Loading...
HomeMy WebLinkAboutRES 2592 CITY OF RENTON, WASHINGTON RESOLUTION NO. 2592 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, PROVIDING TRANSFER OF FUNDS FOR WATER AND SEWER CAPITAL IMPROVEMENT PROJECTS. WHEREAS, the 1985 Budget provided for the use of Utility Connection Charges, accounted for in Cumulative Reserve Fund No. 3665, as a partial resource for 1985 Water and Sewer Capital Improvement projects, and WHEREAS, the City Council has approved the 1985 Water and Sewer Capital Improvement Program listing as required by Ordinance No. 3665; said list attached hereto as Exhibit "A" and made a part hereof as if fully set forth, and WHEREAS, it is now necessary to provide for transfer of said funds from Cumulative Reserve No. 3665 (Utility Connection Charges) to the Water and Sewer Construction Fund, and such transfer being necessary and in the public interest and for the public benefit, NOT THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I : The Director of Finance is hereby authorized and directed to make the following transfer: FROM: Cumulative Reserve Fund No. 3665 (Utility Connection Charges) Expenditure a/c - 128/000/15. 597. 38. 55. 21 . . . . . . . . . . . . . $300,000.00 (Operating Transfers-Out) .Y UNTO: Water and Sewer Construction Fund Revenue a/c ----- 421/000/397.00.00.28 . . . . . . . . . . . . . . . . $300,000.00 (Operating Transfers-In) -1- CITY OF RENTON, WASHINGTON RESOLUTION NO. 2592 - Continued PASSED BY THE CITY COUNCIL this 4th day of March, 1985. Maxine E. Motor, City Clerk APPROVED BY THE MAYOR this 4th day of March, 1985. ��Socnw 'Sac R Barbara Y. Shinpoch, Mayor Approved as to Form: Lawrence J. Warr n, City Attorney -2- EXHIBIT "A" - RESOLUTION NO. 2592 '_.. CITY -OF RENTON 1985 PRELIMINARY BUDGET- ..► Department: PUBLIC WORKS DEPARTMENT Fund: WATER AND SEWER UTILITY FUND WATER AND SEWER CONSTRUCTION FUND Division: ALL DIVISIONS OF WATER/SEWER UTILITY Account: 401/000/15 and 421/000/15 1985 WATER AND SEWER CONSTRUCTION PROGRAM WATER SYSTEM REHABILITATION PROJECTS Capital Project /I CP-16 Replacement of 12" steel watermain in Union Avenue NE from NE 17th Street to SE 99th Street. Proposed Street project. $ 173,000 8" D.I. watermain in NE Sixth Street from Monroe Avenue NE to Union Avenue NE (in conjunction with Street project). 81,000 Sub-total $ 254,000 SANITARY SEWER SYSTEM REHABILITATION PROJECTS Sunset Pump Station sewer repair, Phase II Sewer TV, joint and manhole grouting Glencoe Division II $ 60,000 Cedar River Park sewer repair Sewer TV, joint and manhole grouting To protect City water supply wells from possible sewage leaks. 30,000 Lake Washington sewer investigation and design Investigate the submerged City sewer off of Bennydale, in Lake Washington for stability and design improvements to flush system. 30,000 Sewer replacement (1985) - Miscellaneous: a. Wells Avenue South - from South Fifth Street to South Fourth Street b. - Alley between Meadow Avenue North and Factory Avenue North from North Second Street to North Third Street c. Powell Avenue SW - from Langston Road to SW Third Place 90,000 Sub-total E 210,000 -3- Zi1Dr A"=tSL�i71�T1i1Ott rfu. 2592 '9R CITY OF RENTON 1985 PRELIMINARY BUDGET ✓ Department: PUBLIC WORKS DEPARTMENT Fund: WATER AND SEWER UTILITY FUND WATER AND SEWER CONSTRUCTION FUND Division: ALL DIVISIONS OF WATER/SEWER UTILITY Account: 401/000/15 and 421/000!15 1985 WATER AND SEWER CONSTRUCTION PROGRAM - Continued WATER SYSTEM PROJECTS/MAJOR CP-35 Well #9 Pump House $ 138,000 CP-70 West Hill Booster Pump Station 109,000 CP-91 Installation of 12" D.I. watermain in Grady Way at Springbrook Creek (in conjunction with Street project). 18,000 CP-51 Installation of 12" D.I. watermain in Grant Avenue South from South Tenth Street to South Seventh Street, and in South. Seventh Street from Grant Avenue South to Renton Avenue South. 52,000 CP-61 Installation of 8" D.I. watermain and transfer of watermain from WD #58 at the Plat of Ponderosa Estates near Rolling Hills Reservoir. 38,000 CP=62 Construction of pressure reducing station at South 26th Street and Benson Road South. 21,000 CP-65 Design of South Talbot Hill Reservoir 70,000 CP-105 Reconstruction of telemetry system 291,000 CP-122 Installation of 3" conduit and wire from new City Shops to City Hall 56,000 Installation of 12" watermain in Lind Avenue South from South 16th Street to Grady Way South (in conjunction with WSDOT bridge widening). 50,000 Installation of two PRV stations at South 20th Street and Shattuck Avenue South. 40,000 Purchase of 2,100 L.F. of installed 8" watermain and miscellaneous services from W.D. #14 in conjunction with West Hills Project. 30,000 Miscellaneous pump adjustments and additions 29,000 12" watermain installation of Wells Avenue North from North Riverside Drive to north side of North First Street. (Replacement of services and hydrants on North First Street in conjunction with street overlay project.) 70,000 P-1 Channel - SW Seventh Street 12" watermain relocation for P-1 Channel excavation. 40,000 CP-120 Purchase of Squire property at Springbrook Springs. 160,000 CP-65 Purchase of Covenant Church property for South Talbot Hill Reservoir. 40,000 CP-85 Purchase of future site of Black River Quarry Reservoir 10,000 CP-75 Installation of 24" transmission main in South Second Street. 30,000 CP-76 West Hill Reservoir 300,000 Sub-total $1,592,000 -4- EXHIBIT "A" - RESOLUTION NO. 2592 yf LCITY OF RENTON 1985 PRELIMINARY BUDGET. Department: PUBLIC WORKS DEPARTMENT Fund: WATER AND SEWER UTILITY FUND WATER AND SEWER CONSTRUCTION FUND Division: ALL DIVISIONS OF WATER/SEWER UTILITY Account: 401/000/15 and 421/000/15 1985 WATER AND SEWER CONSTRUCTION PROGRAM - Continued SANITARY SEWER SYSTEM PROJECTS/MAJOR Honey _Creek Interceptor Sewer: New 12" sewer, pump station in Honey Creek from Devil's Elbow to Sunset Boulevard NE and Union Avenue NE, together with downstream sewer system revisions. $ 960,000 CBD SW 24" Trunk Sewer Replacement - Phase II: Replace 24" South CBD sewer in Shattuck Avenue South alignment from Tobin Avenue South to South Second Street through High School. Coordinate with upcoming WSDOT overlay of South Second Street (SR-900)._ 142,000 East Bennydale Interceptor: New 12" sanitary sewer from NE 27th STreet to Azalea Lane pump station (in conjunction with Aberdeen Avenue NE Forward Thrust project). 100,000 Duvall Avenue NE Sewer Extension (or North First Street Sewer Replacement CBD-N): Extend 8" sewers to eliminate Eastwood Park pump station (eliminate inadequate pump station by gravity flow to the south). 110,000 Renton Avenue Sewer Extension: Rebuild existing Tobin Avenue and Victoria Place sewer and Rainier Avenue South crossing (in conjunction with WSDOT Rainier Avenue South overlay). 50,000 Sewer Replacement - Shattuck Avenue South Interceptor - Phase I CBD-SE: Replace existing 811, 1011, and 12" sewers in Shattuck Avenue South from South Fourth Street to South Seventh Street. 40,000 Sub-total $1,402,000 TOTAL CONSTRUCTION PROGRAMS ...... $3,458,000 -5-