HomeMy WebLinkAboutR-373903EROSION CONTROL NOTES
O1. THESE NOTES SHALL APPEAR FOR PROJECTS - SITE IMPROVEMENTS, SURFACE
N
WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
r 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
O PRE - CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON,
O PUBLIC WORKS DESIGN ENGINEER.
r
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION
AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING
IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING
LIMITS SHALL BE MAINTAINED BY THE APPLICANT /ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION
Q AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALLJ
F PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR
FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION /EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
O
OPERATION PRIOR TO LAND CLEARING AND /OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION
Z AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND /OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS
I` PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/
z
SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE.
Q 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
Z CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE
LL.I SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE
COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE
TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION /SEDIMENTATION CONTROL ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST - MARCH 30TH) OR
SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST - SEPTEMBER 30TH) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST - MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS,
THAT ARE TO BE LEFT UN- WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED
BY MULCH, SODDING, OR PLASTIC COVERING.
FILTER FABRIC MATERIAL 60" WIDE ROLLS.
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE.
2" BY 2" 14 GA. WIRE
FABRIC OR EQUIV.
II I
2'-6" I I I
II I
5' -0" BURY BOTTOM OF FABRIC
4 - MATERIAL IN 8" BY 12" TRENCH
2' -6"
I --
IY- -6' MAX I
u u
FILTER FABRIC MATERIAL
6
2" BY 2" BY 14 GA. WIRE \`f-
T-FABRIC OF EQUIV. --
2, -0"
PROVIDE 3/4" - 1.5"
WASHED GRAVEL BACKFILL
IN TRENCH AND ON BOTH SIDES I
OF FILTER FENCE FABRIC ON -1 8" MIN.
THE SURFACE.
2" BY 4" WOOD POST
ALT: STEEL FENCE POSTS.
15. ANY PERMANENT RETENTION /DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL
BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1) ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
CONSTRUCTION SEQUANCE
1. PRE - CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR
MAY BE CONSOLIDATED W /THE REQUIRED NOTICE OF CONSTRUCTION-,,
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION WHERE REQUIRED. s
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH-.BARRIER, ETC.) -
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE
SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING
FOR PORJECT DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH
APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND
MANUFACTURES RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES
SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT
CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION
AND SEDIMENT CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN
DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET
SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC
SHEETING OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN
30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST
BE STABILIZED AND BMP'S REMOVED IF APPROPRIATE.
NOTES:
1. FOR SHEET RUNOFF OR FOLLOWING DISCHARGE FROM A
SEDIMENT TRAP OR POND.
2. MAXIMUM SLOPE STEEPNESS PERPENDICULAR TO FENCE
LINE IS 1:1.
3. MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO
THE FENCE OF 100 FT.
4. IF 50% OR LESS OF THE SOIL, BY WEIGHT, IS FINE PARTICLES
SMALLER THAN THE U.S. STANDARD SIEVE NO. 200, THE EOS
SHOULD BE EQUAL TO OR SMALLER THAN THE SIEVE SIZE
THAT 85% OF THE SOIL CAN PASS THROUGH.
5. THE TRENCH SHALL BE BACKFILLED WITH 3/4" MINIMUM
DIAMETER WASHED GRAVEL.
5. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE
SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE
UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
6. FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY
AFTER EACH RAINFALL AND AT LEAST DAILY DURING
PROLONGED RAINFALL. ANY REPAIRS SHALL BE MADE
IMMEDIATELY.
BRUSH BARRIER 666 FILTER FABRIC FENCE DETAIL
NTS
OFFE ENGINEERS
13932 SOUTHEAST 159TH PLACE
RENTON, WASHINGTON 98058
PHONE: 425- 260 -3412
CONTACT: DARRELL OFFE, P.E.
STURCTURAL NOTES
ggE.=
427.50\
34N cur OFT SWALE
rye'
e-u-u
IWNO peeaa a cav
OMY
1. THESE PLANS APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS ONLY. PLANS
FOR STRUCTURES SUCH AS BRIDGES, VAULTS, WALLS, OR RETAINING WALLS REQUIRE A SEPERATE
REVIEW AND APPROVAL BY THE CITY OF RENTON PRIOR TO CONSTRUCTION.
2. ROCKERIES ARE CONSIDERED TO BE A MEHTOD OF BANK STABILIZATION AND EROSION CONTROL.
ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN THE CITY
ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES
OUTSIDE OF ROAD RIGHT -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE (IBC).
NOTE,
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE
APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND
HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO
REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES
NOT SHOWN IN THEIR PROPER LOCATION.
CALL BEFORE YOU DIG, 811
GRADING QUANTITIES
EXCAVATION: 2,072 CU. YDS.
BACKFILL: 380 CU. YDS.
R- 313903
CALL 811 BEFORE DIGGING
DETAIL AT BOTTOM
REQUIRED =302 SQ. FT.
PROVIDED =1106 SQ. FT.
GRAPHIC SCALE
0 15 30 60
1 inch = 30 feet
RECD ND FO PPROVA
By, Date- 2VPllY
By. Date-
By, Date--
By, Date,
iyyc' GEDMENSIONS. INC.
SCALE
X0 0`"'00f .9 ,i CITY OF RENTON 7 SHORT PLAT
D.L. OFFE P.E. JAYMARC HOMES, LLC
sz• RENTON
o.L. OFFS, P.E. ocxm DATUM GRADING /EROSION &SEDIMENTATION CONTROL
27.co
J
rte I Planning /Building /Public Works Dept. NE 2nd COURT/ NILE AVENUE NE
1NAL EN O6/ „/2014
m
N0. REVISION BY DATE APPR .sA,vm
zxc y
C, I 1ER1:
Buu-
02/10/2014
3 '15
7771
z
v
o
46
zNmN0 O
N' Wr
w W
2
N