HomeMy WebLinkAboutR-384752w � a
N�
W
Q
cn
o
z
E-4
2P-200 AMP
---
W
n
w
ILLUM B
cn
N
o
ILLUM C
m
\
a
ILLUM D (SPARE)
cn
C
C
n
1"r- im im
77 w
0 Q
77
Q
(0 00
10M
00
z z
z z
00
Fn 60
W Lj
ILLUMINATION GENERAL NOTES
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY
DEPARTMENT, CURRENT EDITION AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON-SITE AT ALL TIMES DURING CONSTRUCTION.
2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE
APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911
SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. FOR UTILITY LOCATE CALL 48-HOUR
LOCATORS, 1-800-424-5555.
4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF
WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95X MAXIMUM DRY DENSITY MODIFIED PROCTOR.
10. THE CONTRACTOR SHALL PROVIDE MATERIALS SUBMITTALS AND POLE SHOP DRAWINGS TO THE CITY OF RENTON FOR APPROVAL
MINIMUM 3 WEEKS PRIOR TO THE DESIRED APPROVAL DATE.
SERVICE 1 BREAKER SCHEDULE
CIRCUIT
BREAKER
z
MAIN
2P-200 AMP
---
ILLUM A
2P-20 AMP
30 AMP
1"r- im im
77 w
0 Q
77
Q
(0 00
10M
00
z z
z z
00
Fn 60
W Lj
ILLUMINATION GENERAL NOTES
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY
DEPARTMENT, CURRENT EDITION AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS. A SET OF
APPROVED PLANS SHALL BE KEPT ON-SITE AT ALL TIMES DURING CONSTRUCTION.
2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8:30 AM TO 3:30 P.M. ON WEEKDAYS UNLESS
OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS. ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE
APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911
SHALL BE NOTIFIED 24 HOURS IN ADVANCE.
3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. FOR UTILITY LOCATE CALL 48-HOUR
LOCATORS, 1-800-424-5555.
4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION.
(INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF
WORKERS AND OTHERS ON THE CONSTRUCTION SITE.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95X MAXIMUM DRY DENSITY MODIFIED PROCTOR.
10. THE CONTRACTOR SHALL PROVIDE MATERIALS SUBMITTALS AND POLE SHOP DRAWINGS TO THE CITY OF RENTON FOR APPROVAL
MINIMUM 3 WEEKS PRIOR TO THE DESIRED APPROVAL DATE.
SERVICE 1 BREAKER SCHEDULE
CIRCUIT
BREAKER
CONTACTOR
MAIN
2P-200 AMP
---
ILLUM A
2P-20 AMP
30 AMP
ILLUM B
2P-20 AMP
30 AMP
ILLUM C
2P-20 AMP
30 AMP
ILLUM D (SPARE)
2P-20 AMP
30 AMP
SIGNAL
2P-20 AMP
30 AMP
SERVICE 2 BREAKER SCHEDULE
CIRCUIT
BREAKER
CONTACTOR
MAIN
2P-200 AMP
- - -
ILLUM A
2P-20 AMP
30 AMP
ILLUM B
2P-20 AMP
30 AMP
ILLUM C
2P-20 AMP
30 AMP
ILLUM D (SPARE)
2P-20 AMP
30 AMP
11. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED
TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH OVERHEAD
POWER LINES
OR SUBSURFACE UTILITIES. HOWEVER,
IT IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE
PRIOR TO IMPLEMENTATION OF THE SCOPE OF WORK
IDENTIFIED ON
THESE DOCUMENTS. AS THE FIRST ORDER OF BUSINESS. THE
CONTRACTOR
SHALL POTHOLE EACHP T
TO CONFIRMTHAT
THERE ARE NOT CONFLICTS WITHUTILITI
WAS
61 :�
ADDITIONALLY,
THE CONTRACTOR SHALL CONFIRM THAT THERE IS A
MINIMUM 10 -FT CLEARANCE PROVIDED BETWEEN OVERHEAD
ILLUMINATION WIRING DIAGRAM
POWER LINES
AND THE PROPOSED LUMINAIRE POLES
PRIOR TO POLE PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS
0,�: ,
DIRECTED BY
THE UTILITY. THE CONTRACTOR SHALL
CONTACT THE
ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED.
12. CONTRACTOR SHALL RESTORE ALL GROUNDS DISTURBED BY CONDUIT AND ILLUMINATION SYSTEM INSTALLATION, INCLUDING BUT NOT
LI MI TED TO: LANDSCAPING, IRRIGATION, CONCRETE SIDEWALKS, ETC.
13. EXISTING ILLUMINATION SYSTEM SHALL REMAIN OPERATIONAL UNTIL SUCH TIME THAT NEW ILLUMINATION SYSTEM IS OPERATIONAL.
MAXIMUM DOWN TIME FOR SWITCHOVER TO THE NEW SYSTEM SHALL BE 24 HOURS.
ILLUMINATION CONSTRUCTION NOTES
OINSTALL FOUNDATION, POLE, TWO LUMINAIRES, AND JUNCTION BOX PER ILLUMINATION POLE SCHEDULE, SHEET IL 1.06, AND PER CITY
OF RENTON STANDARD PLANS 117.1., 117.3,9 119t 120, 121, & J013.
O INSTALL FOUNDATION, POLE, LUMINAIRE, AND JUNCTION BOX PER ILLUMINATION POLE SCHEDULE, SHEET IL 1.06, AND PER CITY OF
RENTON STANDARD PLANS 117.2
, 1 17.3, 119, 120, & 121 & JO 13.
OINSTALL FOUNDATION AND JUNCTION BOX PER ILLUMINATION POLE SCHEDULE, SHEET IL 1.06, AND PER CITY OF RENTON STANDARD
PLANS 115, 119, 120, 121 & J013 AND WSDOT STANDARD PLAN J-28.30. RELOCATE EXISTING ILLUMINATION POLE TO NEW
FOUNDATION. CONTRACTOR SHALL VERIFY BOLT PATTER PRIOR TO POURING FOUNDATION.
OINSTALL FOUNDATION, POLE, LUMINAIRE, AND JUNCTION BOX PER ILLUMINATION POLE SCHEDULE, SHEET IL 1.06, AND PER CITY OF
RENTON STANDARD PLANS 1 17.1, 1 17.3, 119, 120, 121, & J013.
OPOWER SOURCE CONNECTION POINT UNKNOWN AT THE TIME OF PLAN PREPARATION. CONTRACTOR SHALL ASSUME APPROXIMATELY
500 FEET OF TRENCHING TO POWER SOURCE. CONTRACTOR SHALL COORDINATE WITH PSE FOR SPECIFIC REQUIREMENTS. PSE TO
PROVIDE 120/240 VOLT SINGLE PHASE POWER SOURCE. CONTRACTOR SHALL COORDINATE WITH PSE'S TRANSPORTATION'S MAINT. <
ASST. MANAGER (ERIC CUTSHALL) AT 425-430-7423 FOR SERVICE CABINET ELECTRICAL HOOK-UP, SHALL PREPARE/SUBMIT ALL
APPLICABLE PERMITS,_ AND SHALL PAY ALL ASSOCIATED FEES. J
OCONSTRUCT STREET LIGHT CONTACTOR FOUNDATION PER CITY OF RENTON STD PLANS 126.1 AND 126.2. FURNISH AND INSTALL
SERVICE CABINET PER CITY OF RENTON STD PLAN 122.1. LOCATION AND ORIENTATION OF FOUNDATION AND CABINET SHALL BE
VERIFIED BY CITY OF RENTON INSPECTOR PRIOR TO INSTALLATION OF CONDUITS.
OCONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT AND CONDUCTORS TO THE POWER SOURCE. POWER SOURCE FOR NEW
SERVICE CABINET SHALL BE FROM THE SAME SOURCE THE EXISTING/REMOVED SERVICE CABINET DRAWS POWER FROM. CONTRACTOR
SHALL LEAVE SUFFICIENT SLACK IN CONDUCTOR FOR FINAL CONNECTION. CONTRACTOR SHALL COORDINATE WITH PSE FOR SERVICE
CABINET ELECTRICAL HOOK-UP, SHALL PREPARE/SUBMIT ALL APPLICABLE PERMITS, AND SHALL PAY ALL ASSOCIATED FEES.
8O REMOVE EXISTING SERVICE CABINET AND FOUNDATION. FILL AND COMPACT VOID.
OREMOVE EXISTING TYPE Ill SIGNAL STANDARD. REMOVE EXISTING FOUNDATION TO A MINIMUM OF 24" BELOW FINISH GRADE. RETURN
SALVAGED POLE TO THE CITY OF RENTON.
10 SPLICE NEW ILLUMINATION CONDUCTORS TO EXISTING ILLUMINATION CONDUCTORS IN EXISTING JUNCTION BOX PER CITY OF RENTON
STANDARD PLAN J013.
INTERCEPT AND EXTEND EXISTING CONDUIT TO NEW JUNCTION BOX. SPLICE NEW ILLUMINATION CONDUCTORS TO EXISTING
ILLUMINATION CONDUCTORS PER CITY OF RENTON STANDARD PUN J013.
12 REMOVE EXISTING JUNCTION BOX. REPLACE WITH NEW TRAFFIC BEARING JUNCTION BOX TYPE 4 PER WSDOT STANDARD PUN
J-40.20-02. JUNCTION BOX SHALL HAVE SKID RESISTANT LID.
13 RELOCATE EXISTING STREET LIGHT POLE, ARM AND LUMINAIRE TO NEW FOUNDATION AT LOCATION SHOWN. REMOVE EXISTING
FOUNDATION TO A MINIMUM OF 24" BELOW FINISH GRADE. FILL AND COMPACT VOID.
14 RELOCATE EXISTING STREET LIGHT POLE, ARM AND LUMINAIRE TO NEW FOUNDATION ON SW 43RD STREET (SEE POLE ID 'RB', STA.
29+51.5, 34.0' RT). REMOVE FOUNDATION. FILL AND COMPACT VOID. SEE ILLUMINATION CONSTRUCTION NOTE 19.
15 REMOVE EXISTING JUNCTION BOX. FILL AND COMPACT VOID.
� 6 REMOVE EXISTING JUNCTION BOX AND CONCRETE PAD. FILL AND COMPACT VOIDS.
REMOVE EXISTING CONDUCTORS. ABANDON EXISTING CONDUIT.
18 EXISTING STREET LIGHT POLE TO REMAIN. PROTECT DURING CONSTRUCTION.
19 RELOCATED FROM LIND AVE SW. SEE ILLUMINATION CONSTRUCTION NOTE 14.
20 EXISTING SERVICE CABINET TO REMAIN. PROTECT DURING CONSTRUCTION.
DAMM
CITY OF RENTON, NAVD 88
Approved by:
®ENCHk%W-'
CITY OF RENTON CONTROL Approved by:
POINT NO. 1864 WAS HELD Approved by:
FOR ELEVATION, BEING
19.488 FEET (NAVD88) Approved by:
CIRCUIT
CONTINUES ON
SW 41 ST ST
SW 41ST ST
TO EX SERVICE CABINET
AT SE CORNER OF SW
41 ST ST AND
LIND A VE SW
1
�1
RA IRB
CITY STANDAMS
DateAAMI
Date
Date
Date
CITY OF RENTON
E>EPAR'7"wAENT OF r1.JiL_IC W017KS
FfIONTA LLU~TM FLAN
WTES AND DETAILS
RVTENW
CEA REDEVELOPMENT RENTON, WA.
Transportation Engineering NorthWest TDR
Transportation Planning I Design I Traffic Impact & Operations DA -M 08/10/2015 KA NO. U 1 500 1 266
pRVM TDR
OM�i01� GMD FILD F*Aw
7 orr�c oR oft warns a1�lT cr io
T�
�? D •
ISM
Uwr4LK f UtvtLUrtrc:
re 43�
IKEA PROPERTY INC
NER r
420 ALAN WOOD ROAD
��
CONSHOHOCKEN, PA 19428
.•..•••••••..;
WAS
61 :�
CONTACT: DWIGHT E. SLATON
M
M
CONSTRUCTION MANAGER
• '`�
D'
W
P: (610) 834-0180; C: 303-549-4623
0,�: ,
2
5 : ��
E: QWW T. SLAjQh j%U. C0M
FKGNtFR:
FS; :�.c/ TEQ;.• G�
S/. •
TRAWSPORTATION ENGINEERING NORTHWEST
11400 SE 8TH STREET, SUITE 200
BELLEVUE, WA 98004
41 .41;f6y
CONTACT: GLEN Du9REUIL
P: (425) 250-0582; C: (206) 295-6776
E:
CITY OF RENTON
E>EPAR'7"wAENT OF r1.JiL_IC W017KS
FfIONTA LLU~TM FLAN
WTES AND DETAILS
RVTENW
CEA REDEVELOPMENT RENTON, WA.
Transportation Engineering NorthWest TDR
Transportation Planning I Design I Traffic Impact & Operations DA -M 08/10/2015 KA NO. U 1 500 1 266
pRVM TDR
OM�i01� GMD FILD F*Aw
7 orr�c oR oft warns a1�lT cr io
T�
�? D •
ISM
°gym
re 43�
Z
C
bid
ob
i Nz
m
M
M
9
1
m
E
n
8
oho
52
o �+
o
Cnt7l
bid
ob
1
a
1
m
E
n
8
oho
52
o
Cnt7l
CD
Ln
1
m
w
y
E
n
8
oho
52