HomeMy WebLinkAboutR-373903EROSION CONTROL NOTES O1. THESE NOTES SHALL APPEAR FOR PROJECTS - SITE IMPROVEMENTS, SURFACE N WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS: r 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A O PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, O PUBLIC WORKS DESIGN ENGINEER. r 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION Q AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALLJ F PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN O OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION Z AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS I` PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/ z SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. Q 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS Z CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE LL.I SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM. 7. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST - MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST - SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE WATER DESIGN MANUAL. 11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 14. DURING THE TIME PERIOD OF OCTOBER 1ST - MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS, THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING, OR PLASTIC COVERING. FILTER FABRIC MATERIAL 60" WIDE ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. 2" BY 2" 14 GA. WIRE FABRIC OR EQUIV. II I 2'-6" I I I II I 5' -0" BURY BOTTOM OF FABRIC 4 - MATERIAL IN 8" BY 12" TRENCH 2' -6" I -- IY- -6' MAX I u u FILTER FABRIC MATERIAL 6 2" BY 2" BY 14 GA. WIRE \`f- T-FABRIC OF EQUIV. -- 2, -0" PROVIDE 3/4" - 1.5" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES I OF FILTER FENCE FABRIC ON -1 8" MIN. THE SURFACE. 2" BY 4" WOOD POST ALT: STEEL FENCE POSTS. 15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1) ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW. CONSTRUCTION SEQUANCE 1. PRE - CONSTRUCTION MEETING. 2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR MAY BE CONSOLIDATED W /THE REQUIRED NOTICE OF CONSTRUCTION-,, 3. FLAG OR FENCE CLEARING LIMITS. 4. INSTALL CATCH BASIN PROTECTION WHERE REQUIRED. s 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH-.BARRIER, ETC.) - 7. CONSTRUCT SEDIMENT PONDS AND TRAPS. 8. GRADE AND STABILIZE CONSTRUCTION ROADS. 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PORJECT DEVELOPMENT. 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND MANUFACTURES RECOMMENDATIONS. 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR EQUIVALENT. 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMP'S REMOVED IF APPROPRIATE. NOTES: 1. FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A SEDIMENT TRAP OR POND. 2. MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE LINE IS 1:1. 3. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE OF 100 FT. 4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES SMALLER THAN THE U.S. STANDARD SIEVE NO. 200, THE EOS SHOULD BE EQUAL TO OR SMALLER THAN THE SIEVE SIZE THAT 85% OF THE SOIL CAN PASS THROUGH. 5. THE TRENCH SHALL BE BACKFILLED WITH 3/4" MINIMUM DIAMETER WASHED GRAVEL. 5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 6. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS SHALL BE MADE IMMEDIATELY. BRUSH BARRIER 666 FILTER FABRIC FENCE DETAIL NTS OFFE ENGINEERS 13932 SOUTHEAST 159TH PLACE RENTON, WASHINGTON 98058 PHONE: 425- 260 -3412 CONTACT: DARRELL OFFE, P.E. STURCTURAL NOTES ggE.= 427.50\ 34N cur OFT SWALE rye' e-u-u IWNO peeaa a cav OMY 1. THESE PLANS APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, WALLS, OR RETAINING WALLS REQUIRE A SEPERATE REVIEW AND APPROVAL BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. 2. ROCKERIES ARE CONSIDERED TO BE A MEHTOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN THE CITY ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE (IBC). NOTE, EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG, 811 GRADING QUANTITIES EXCAVATION: 2,072 CU. YDS. BACKFILL: 380 CU. YDS. R- 313903 CALL 811 BEFORE DIGGING DETAIL AT BOTTOM REQUIRED =302 SQ. FT. PROVIDED =1106 SQ. FT. GRAPHIC SCALE 0 15 30 60 1 inch = 30 feet RECD ND FO PPROVA By, Date- 2VPllY By. Date- By, Date-- By, Date, iyyc' GEDMENSIONS. INC. SCALE X0 0`"'00f .9 ,i CITY OF RENTON 7 SHORT PLAT D.L. OFFE P.E. JAYMARC HOMES, LLC sz• RENTON o.L. OFFS, P.E. ocxm DATUM GRADING /EROSION &SEDIMENTATION CONTROL 27.co J rte I Planning /Building /Public Works Dept. NE 2nd COURT/ NILE AVENUE NE 1NAL EN O6/ „/2014 m N0. REVISION BY DATE APPR .sA,vm zxc y C, I 1ER1: Buu- 02/10/2014 3 '15 7771 z v o 46 zNmN0 O N' Wr w W 2 N