:..:..........:........................... ....................................................................................
Total Project Cost: 60,000:",,.'.-":"-'-.' ft'h' 4&
Spent Through 1990:
<:»<[lf2futlttet%<; ; > E;<>EE` E :E?''«iG# r<'<'»E<iGiE3>33iY2i3iifi%iiis'
1991 Budget + Carry Over: ::a;;:;lifunett 60,000 60,000 '
Remaining Cost: ;;;5t1p (f ;":
Period
.; :.;>: :.::.ITEM'
T I 199 . 4? 1
..... ::.:.:.. Pe od. . 1 ....992.............. 3 199 .... 995....; 99B........... ......99 .......:
EXPENSES:
Project Development 60 000 60,000 '
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
TQTAL EXPEMiSE »::>::>::: :p
... ..............................................................xxxx
................... ...................................................................................
SOURCES OF FUNDS: ,
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee '
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed ,
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 60,000 60,000
T4.SOURCES 64 000: .. .....>::.:::...... "60 004
File::TIPCIP_A.XLS 67 Printed 7/11/91 at 8:51 AM.
CITY OF RENTON
' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
' CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
' Fund: 317
Proj: 12120
Rank: 47
PROJECT TITLE:
SE Puget Dr - Jones PI SW to Edmonds Ave SE
DESCRIPTION:
Roadway reconstruction and resurfacing to include: curbs, sidewalks, street lighting, channelization and
storm drainage.
JUSTIFICATION:
This project would extend the improvements of SE Puget Drive further east into the growing residential area.
STATUS:
Depends on growth rate and availability of funding.
CHANGES:
None
FINANCIAL DATA
................................................................................... ....................................................................................
Total Project Cost: 10010,000::: :: ;>:: anded :
h 1
Spent Throu 990:
1991 Budget + Carry Over:
unfunded,,:; 1,010,000 1,010,000
Remaining Cost: ;a:3.:t#DtIO;
Period
:.:: ....TT ................
::::. _ ... 99 ...... ... :. 94 .... ...... . ..:...._:.::.>:.:.>.. a$_....... .........9J .........
EXPENSES:
Project Development
Precon Eng/Admin 136,000 100,0D0 -36-10-00
R-O-W (includes Admin) 10,000 10,000
' Construction Contract Fee 800,000 800,000
Construction Eng/Admin 64,000 64,000
Other
TOTAL EX . N
PE.VSs>«< <:<>:<>'::»:: i:> ::; >:>::>: 01iF >::>:::>:::>:::>:::>::;::`......<'......:>:<.» «>: DQD00 SiO :>::»:'::::»::>::>;:::.>:.>:>;: ..;::::> :::<:::>:::>::::>:::::::>:
�....... ............................ . ..:......�.........::
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hard
Grants Proposed
' L.I.D.'s Formed
L.I.D.Is Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 1,010 000 100,000 910 000
::.;r.:: ;�:>::;:.>::>:.:::: ..;: :;.;;.:.;.:. .;:.;:.;:.;.;:.:: .:::>:.;::i::.;.:::
OT ?::$pURCES::..::.... Q!p'QQ :: ::: _ 00'000 :..:::::910OOQ
' File::TIPCIP_A.XLS 68 Printed 7/11/91 at 8:53 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997 ,
CONTACT: Lee Haro ,
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12124
Rank: 48
PROJECT TITLE: '
N Park Dr - Lake Washington Blvd to I405 Project Development
DESCRIPTION:
Conduct preliminary engineering study to facilitate traffic flow on N Park Dr to and from 1-405, including i
analysis of high occupancy vehicle facilities.
JUSTIFICATION: '
Extremely high traffic volume area impacted by Boeing/Paccar industrial traffic and by 1.405 overflow traffic.
Providing HOV access on Park to and from I-405 is much desired by Metro.
STATUS:
TIA grant to be sought with Metro and/or WSDOT to be requested to provide the "other" funding.
Ali
CHANGES:
None
FINANCIAL DATA
:::::.:::.::.:::.:.:::::::...................................................... ...................................................................................:
Total Project Cost: 60,000:;:;:;;:;? vnded;
n Through 1990: jj� th
Spent L71� f1$'6»? i>i1L/t13Vt'i�iitasi>isiiasisi«tasisi ! ii< iiiiiiiiii<'ii <
Pe 9 .. .... .::. ::..... ..:..::,::::::.. ..:.
1991 Budget ; Carr Over: lfntunded:. 60 000 30,000 30,000
Remaining Cost: fit1 (Slx
Period
::;.::.::.: ::<.:;;;:;:f ' : t. .::,::...... ;:.; .. :i:>:>::: :>: :>:i: : :i::;
>»>: >>e6, i o: r:a... .:....<.:.:.:.;.:.:.
.E.
EXPENSES: '
Project DeveloprTLent 60,000 60,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
. ..... 00 .::.::::::>::.>::.;:.:::..................I. . ... ..:...:.::.:::::::: ::::. :.::..;:;:.;;:.:.:;.;:.;::::.:;.:::..
7Y)TAL (P£NSE3:::.::.::::.:.......::::.::::...::.......:........x.:.....................:........... .....................:... :::::::.......................................................................... ..........................:..
............................................ ............................ ...................................................... .......................... ...................................................................................
SOURCES OF FUNDS: '
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed (TIA) 30,000 30,000
L.I.D.'s Formed ,
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other (Metro/WSDOT) 30,000 30,000
Unfunded
T ;;..::..:
6p'000 60
Fite::TIPCIP_A.XLS 69 Printed 7/11/91 at 9:02 AM. '
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12125
Rank: 49
PROJECT TITLE:
Aberdeen Ave NE - NE 20th St to NE 27th St Project Development
' DESCRIPTION:
Prepare a design report for reconstructing existing roadway, provide curbs, sidewalks, street lighting, water
and sewer mains, channelization and new traffic signal at NE 27th St and Aberdeen Ave NE.
JUSTIFICATION:
Project will be needed when water and sewer are extended into this area and development increases.
STATUS:
Will depend on land use actions that occur in this area.
i
CHANGES:
None
FINANCIAL DATA
Total Project Cost .....................................................
I 40,000:::>:;:;:;:funded*-
Spent Throughcl
1990:
1991 Budget + Carry Over: frirterl' 40 000 40,000
Remaining Cost: <`4t1 :
.......
Period
3T M.:..................... .:Pe >::..:>:' ::
::...::.:....;::.;: T9#aI. X992 .:.:: ..
' EXPENSES:
Project Development 40,000 40,000
Precon Eng/Admin
R-O-W (includes Admin)
Construction Contract Fee
Construction Eng/Admin
Other
TOT >>
AL .PE
NSI=S::»: :»»::>»>:»>::::>::> »::>::>::>::<.:::>' : :.
.......::::::.:::::::::::::
0.........:..:::..:::..::::.:.:::::::::..:!30,0D0............................ ..................:..::.::..::::....::.:............. ............................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 40,000 40,000
Other
Unfunded
O'i•AI✓:SQ3IRGES:::':;::<> <>:> ,: :;'> :...40000 ;':>`.:> �9 000
File::TIPCIP_A.XLS 70 Printed 7/11/91 at 9:03 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works ,
Div: Transportation Systems
Fund: 317
Proj: 12129
Rank: 50
PROJECT TITLE:
Benson Rd S / S 31st St
DESCRIPTION: '
Install a complete actuated traffic signal at Benson Rd S and S 31st St designed to provide for possible future
Benson Rd widening.
JUSTIFICATION:
Location is approaching signal warrants and traffic volume is increasing. Signal will reduce side street delays
and improve safety.
STATUS:
Projected for 1993 design start.
i
CHANGES:
None
FINANCIAL DATA
............................."�
............................. ..........................................................................................................................
................................................................................... ....................................................................................
................
..............
Total Project Cost: 130,000 ;#€aE nle,
Throw h 1990
$ nt <Mari[s. 's<;:.;rittnd;:.;:::> '?> >> > > [ [> '>> > <[? ;':`
1991 Budget + Carry Over: an� ned 130,000 106,000 24,000
Remaining Cost: 30, :
Period
::>»:>>•..:>.::::::>>:>::.:.»:; EM.....:::;:>::><::: :::;:::. Per(od;Tota{: 1 i t9 4.. 1895 .:
LT_ __..... . ........... _.. _ _. 992 .........993. 9 ...
EXPENSES:
Project Development
Precon Eng/Admin 20,000 20,000
R-O-W (includes Admin)
Construction Contract Fee 100,000 100,000 '
Construction Eng/Admin 10,000 10,000
Other
flTAL: XPENSES »:>;>r ::>::
1300�0> 20,OOi3' 11t1QO0 ........::;:»::>: :>:z<... .
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee '
Vehicle License Fee
Grants In-Hand
Grants Proposed 106,000 15,000 91 000
L.I.D.'s Formed ,
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 24,000 5,000 19,000
Q Eft SdUfiGES.. ;: ;330 000 ». 0,00Q'
0,000
File::TIPCIP_A.XLS 71 Printed 7/11/91 at 9:08 AM. '
CITY OF RENTON
' SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 . 1997
' CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12130
Rank: 51
PROJECT TITLE:
S 3rd St / Rainier Ave S
DESCRIPTION:
Design and construct a signal modification to provide for exclusive double left turn southbound lanes.
JUSTIFICATION:
Will improve traffic capacity and reduce delays.
STATUS:
Projected for 1993 design start.
1 CHANGES:
None
FINANCIAL DATA
:::>:> »: >:<:> >:>:::;>: ..............................................
Total Project Cost: 54,000s': iinded
Spent Through h 1990
Pe s ....:::£�t�fundezt.:. ::::::::.:::::............:.::
1991 Budget + Carry Over: ;Iinfiel 54,000 44,000 10,000
Remaining Cost:
Period
Perms otai; .::.......1 3'::::::::> »..t 4.:::;:: :::»::::>:::
T __.. " 9 ....... ....... X995.:...,.. :::...:.195 ::..... X997
' EXPENSES:
Project Development
Precon Eng/Admin 8,000 8,000
' R-O-W (includes Admin)
Construction Contract Fee 42,000 42,000
Construction Eng/Admin 4,000 4,000
Other
S£5:.......................:..........
.. ..............5(l 0. ........ 4 .::::.: .::..::::TO 0 : ....:::::.
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
' Grants Proposed 44,000 44,000
L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded 10,000 10,000
T TALI: R E .......:... .
0 C 4'400
' File::TIPCIP_A.XLS 72 Printed 7/11/91 at 9:12 AM.
CITY OF RENTON t
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works '
Div: Transportation Systems
Fund: 317
Proj: 12131
Rank: 52
PROJECT TITLE:
S 2nd St / Rainier Ave S
DESCRIPTION:
Relocate existing east-west crosswalk to eliminate ped-vehicle conflicts. Construct pedestrian island in
middle of S 2nd St from which pedestrians can cross Rainier Ave.
JUSTIFICATION:
Enhances pedestrian circulation and safety and provides for enhanced signal operation and coordination.
STATUS:
Projected for 1994 design start.
CHANGES:
None
FINANCIAL DATA
«total > > z>;>>> >': > > >[[> > .....:< »< < <>< >
::>::::>::::>:::::::: :::::..:....:......... .......................... ....................................................................................
Total Project Cost: 234,000::
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works
Div: Transportation Systems
Fund: 317
Proj: 12133
Rank: 53
' PROJECT TITLE:
Sunset Blvd NE /Anaeortes Ave NE
DESCRIPTION:
Realignment of intersection and construction of traffic signal.
' JUSTIFICATION:
Safety and operational characteristics can be improved by eliminating off-set of intersection.
STATUS:
Funding will be generated through development mitigation.
CHANGES:
None
FINANCIAL DATA
.:..... ...........:.:...:.:::::..:.:..:: . ::..:::::::..:::::::•:.. ::.::::::...:.::.::
.......................................... ............................ .
.......................................................
Total Project Cost: 278,000' '...
uided >
S
pent Through 1990:
nn.
M .. .
1991 Budget + Carry Over: :;:;:.tfifiiiirteif 278 000 278,000
Remaining Cost:
2�8i
Period
<::>:::::5 Pe. sofa .:199
>::>:::>;::::::: _ 1992 1993 1994::::::::::::.:: :::::;:: 195<:;. E99y ..
EXPENSES:
Project Development
Precon Eng/Admin 36,000 36,000
R-O-W (includes Admin) 50,000 50,000
Construction Contract Fee 175,000 175,000
Construction Eng/Admin 17,000 17,000
Other
TOTALEXPENSES ......................... 0 .::>::;:::::;:::::_.:>:::;::>::::>::::>:::::
R7.8
:.......................... ............................... .................�..........................e................. ..............
........ .................................................................................
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee
Vehicle License Fee
Grants In-Hand
Grants Proposed
' L.I.D.'s Formed
L.I.D.'s Proposed
Mitigation In-Hand
Mitigation Proposed 2-781000 86,000 19210-0-0-
Other
92000Other
Unfunded
' File::TIPCIP_A.XLS 74 Printed 7/11/91 at 9:14 AM.
CITY OF RENTON
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1992 - 1997
CONTACT: Lee Haro
DEPT: Planning/Building/Public Works '
Div: Transportation Systems
Fund: 317
Proj: 12132 '
Rank: 54
PROJECT TITLE:
Other Valley Improvements '
DESCRIPTION:
Design and construction of transportation improvement projects identified to meet future traffic demands
within the Valley Transportation area.
JUSTIFICATION: ,
This program will construct the projects identified by the Valley Transportation Plan.
STATUS: '
Plan is being re-evaluated.
CHANGES:
None
FINANCIAL DATA
;;;:;;:.;;:...
...... .........................................................:..........................
Total Project Cost: 18,000,000 ........ tin a a;
:LtiY:«:<<::.:;: :»:: i :<<»»<><:«:>:: <:: <::>?» rtttttSPent Through 1990: >
......................
::...::.
:.:
1991 Budget + Carr Over: Urftnded 18 000,000 10,800,000 7,200,000
Remaining Cost. .,....,,to,OQQt)D ;
Period
ITEM : #993 1494; . 1993 :;' #996 ... t97
.
EXPENSES: ,
Project Development
Precon Eng/Admin 2,176,000 1,451,000 725,000
R-O-W (includes Admin) 2,000,000 1,000,000 1 000,000
Construction Contract Fee 12,800,000 6,40-0-10-0-0- 6,400,000
Construction Eng/Admin 1,024,000 512,000 512,000
Other
T TEXPENSES...::.!` 1'8 OOO DOO .. . ...... :::..:......
0 AL . . ............ ...... :< ':.::::::......::.. :.::......::......:.....:: :::::>: 451 000` 8 837 000 6 9i 000
.... ............ ..............:::....f .f:..... .......:..::;.......:..:::;.................................................... ...............�.... .......k....
SOURCES OF FUNDS:
1/2 Cent Gas Tax
Business License Fee ,
Vehicle License Fee
Grants In-Hand
Grants Proposed 10-18-0-0-1-0-00 1,471,000 5 182 000 4,147,000
L.I.D.'s Formed
L.I.D.'s Proposed 7,200,000 980,0003 455 000 2 765 j001
Mitigation In-Hand
Mitigation Proposed
Other
Unfunded ,
TOTAL SOURCES 18 000 006 ° a51 U0ff .:.:$''63700 5''9 t 000
File::TIPCIP_A.XLS 75 Printed 7/11/91 at 9:14 AM. '
ABBREVIATIONS AND ACRONYMS
The following list defines the abbreviated words or acroynms used in the City of Rent no 's
Six Year Transportation Improvement Plan 1991 - 1997.
BRAC - Bridge Replacement Advisory Committee
CBD - Central Business District
CIP - Capital Improvement Program
EB East Bound
ER - Emergency Relief
' FAS - Federal Aid Secondary Program
FAUS Federal Aid Urban System
HES - Federal Aid Hazard Elimination Program
HOV - High Occupancy Vehicles
LID Local Improvement District
METRO - Municipality of Metropolitan Seattle
' MUTCD - Manual on Uniform Traffic Control Devices
NB North Bound
Precon - Preconstruction Engineering /Administration before project is started
PS&E - Plans, Specifications, and Estimates
ROW Right of Way
SB - South Bound
SCATBD - South County Area Transportation Benefit District
SOV - Single Occupancy Vehicle
SWIBS - State of Washington Inventory of Bridges and Structures
TBD - Transportation Benefit District
TBZ - Transportation Benefit Zone
TDM - Transportation Demand Management Program
TIA Transportation Improvement Account (Administered by TIB)
TIB - Transportation Improvement Board
TIP - Transportation Improvement Plan
UATA Urban Arterial Trust Account (Administered by TIB)
VMS - Vehicle Master System
WB - West Bound
WSDOT Washington State Department of Transportation
76
t
_ _ �