HomeMy WebLinkAboutR-326822ci
E
Z
0
J
3
X
Cn
0
Ae
L
ca
a.
ca
0
U
>
0
0
0
N
U
W
W
CLz
.E
rn
0
0
0
N
0
c
LXXX LOOP NUMBER
TYPE R3 INDUCTION LOOP
TO ADDITIONAL
LOOPS WHERE
A r% r-% 1 1 eN w r-% 1 r—
No. Date
JUNCTION BOX
TYPE R1 INDUCTION LOOP
LOOP WINDING DETAILS
Revision
By I Appr.
LOOP INSTALLATION NOTES
1. INSTALL JUNCTION BOX AND LEAD—IN CONDUIT.
2. SAWCUT LOOP SLOTS AND LEAD—IN SLOTS.
3. LAY OUT LOOP WIRE STARTING AT JUNCTION BOX, ALLOWING
5' MINIMUM SLACK.
4. INSTALL WIRE IN LOOP SLOT AS SHOWN.
5. FINISH LAYING OUT WIRE AT JUNCTION BOX AND IDENTIFY LEADS
WITH LOOP NUMBER AND "S" FOR START AND "F" FOR FINISH.
6. TWIST EACH PAIR OF LEAD WIRES TWO TIMES PER FOOT FROM
LOOP TO JUNCTION BOX. REVERSE DIRECTION OF TWIST FOR EACH
SUCCESSIVE PAIR INSTALLED.
7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR
PARALLEL LOOP CONNECTIONS REQUIRED IN PLANS. SUPPLEMENTAL
SPLICES ARE SUBJECT TO THE SAME REQUIREMENTS SHOWN FOR
THE LOOP LEAD AND SHIELDED CABLE SPLICE.
8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED
CABLE AS NOTED IN THE PLANS.
9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION
LOOP CIRCUITS. SEE STANDARD SPECIFICATION 8-20.3(14)D.
10. FRONT OF LOOP SHALL BE MEASURED FROM BACK OF STOP BAR, OR
BACK OF CROSSWALK WHERE NO STOP BAR IS INSTALLED.
11. CONDUIT FOR LOOP STUBOUT SHALL BE SCHEDULE 40 PVC.
12. LABEL ALL LOOP LEAD IN WIRES WITH BOTH LOOP NUMBER
AND LOOP SERIES NUMBER ON TYPE R3 LOOPS AS SHOWN BELOW.
LOOP LEAD IN WIRE LABEL:
XXX—XX
LOOP NUMBER LOOP SERIES NUMBER
DASH S OR F
TO CONTROLLER
>_c(s)
O1 SEALANT TO ENCAPSULATE CONDUCTORS —
SEE SPECIAL PROVISIONS.
O2 LOOP WIRE — #14 AWG.
O3 LEAD—IN WIRES: (SEE INSTALLATION
NOTES) THREE PAIR MAXIMUM PER
SAWCUT.
G EXTEND SAWCUT SUFFICIENT LENGTH TO
PROVIDE FULL SAWCUT DEPTH AROUND
CORNERS.
5 WEARING COURSE (LOOPS SHALL BE
INSTALLED PRIOR TO FINAL LIFT IF
NEW PAVEMENT IS INSTALLED) WHERE
APPLICABLE.
O6 FILL WITH SEALANT.
meet Inc.
425-252-7700 11-800-615-9900
2707 Colby Avenue, Suite 900
Everett, Washington 98201
PA
r
00
LO
N
TO Al
LOOP
APPLI
0.25" MINIMUM
WIDTH SAWCUT
SECTION A—A
CENTER OF
LANE
STOP BAR
i
TYPE R3
INDUCTION LOOP
x
00 Q
L
N n
0.50" MINIMUM
WIDTH SAWCUT
SECTION B—B
SEE NOTE 6
WA
Y
�o Cx__
124043
�p �_J
Fss�11S.T
L E�
EXPIRES: 11 /25/1
5
AWCUT ROUND LC
� SAWCUI
EDGE OF PAVED
SHOULDER
FOR CONDUIT STUBOUT
LOCATION SEE LOOP STUB
OUT CONDUIT PLACEMENT
DETAILS
JUNCTION BOX
\D
SPLICES
D
D
SPLICES, SEE LOOP
WINDING DETAIL
CONDUIT STUBOUT
TION SEE LOOP STUB
CONDUIT PLACEMENT
,ILS
x
00 Q
w
N
0.50" MINIMUM
WIDTH SAWCUT
SECTION C—C
SEE NOTE 6
FA STPUL 0169 (ISM,
6'
LOOP SAWCUT
D ETAI L
TO ADDITIONAL
LOOPS WHERE
APPLICABLE
CENTER C
LAN E
TYPE R 1
INDUCTION LOOP
FULL DEPTH SAW' C UT
MATCH EXISTING MATERIAL
3" CRUSHED
SURFACING TOP (�OURSE
(WHERE SAWCUTTING IS
REQUIRED)
SAND
CONDUIT
^ DUN W - — W = CONDUIT DIAMETER
PLUS 2"
APPLICABLE IN IMPROVED AREAS
WHERE SAWCUTTING IS NECESSARY
BETWEEN CONDUIT STUBOUT AND
ASSOCIATED JUNCTION BOX.
SECTION D—D R = 326822
RENTON
e: f�.qr.0 F T;.�.:-:i,H4.E
Q
Q
CITY OF RENTON
°'°""° No.
0
ao
sn<e No
zZ
3`
of Tc
0
U
N
U
Q~
W
M
w�
Q
z
zC
SU
U
_>
O
-u
�zN
�■
V
Q w
w a►
Uwal �
Z
r� > >
•C
W
w� 3
6
w
a
Q
ci
E
Z
0
J
3
X
Cn
0
Ae
L
ca
a.
ca
0
U
>
0
0
0
N
U
W
W
CLz
.E
rn
0
0
0
N
0
c
LXXX LOOP NUMBER
TYPE R3 INDUCTION LOOP
TO ADDITIONAL
LOOPS WHERE
A r% r-% 1 1 eN w r-% 1 r—
No. Date
JUNCTION BOX
TYPE R1 INDUCTION LOOP
LOOP WINDING DETAILS
Revision
By I Appr.
LOOP INSTALLATION NOTES
1. INSTALL JUNCTION BOX AND LEAD—IN CONDUIT.
2. SAWCUT LOOP SLOTS AND LEAD—IN SLOTS.
3. LAY OUT LOOP WIRE STARTING AT JUNCTION BOX, ALLOWING
5' MINIMUM SLACK.
4. INSTALL WIRE IN LOOP SLOT AS SHOWN.
5. FINISH LAYING OUT WIRE AT JUNCTION BOX AND IDENTIFY LEADS
WITH LOOP NUMBER AND "S" FOR START AND "F" FOR FINISH.
6. TWIST EACH PAIR OF LEAD WIRES TWO TIMES PER FOOT FROM
LOOP TO JUNCTION BOX. REVERSE DIRECTION OF TWIST FOR EACH
SUCCESSIVE PAIR INSTALLED.
7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR
PARALLEL LOOP CONNECTIONS REQUIRED IN PLANS. SUPPLEMENTAL
SPLICES ARE SUBJECT TO THE SAME REQUIREMENTS SHOWN FOR
THE LOOP LEAD AND SHIELDED CABLE SPLICE.
8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED
CABLE AS NOTED IN THE PLANS.
9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION
LOOP CIRCUITS. SEE STANDARD SPECIFICATION 8-20.3(14)D.
10. FRONT OF LOOP SHALL BE MEASURED FROM BACK OF STOP BAR, OR
BACK OF CROSSWALK WHERE NO STOP BAR IS INSTALLED.
11. CONDUIT FOR LOOP STUBOUT SHALL BE SCHEDULE 40 PVC.
12. LABEL ALL LOOP LEAD IN WIRES WITH BOTH LOOP NUMBER
AND LOOP SERIES NUMBER ON TYPE R3 LOOPS AS SHOWN BELOW.
LOOP LEAD IN WIRE LABEL:
XXX—XX
LOOP NUMBER LOOP SERIES NUMBER
DASH S OR F
TO CONTROLLER
>_c(s)
O1 SEALANT TO ENCAPSULATE CONDUCTORS —
SEE SPECIAL PROVISIONS.
O2 LOOP WIRE — #14 AWG.
O3 LEAD—IN WIRES: (SEE INSTALLATION
NOTES) THREE PAIR MAXIMUM PER
SAWCUT.
G EXTEND SAWCUT SUFFICIENT LENGTH TO
PROVIDE FULL SAWCUT DEPTH AROUND
CORNERS.
5 WEARING COURSE (LOOPS SHALL BE
INSTALLED PRIOR TO FINAL LIFT IF
NEW PAVEMENT IS INSTALLED) WHERE
APPLICABLE.
O6 FILL WITH SEALANT.
meet Inc.
425-252-7700 11-800-615-9900
2707 Colby Avenue, Suite 900
Everett, Washington 98201
PA
r
00
LO
N
TO Al
LOOP
APPLI
0.25" MINIMUM
WIDTH SAWCUT
SECTION A—A
CENTER OF
LANE
STOP BAR
i
TYPE R3
INDUCTION LOOP
x
00 Q
L
N n
0.50" MINIMUM
WIDTH SAWCUT
SECTION B—B
SEE NOTE 6
WA
Y
�o Cx__
124043
�p �_J
Fss�11S.T
L E�
EXPIRES: 11 /25/1
5
AWCUT ROUND LC
� SAWCUI
EDGE OF PAVED
SHOULDER
FOR CONDUIT STUBOUT
LOCATION SEE LOOP STUB
OUT CONDUIT PLACEMENT
DETAILS
JUNCTION BOX
\D
SPLICES
D
D
SPLICES, SEE LOOP
WINDING DETAIL
CONDUIT STUBOUT
TION SEE LOOP STUB
CONDUIT PLACEMENT
,ILS
x
00 Q
w
N
0.50" MINIMUM
WIDTH SAWCUT
SECTION C—C
SEE NOTE 6
FA STPUL 0169 (ISM,
6'
LOOP SAWCUT
D ETAI L
TO ADDITIONAL
LOOPS WHERE
APPLICABLE
CENTER C
LAN E
TYPE R 1
INDUCTION LOOP
FULL DEPTH SAW' C UT
MATCH EXISTING MATERIAL
3" CRUSHED
SURFACING TOP (�OURSE
(WHERE SAWCUTTING IS
REQUIRED)
SAND
CONDUIT
^ DUN W - — W = CONDUIT DIAMETER
PLUS 2"
APPLICABLE IN IMPROVED AREAS
WHERE SAWCUTTING IS NECESSARY
BETWEEN CONDUIT STUBOUT AND
ASSOCIATED JUNCTION BOX.
SECTION D—D R = 326822
RENTON
e: f�.qr.0 F T;.�.:-:i,H4.E
Drawn By Date
5/05
Design'
esy ea By
°e, � ��
5/05
p �a By
Approved
Q
CITY OF RENTON
°'°""° No.
MAPLE VALLEY HIGHWAY69 �/SG5
(SR1
CEDAR RIVER PARK ACCESS IMPROVEMENTS
ROUND LOOP DETAIL TYPE R1 & R3
Im
sn<e No
zZ
3`
of Tc
0
LU
LU
W
M
z
zC
SU
U
-u
2
�c
3:
Z
•C
W
ci
E
Z
0
J
3
X
Cn
0
Ae
L
ca
a.
ca
0
U
>
0
0
0
N
U
W
W
CLz
.E
rn
0
0
0
N
0
c
LXXX LOOP NUMBER
TYPE R3 INDUCTION LOOP
TO ADDITIONAL
LOOPS WHERE
A r% r-% 1 1 eN w r-% 1 r—
No. Date
JUNCTION BOX
TYPE R1 INDUCTION LOOP
LOOP WINDING DETAILS
Revision
By I Appr.
LOOP INSTALLATION NOTES
1. INSTALL JUNCTION BOX AND LEAD—IN CONDUIT.
2. SAWCUT LOOP SLOTS AND LEAD—IN SLOTS.
3. LAY OUT LOOP WIRE STARTING AT JUNCTION BOX, ALLOWING
5' MINIMUM SLACK.
4. INSTALL WIRE IN LOOP SLOT AS SHOWN.
5. FINISH LAYING OUT WIRE AT JUNCTION BOX AND IDENTIFY LEADS
WITH LOOP NUMBER AND "S" FOR START AND "F" FOR FINISH.
6. TWIST EACH PAIR OF LEAD WIRES TWO TIMES PER FOOT FROM
LOOP TO JUNCTION BOX. REVERSE DIRECTION OF TWIST FOR EACH
SUCCESSIVE PAIR INSTALLED.
7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR
PARALLEL LOOP CONNECTIONS REQUIRED IN PLANS. SUPPLEMENTAL
SPLICES ARE SUBJECT TO THE SAME REQUIREMENTS SHOWN FOR
THE LOOP LEAD AND SHIELDED CABLE SPLICE.
8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED
CABLE AS NOTED IN THE PLANS.
9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION
LOOP CIRCUITS. SEE STANDARD SPECIFICATION 8-20.3(14)D.
10. FRONT OF LOOP SHALL BE MEASURED FROM BACK OF STOP BAR, OR
BACK OF CROSSWALK WHERE NO STOP BAR IS INSTALLED.
11. CONDUIT FOR LOOP STUBOUT SHALL BE SCHEDULE 40 PVC.
12. LABEL ALL LOOP LEAD IN WIRES WITH BOTH LOOP NUMBER
AND LOOP SERIES NUMBER ON TYPE R3 LOOPS AS SHOWN BELOW.
LOOP LEAD IN WIRE LABEL:
XXX—XX
LOOP NUMBER LOOP SERIES NUMBER
DASH S OR F
TO CONTROLLER
>_c(s)
O1 SEALANT TO ENCAPSULATE CONDUCTORS —
SEE SPECIAL PROVISIONS.
O2 LOOP WIRE — #14 AWG.
O3 LEAD—IN WIRES: (SEE INSTALLATION
NOTES) THREE PAIR MAXIMUM PER
SAWCUT.
G EXTEND SAWCUT SUFFICIENT LENGTH TO
PROVIDE FULL SAWCUT DEPTH AROUND
CORNERS.
5 WEARING COURSE (LOOPS SHALL BE
INSTALLED PRIOR TO FINAL LIFT IF
NEW PAVEMENT IS INSTALLED) WHERE
APPLICABLE.
O6 FILL WITH SEALANT.
meet Inc.
425-252-7700 11-800-615-9900
2707 Colby Avenue, Suite 900
Everett, Washington 98201
PA
r
00
LO
N
TO Al
LOOP
APPLI
0.25" MINIMUM
WIDTH SAWCUT
SECTION A—A
CENTER OF
LANE
STOP BAR
i
TYPE R3
INDUCTION LOOP
x
00 Q
L
N n
0.50" MINIMUM
WIDTH SAWCUT
SECTION B—B
SEE NOTE 6
WA
Y
�o Cx__
124043
�p �_J
Fss�11S.T
L E�
EXPIRES: 11 /25/1
5
AWCUT ROUND LC
� SAWCUI
EDGE OF PAVED
SHOULDER
FOR CONDUIT STUBOUT
LOCATION SEE LOOP STUB
OUT CONDUIT PLACEMENT
DETAILS
JUNCTION BOX
\D
SPLICES
D
D
SPLICES, SEE LOOP
WINDING DETAIL
CONDUIT STUBOUT
TION SEE LOOP STUB
CONDUIT PLACEMENT
,ILS
x
00 Q
w
N
0.50" MINIMUM
WIDTH SAWCUT
SECTION C—C
SEE NOTE 6
FA STPUL 0169 (ISM,
6'
LOOP SAWCUT
D ETAI L
TO ADDITIONAL
LOOPS WHERE
APPLICABLE
CENTER C
LAN E
TYPE R 1
INDUCTION LOOP
FULL DEPTH SAW' C UT
MATCH EXISTING MATERIAL
3" CRUSHED
SURFACING TOP (�OURSE
(WHERE SAWCUTTING IS
REQUIRED)
SAND
CONDUIT
^ DUN W - — W = CONDUIT DIAMETER
PLUS 2"
APPLICABLE IN IMPROVED AREAS
WHERE SAWCUTTING IS NECESSARY
BETWEEN CONDUIT STUBOUT AND
ASSOCIATED JUNCTION BOX.
SECTION D—D R = 326822
RENTON
e: f�.qr.0 F T;.�.:-:i,H4.E
Drawn By Date
5/05
Design'
esy ea By
°e, � ��
5/05
p �a By
Approved
SCALE
"*s
CITY OF RENTON
°'°""° No.
MAPLE VALLEY HIGHWAY69 �/SG5
(SR1
CEDAR RIVER PARK ACCESS IMPROVEMENTS
ROUND LOOP DETAIL TYPE R1 & R3
Vert
"/ct N
sn<e No
zZ
3`
of Tc
poi mee
ur
]1031