Loading...
HomeMy WebLinkAboutR-384745W TY #5 IN E (3) TOT W-9 end of Interior Wall End Wall PROVIDE 12"x 12" COLUMNS AT BEAM SUPPORT LOCATIONS iREIWORCED W/ (4) #6 VERT HAIRS 4 •3 HOOPS • 10"m W/ h" GLR ON ALL SIDES. TYPICAL. Columns 6 (2)#bxRLL SPAIN - 8" L8x4x% W/ 400K EACH EO 1�00 x 3" HWS #4 DOiNELS • 12" oc. G.I.P. GONG. SLAB #5 . 12 "oo TOP #5 . 10"x EIA Irl 4 80T NV #5 EXT90 6" INTO HAS • 12" x SUP OM EACH EN? IN CLOSM STRIP ALI6N W/ BOTTOM -J :t 1 ��*4 x 110 5"a OF FIG PLNW n (2) *b x 10'-3" (GatTE1t ON EIIGMI SPAN) A5 LJIIRW I'-0" (?) 06 x 13'-10` PXTE}b 6' INTO SIPPORT EACH EW Gast -in -Place Concrete Beam at Panel 2 11 /N W G.I.P. GONG. #5 IN E (2) T01 5'-r #5 IN 6 (3) TOTS y jy GIP Slab at Vent Opening 12 LN SI LN P.G. GO I'LL PL X11 G.I.P. GONG. 05 DONtL IN E/1. YOID TOTAL 31-00 j4' GIP 51ob at Manhole and Vent I I 1w ..i1 Q r MAX. AS EL. PIR GIYIL o r FOR GALL -0W5 IN C40MHILIN Sw DETAJL ftS2 rAn -FINISH 6RADE PPR CIVIL (2) M4 CONT. TOP 00 0 O 00 0 0 O� O 000 0 00 0011 0 log a O0 0 00 0 00 0 00 0 00 0 0 O 0 0000 OO a 00 0 o oc O 0 00 0 Aall at Access Grating 11 #4 DOMLS • 1 (2) AD x FULL HOOK EACH EN G.I.P. GONG. SL, #5. 10'oc EM ALI6N W/ BOTT OF HG PLANK as L8x4x% NV WOx3"HNS • Too EAC44 LES *4 x r1 e 5'oc i31 #6 x'1'-10' EXT90 6' INTO 51I ipORT EIIGFI CIS Gast -in -Place Concrete Bew t Slab at Grate At 5 1 S.S E R FZNGINE"RING 3212M 0ff MY S. SUITE iJ ""r.-r.r ii VOICE: 05-0610 • 5 i, 8" L8x4x% W/ 1�00 x 3" HWS #4 DOiNELS • 12" oc. • 121Ioc (2) #8 x FLLL SPAN - EACH LE6 a HOOK EACH Eta J #5. 12NOC TOP C 4 HOT MV #5 LA HAN#% • 12" 0C .4 IN CLOSM STRIP � ALI6N N *4 x ® 5"oc OF HC (2) #8 x 101-311 V (ODM ON zz EACH SPAN) A5 FIRED 11-011 Q (2) 06 x 131-1011 -13 EXTEND 6" INTO LA0 W SUPPORT EACH END Cast -in -'lace Concrete Beam at Grate 3 1w ..i1 Q r MAX. AS EL. PIR GIYIL o r FOR GALL -0W5 IN C40MHILIN Sw DETAJL ftS2 rAn -FINISH 6RADE PPR CIVIL (2) M4 CONT. TOP 00 0 O 00 0 0 O� O 000 0 00 0011 0 log a O0 0 00 0 00 0 00 0 00 0 0 O 0 0000 OO a 00 0 o oc O 0 00 0 Aall at Access Grating 11 #4 DOMLS • 1 (2) AD x FULL HOOK EACH EN G.I.P. GONG. SL, #5. 10'oc EM ALI6N W/ BOTT OF HG PLANK as L8x4x% NV WOx3"HNS • Too EAC44 LES *4 x r1 e 5'oc i31 #6 x'1'-10' EXT90 6' INTO 51I ipORT EIIGFI CIS Gast -in -Place Concrete Bew t Slab at Grate At 5 1 S.S E R FZNGINE"RING 3212M 0ff MY S. SUITE iJ ""r.-r.r ii VOICE: 05-0610 • 5 i, gklb V ai! D LU z rt �, OIL J C (3 LA .4 0 1JJ v V > zz ILog LU� Q O -13 °- LA0 W < LU < < LU L11 v C(] l.0 � � W 0 0 z o U Q t- J k Iloilo gklb V ai! D LU z Cz �, OIL J C (3 LA .4 0 1JJ v V > zz ILog LU� Q O -13 °- LA0 W < LU < < LU L11 v C(] l.0 � ~ z V ai! D LU z Cz �, OIL C (3 LA .4 Nz 1JJ fY LA 13 > W ILog D Q O -13 °- LA0 W OL 3? < < L11 C) LLI SHEET TITLE 51RUCTA& DETAILS G53 13 • S;I D ai! D Cz z C 5� Nz m M M O D I D o � Z rr+ I � I D `:;