CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2593
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON,
AUTHORIZING ENTRY INTO THE GREEN RIVER MANAGEMENT
AGREEMENT
WHEREAS the Green River flows through the boundaries of
a number of cities and it is an important recreation and environmental
resource of the region and it would be appropriate to share the costs
of planning, administration, construction, operation and maintenance
of the Green River channel and related facilities; and
WHEREAS this function may be adequately handled through an
Interlocal Cooperative Agreement, NOW THEREFORE
THE CITY COUNCIL OF . THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I: The above recitals are true and correct.
SECTION II: The City of Renton is authorized to enter into
an Interlocal Cooperative Agreement with the Cities of Auburn, Kent,
and Tukwila and the County of King for the Green River Basin Program
and the Mayor and City Clerk are authorized to sign the Green River
Management Agreement for those purposes.
PASSED BY THE CITY COUNCIL this 4th day of March, 1985 .
Maxine E. Motor, City Clerk
APPROVED BY THE MAYOR this 4th day of March, 1985.
Barbara Y. Shinpo h, Mayor
Approved as to form:
G�-a~r�vv
Lawrence J. War n, City Attorney
RESOLUTION NO. 2,593
EXHIBIT A
GREEN RIVER MANAGEMENT AGREEMENT
1985 Work Program
RESOLUTION NO. 2593
GREEN RIVER WORK PROGRAM
y (Summary)
SPECIFIC OBJECTIVE: Develop 1984 & 1985 Work Program to implement proposed Green River
Management Agreement
STANDARDS AND SPECIFICATIONS:
-King County and cities of Tukwila, Renton, Kent, and Auburn must approve Agreement.
-Budget approved for 1985 Work Program.
-Staffing.
COSTS: 1985 Estimated Cost Sharing $196,000
RESPONSIBILITY: Donald J. LaBelle
Director of Public Works START DATE: February, 1984
COMPLETION DATE: July, 1986
AGMT
SEC ACTIONS RESPONSIBILITY SCHED. NOTES
1984 Work Program
1984 & 1985 Work Programs with KC/CIT 840600
cost estimates
1985 Work Program
T.7-Implement first phase of Pump Opera- PW 850400 $4,000
tion Plan
2.1 Green River Levee Improvement PW 851200 $120,000
Plan
2.2 Future Drainage from Mill Creek and KC/Aub/Kent 850800 $40,000
Northeastern Auburn
4.1 Flood Warning & Levee Monitoring PW 850600 $4,000
4.1 Improve Green River Monitoring PW 860300 $8,000
Capability
5.0 Financial plan for future con- KC/CIT 860700 $20,000
struction and 0&M
6.0 1985 Annual Report PW 850700 $10,000
All Administrative & logistical support PW 860600 $10,000
1
RESOLUTION' NO. 2593
GREEN RIVER WORK PROGRAM
(Section 1.0 - Pump Operation Plan)
SPECIFIC OBJECTIVE: Implement first phase of Pump•Operation Plan (Section 1 of Agreement)
STANDARDS AND SPECIFICATIONS:
Staffing
COSTS: $4,000
RESPONSIBILITY: Donald J. LaBelle
Director of Public Works START DATE: February 1985
COMPLETION DATE: April 1985
RESC.
ACTIONS RESPONSIBILITY SCNED. REQD. NOTES
Review existing operation of P-1, P-17, PW/CIT 850200
Kent & Union Pacific pump plants with
pump operators and Public Works Director
Establish responsible persons for each PW/CIT 850300
plant
Develop written plan to coordinate PW 850400
pumping
Brief pump operators on coordinate PW/CIT 850400
pumping plan
Seek agreement with Union Pacific CIP 850400
Railroad on pump operation plan
Conduct in-house briefing to flood PW 850400
warning staff
Provide Corps of Engineers with Pump PW 850400
Operation Plan
2
RESOLUTIOM NO. 2593
GREEN RIVER WORK PROGRAM
Section 2.1 - Green River Levee Improvement Plan)
SPECIFIC OBJECTIVE: The Green River levee improvement plan will document levee
improvement needs for the entire lower Green River system. Data from Corps studies will
be used to the greatest extent practicable. Preliminary engineering design plans,
construction cost estimates and implementation priorities will be established.
Environmental mitigation and recreation elements will also be integrated into the design.
A written report will be prepared and reviewed with all parties in December. Technical
and BEC Committee reviews of the plan as well as public reviews will occur in the first
quarter of 1986. Estimated cost of the plan is $120,000.
STANDARDS AND SPECIFICATIONS:
- Funding
- Staffing
COSTS: $120,000
RESPONSIBILITY: Donald J. LaBelle, Director
START DATE: January 1984
COMPLETION DATE: June 1986
RESC.
ACTIONS RESPONSIBILITY SCHED. REQO. NOTES
Review existing Corps & County levee PW 850200 $3,000
studies
Review future development plans within PW/PL/CIT 850500 $4,000
drainage basins and set future inflows
to Green River
Review P-1 pump hydrology and hydraulics PW 850500 $2,000
for possible modification
Establish drainage controls to satisfy PW/PL 850400 $2,000
maximum allowable 1st floor
Set maximum inflow from Mill Creek KC/CIT 850500 $1,000 See Mill Creek
Survey existing river bank profiles PW 850300 $50,000
and plot
Establish design criteria for levee PW/CIT 850400 $5,000
improvement - Consider 2 or 3 alterna-
tives
King County staff will work with Corps PW 850600 $2,000 Need Commit-
to run backwater profile for 2-3 ment from Corps
alternatives
Get approval of levee criteria includ- PW 850700 $2,000
ing freeboard from Corps of. Engineers
?, FEMA
3
RESOLUTION` NO.. 2593
GREEN RIVER ACTION PLAN
(Levee Improvement Plan) Continued
RESC.
ACTIONS RESPONSIBILITY SCNED. READ. NOTES
Prepare preliminary plans (20 sites) PW 851000 $30,000 KC or Consultant
Determine construction priority PW/CIT 851000 $3,000 KC or Consultant
Incorporate environmental & recreational PW/PL/CIT 851100 $6,000
factures
Establish operation and maintenance PW/CIT 851100 $4,000
responsibility
Brief Public Works Director PW 851200 .
Prepare written report PW/PL 851200 $6,000
Review with cities PW 851200
Prepare Environmental Impact Statement PW/PL 860300 $15,000
Submit to Technical Committee PW 860400
Public meeting on levee improvements PW 860500 $3,000
Submit to BEC PW 860600
Adopt Plan 860700
4
RESOLUTION NO. 2,593
GREEN RIVER WORK PROGRAM
(Section 2.2 - Future Drainage from Mill Creek and Northeastern Auburn)
SPECIFIC OBJECTIVE: A detailed review of the Corps of Engineers pump/pond analysis will
be conducted to establish a "preferred" inflow from Mill Creek. Mill Creek inflow is a
critical design parameter that will be determined in future levee improvement plans.
Studies will be made to coordinate Mill Creek drainage with surface water requirements
upstream in Auburn, drainage needs for agricultural lands and levee improvements
downstream. Reactivation of the SCS West Side Watershed Project as a reformulated
agricultural drainage project will be explored. Estimated costs are $40,000.
STANDARDS AND SPECIFICATIONS:
- Coordination between Auburn and King County
Adequacy of Corps of Engineers data on Mill Creek Pump
- Use consultant for pump study
COSTS: Auburn $20,000
King County $10,000
Kent $10,000
RESPONSIBILITY: King County & Cities of Auburn
Kent START DATE: January 1985
COMPLETION DATE: June 1985
RESC.
ACTIONS RESPONSIBILITY SCHED. REQD. NOTES
Review Corps pump pond analysis PW/Aub 850200 Consultant
Award consultant contract to analyze Aub 850300
different alternative of pumping and
on-site storage
Consider affect on farmlands, roads PL/PW/Aub 850300
and increase to the backwater profile
Investigate potential to reactivate PL/Aub/PW 850400
the SCS West Side Project
Analyze cost of pumping vs. possible PW/Aub 850500 Set preferred
adverse effects upstream and increases inflow from Mill
in levee costs Creek
Submit to the Technical Committee PW 850500
Submit to BEC PW. 850600
5
RESOLUTION• NO. 2593 l
a,
GREEN RIVER WORK PROGRAM
(Section 4.1 - Flood Warning & Levee Monitoring)
SPECIFIC OBJECTIVE: Review King County Flood Warning Manual to involve the cities more in
flooding warning and levee monitoring of the Green River. Phase I (Section 4 of
Agreement).
STANDARDS AND SPECIFICATIONS:
Staffing
COSTS: $4,000
RESPONSIBILITY: Donald J. LaBelle
START DATE: February 1985
COMPLETION DATE: June 1985
RESC.
ACTIONS RESPONSIBILITY SCHED. REQD. NOTES
Form a steering committee to review PW/CIT 850200
and expand the King County Flood Warning
Manual to include pump operation and
levee monitoring
Identify low points and locations of PW 850400
potential levee failures
Establish a priority call list, levee PW/CIT 850400
monitoring and pump operation plan
Submit priority call list, levee moni- PW 850600
toring plan, and location of special
levee concerns to BEC
Distribute revised manual to Corps PW 850600
and cities
6
RESOLUTION NO. 2593
GREEN RIVER WORK PROGRAM
(Section 4.1 - Improve Green River Monitoring Capability)
SPECIFIC OBJECTIVE: Studies will be made to identify means to improve river gaging
capability and the costs of implementing an improved system. Extensive work with the
Corps of Engineers is expected. A gaging improvement report will be prepared and reviewed
with the Technical and BEC Committees. Costs are estimated at $8,000.
STANDARDS AND SPECIFICATIONS:
- Approval by Corps of Engineers
COSTS: Study/Design $8,000
Construction Unknown
RESPONSIBILITY: Donald J. LaBelle
START DATE: June 1985
COMPLETION DATE: March 1986
RESC.
ACTIONS RESPONSIBILITY SCHED. REQD. NOTES
Work with the Corps to review the PW 850600
existing river monitoring capability
Establish construction time frame and PW/Corps 850800
ways to monitor pump operations and
guaging from Renton Shops
Prepare improved gaging capability with PW/Corps 851200
cost estimate. Determine Corps
participation
Submit to Technical Committee PW 860100
Submit to BEC PW 860300
7
RESOLUTION 'NO. 2593
GREEN RIVER WORK PROGRAM
a
(Section 6.0 - 1985 Annual Report)
SPECIFIC OBJECTIVE: 1985 Annual Report
STANDARDS AND SPECIFICATIONS:
COSTS: $10,000
RESPONSIBILITY: Donald J. LaBelle, Director
Department of Public Works START DATE: April 1985
COMPLETION DATE: July 1985
RESC.
ACTIONS RESPONSIBILITY SCHED. REQD. NOTES
Prepare report outlining:
Pumping plan when flows 9,000 cfs PW 850500
List maintenance costs for year PW 850500
Prepare post-flood season levee report PW 850500
Update critical levee location PW 850500
Report on monitoring program PW 850500
List complaints PW 850500
Make changes to existing program as PW 850600
necessary
Prepare annual report PW 850600
8
RESOLUTION. NO. 2593 1
GREEN RIVER WORK PROGRAM
(Administration & Logistical Support)
SPECIFIC OBJECTIVE: Administer work program and budget and logistical support to the
Basin Technical and Basin Executive Committees.
STANDARDS AND SPECIFICATIONS:
COSTS: 1985 $10,000
RESPONSIBILITY: Donald J. LaBelle, Director
Department of Public Works START DATE: January 1985
COMPLETION DATE: June 1986
RESC.
ACTIONS RESPONSIBILITY SCHED. REQD. NOTES
Set up monitoring of 1985 work program PW 850100
Coordinate work with cities PW 860600
Briefing and coordination with BTC and PW 860600
BEC
9
RESOLUTION,NO. 2593 l
1985 Work Program
Cost Allocation By Party And Task
a. Cost Allocation by Task
TASK TOTAL COST % BY PARTY COST BY PARTY
Pump Operation Plan $ 4,000 20% Each $ 800
Green River Levee Imp. 120,000 20% Each 24,000
Mill Creek Drainage 40,000 50% Auburn 20,000
25-0 King County 10,000
25% Kent 10,000
River A Levee Monitoring 12,000 20A Each 2,400
Financing Plan To be done in 1996
Annual Report 10,000 20% Each 2,000
Administrative 10,000 20% Each 2,000
b. Cost Allocation By Party
Party Cost
Auburn $51,200
Kent 41,200
Renton 31,200
Tukwila 31,200
King County 41,200
196,000
iJ
4RESOLUTION.- O. 2593
Q OO
Li 69S
---
a
� a
Z GJ r- O
OOT—
. a.
O
N _
S.
IE CCOQ 4J I 40:0 -_ --- --
►n Q c a I 4J
ooON CL
�
- f C d'
O O C O O O O
Q O O —O O O - O - --
O
w w —CT -
O —
G� N
y Z
ix -- -
O O -
Z
wLAJ
Q I
LAJ= c m �
CM
Q U _- .._. .. - �
W --- -- - --._ .. - - - --- ----' -
� Q
a.�
W LL
G'S 7
N
C
aJ
C E C
O L C d
L C a1 O -r E to
M-
G C 4J C
N O f C C
L r C O +► r
r d L O F 7 U-
L rCf C -Ei L > L N.
4-
a. Vf > w C OC C
Y •C� O J S.
id aJ ML C to
L O r C 41 C 41 4J r i 41
O J ++ L N •r aJ r a O u
3 L > L � L C9 O. 3
y E �Zf C E O -r- D L to b 41
L
N A i0 t6 OL CC 4j 3 4) tv r go N
Q L +J L O a i > d u r- L C
F- cr C C cr C L O ID O O C A cr. O
O aJ O L O- d 0 2 O i U to O O U
Q d 41 d L 7 9- E 'r C 0. a7
CC aJ r0 Cl. C7 LL L" aJ
O L m ++ L O N N O O L o)
a 3 Q '�CA 3 N N et Ln t0 3 J
4J C 4J
be 4tr to
co O co V V V u u w u co O
p► 07 d aJ aJ QJ 4) QJ 4) Q► 10
N N N N N Q