HomeMy WebLinkAboutRES 2280 CITY OF RENTON, WASHINGTON
RESOLUTION NO. 2280
WHEREAS the City of Renton has heretofore adopted a "Six-Year
Transportation Improvement Program", pursuant to Chapter 7, Extraordinary
Session Laws of 1961 of the State of Washington, and Chapter 195 of the 1961
Session Laws of the State of Washington, and as same has heretofore been
amended from time to time, and such plan and program having heretofore been
duly amended and modified from time to time as authorized by law, and
WHEREAS the City Council , after recommendation of its Public Works
Department , caused to be held a public hearing thereon on June 18, 1979,
after notice to the public as provided by law, for the purpose of considering
adoption, modification and amendments of said plan and program, and
WHEREAS at such public hearing held on June 18, 1979, due considera-
tion was given to the proposed changes and amendments for the purpose of up-
dating such plan and program, NOW THEREFORE THE CITY COUNCIL OF THE CITY OF
RENTON DO RESOLVE AS FOLLOWS:
SECTION l : The City's"Six-Year Transportation Improvement Program"
and the City's "Arterial Street Plan" are hereby further amended and modified,
all as more particularly shown on the attached Exhibits, entitled"Exhibit A",
"Exhibit B", and "Exhibit C", and same being incorporated herein as if fully
set forth.
SECTION II : The aforestated plan and program, as evidenced by said
Exhibits shall be and constitute the City's "Six-Year Transportation Improve-
ment Program" and the City's "Arterial Street Plan" and same to remain in full
force and effect until further revised , amended and modified as provided by law.
SECTION III : The Director of Public Works and the City Clerk are
hereby authorized and directed to file this Resolution together with Exhibits,
- 1 -
•
with the Director of Highway for the State of Washington, and as otherwise
provided by law.
PASSED BY THE CITY COUNCIL this 25 day of June, 1979
Maxine E.<='Mo't_or, Deputy City Clerk
APPROVED BY THE MAYOR this 25 day of Jure,, 1979
Charles yrIe1aurenti , Mayor
Approved as to form:
01P:(-24A."4
Lawrence J. Warren, City Attorney
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 Page 1 of 9
"
City/County RENTON — OBLIGATION PROGRAM — "EXHIBITHearing Date June 18, 1979"
No. 1070 Hearing AAdoption Date June 25, 1979
17 MAJOR (PRINCIPAL) ARTERIALS
County No. Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
•
PROJECT IDENTIFICATION _g Y Total o I L OBLIGATION SCHEDULE FUNDING SOURCE
= Title, Route, Road Log No., Section No., " 3 Work sg > >: YEAR TOTAL
S o.
Length
o Location/Termini, Description of Work, .�o Code c" � `Q FEDERAL FUNDS
Beginning Milepost a Bridge No. (MHeel 'L , o0- 1st 2nd 3rd 4,5 8r 6th UAB LOCAL
v ANNUAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) ( 1 AMOUNT PROGRAM
\ELEMENT/
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
1 SW 43rd Street - E Valley Rd. to W Valley Rd. (joint 2 A,C,D, 1 .25 M U 3,000 2,500 900 FAS 2,964 1 ,636 5,500
project with City of Kent) . Grading, drainage, 5 E,F,G,
paving, curbs, sidewalk, illumination, signalization, 7 H, I ,N
bike route, landscaping, bridge, widen to 56' (with
L. I .D. and P-1 drainage) .
2 NE 4th Street - Monroe Ave. NE to Union Ave. NE. 3 B,C,D, 0.45 M U 200 200 200
Widen roadway to 52' (two-way left turn lane) (with 6 F,G,H
100% L. I .D.)
3 Sunset Blvd. North - Bronson Way North to F.A. I . 405. 2 C,D,E, 0.50 M U 648 430 FADS 218 648
Drainage, paving, curbs, sidewalk, signal , illumin- 5 F,G
ation, channelization, widen to 68' (with 20% L. I .0.) . 6
4 Valley" Parkway SW - SW 43rd St. to SW 16th St. 1 A,C,D, 1 .7 M U 2,500 2,500 830 REGIONAL 4,170 5,000
(Phase I) . Grading, drainage, paving, curbs, side- 6 E,F,G, FAUS
walk, illumination, signal , bike route, channel- 7 H, I ,N
ization, landscaping, bridge, 56' roadway (with 80% 8
L. I .D. ) . P.S.C.O.G. No. 287902
5 Valley"' Parkway SW - SW 16th St. to SW Grady Way 1 A,C,D, 0. 1 M U 4,500 2,987 REGIONAL 1 ,513 4,500
(Phase II) . Grading, drainage, paving, curbs, side- 6 E,F,G, FAUS
walks, illumination, signal , bike route, channel- 7 H, I ,N
ization, landscaping, bridge, 66' roadway (with 20% 8
L. I .D.) .
"'Formerly "Longacres Parkway"
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER.
T 140-019 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
PR1L 1979 1 COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to 1985 Page 2 of 9
City/County RENTON — OBLIGATION PROGRAM — Hearing Date June 18, 1979
City No. 1070
"EXHIBIT A" Adoption Date June 25, 1979
County No. 17 MAJOR (PRINCIPAL) ARTERIALS Resolution Number 2280 '
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION I . 8 OBLIGATION SCHEDULE FUNDING SOURCE
Total c TOTAL
Title, Route, Road Log No., Section No., ; Work Length a IA.; YEAR FUNDS
I Location/Termini, Description of Work, . Coda e� FEDERAL
Beginning Milepost a Bridge No. k (Miss) 12 ; �d Ist 2nd 3rd 4,5 e 6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) \e EMENT), AMOUNT PROGRAM
I 2 3 4 , 5 _ 6 ,7 8 9 10 II 12 13 14 15 16 17
•
6 Valley" Parkway SW - SW Grady Way to S 140th St. 1 A,C,D, 1 .0 M U 4,000 2,074 REGIONAL 2,926 5,000
(Phase III) (North city limit) . Grading, drainage, 6 E,F,G, FAUS
paving, curbs, sidewalk, illumination, signal , bike 7 H, I ,N
route, channelization, landscaping, bridge, 56' 8
roadway (RR undercrossing) (with 50% L. I .D.)
7 Valley': Parkway SW - S 140th St. to SW Sunset Blvd. 1 A,C,D, 0.6 M U
(Phase IV) (King County project) . Grading, drainage, 6
E F
paving, curbs, sidewalk, illumination, channelization
landscaping, 56' roadway.
8 SR 515 Phase II (Benson Dr. S) - S Puget Dr. to S 1 D,E,F, 1 .06 M U 250 250 250
31st St. (South city limit) . State D.O.T. Project - 6 G
construct new roadway. City participation: sidewalk,
curbs, signalization, illumination, channelization.
"Formerly "Longacres Parkway"
r
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
1 'oT 140-04$ I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
PRIG ias I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 Page 3 of 9
City/County RENTON — OBLIGATION PROGRAM — "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979
County No. $7 SECONDARY (MINOR) ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS -
PROJECT IDENTIFICATION $ " Total o . -- OBLIGATION SCHEDULE FUNDING SOURCE
i Title, Route, Rood Log No., Section No., ; Work TotLenal o tit YEAR TOTAL
1 Locotion/Termini, Description of Work, t.. Cods c FEDERAL
z Beginning Milepost 9 Bridge No. ° (Mtlltt) 'i ; ail ( ANNUAL 1st 2nd 3rd 4,5 a 6th UAB LOCAL FUNDS
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) J lEMENT/ AMOUNT PROGRAM
_ _
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
1 Misc. street repairs and improvements - to be identi- S U 10 10 10
fied on prospectus and in Street Division 5-Year Plan.
2 North 30th Street - Burnett Ave. N to F.A. I . 405. 2 A,C,D, 0.4 S U 500 207 FAUS 293 500
Drainage, paving, curbs, sidewalk, channelization, 5 E,F
44' roadway (with 50% L. I .D.) . 6
3 Union Ave. NE - NE Sunset Blvd. to NE 24th St. (North 2 A,C,D, 0.7 S U 400 166 FAUS 234 400
city limit) . Drainage, paving, curbs, sidewalk, 5 E,F .
channelization, 44' roadway (with 50% L. I .D.) . 6
4 Shattuck Ave. South - S 4th P1 . to S 7th St. Grading, 2 A,C,D, 0.23 S U 1 ,000 600 1 ,328 FAUS 272 1 ,600
drainage, paving, curbs, sidewalk, illuminaition, 6 E,F,H
channelization, bridge, 44' roadway. 7
5 Shattuck Ave. South - S 7th St. to S Grady Way. 1 A,C,D, 0.06 S U �5 25 25
State D.O.T. project - Park & Ride Lot - construct 6 E,F,G
new roadway. City participation: Grading, drainage,
paving, curbs, sidewalk, illumination, signalization,
channelization, 44' roadway.
6 South Puget Drive & Benson Road South - intersection 2 B,D,F, S U 50 41 FAUS 9 50
improvements. Drainage, paving, curbs, sidewalk, 6 G,H, I
signalization, channelization (carry over project) .
7 SW 27th Street - E Valley Rd. to Valley Parkway SW. 1 A,C,D, 0.68 S U 2,000 332 REGIONAL 1 ,668 2,000 .
Grading, drainage, paving, curbs, sidewalk, illumin- 6 E,F,G, FAUS .
ation, signal , bike route, channelization, land- 7 H, I ,N
scaping, bridge, 44' roadway (Phase I with 80% L. I .D.) 8
_ P.S.C.O.G. No. 287903 .
DISTRIBUTION •
I COPY DISTRICT STATE AID ENGINEER
iso-opt I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
;IL144449 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 - Page 4 of 9
City/County RENTON — OBLIGATION PROGRAM — "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979 ,
County No. 17 SECONDARY (MINOR) ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS •
PROJECT IDENTIFICATION o : Total o OBLIGATION SCHEDULE FUNDING SOURCE
z Title, Route, Road Log No., Section No., 0 3 Work s S D ;6 YEAR - - TOTAL
E Location/Termini, Description of Work, Length v ;•� FUNDS
po .- Code co o FEDERAL
Beginning Milepost a Bridge No. 1 O (Mlles) �" to- Ist 2nd 3rd 4,5&.6th UAB LOCAL
— (PLEASE DOUBLE SPACE BETWEEN PROJECTS) - �E ELEMENT)
AMOUNT ANNUALPROGRAM
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 I7
8 SW 27th Street - Valley Parkway SW to W Valley Rd. 1 A,C,D, 0.53 S U 2,000 1 ,328 REGIONAL 672 2,000
Grading, drainage, paving, curbs, sidewalk, illumin- 6 E,F,G, FADS
ation, signal , bike route, channelization, landscaping 8 I ,N
44' roadway (Phase II with 20% L. I .D.) RR undercrossing
9 Wells Ave. Bridge - and approaches 7 A,B,J, 0.04 S U 1 ,400 1 , 120 BRIDGE 280 1 ,400
Bridge replacement. L REPLACE.
10 SW Grady Way Bridge - Longacres Dr. SW to W Valley Rd. 7 A,B,J, 0.5 S U 2,500 2,500 4,000 BRIDGE 1 ,000 5,000
(joint project with Tukwila) . Bridge replacement. L REPLACE.
11 SW Grady Way - Lind Ave. SW to Longacres Dr. SW. 2 A,C,D, 0.7 S U 1 ,050 456 FAUS 594 1 ,050
Drainage, paving, curbs, sidewalk, illumination, 5 E,F,H
channelization, P-I bridge, 44' roadway (with 500 6
L. I .D.) . 7
12 S Puget Dr. & SE Puget Dr. - Benson Rd. S to SE Jones 2 A,C,D, 0.34 S U 500 42 FAUS 458 500
P1 . Drainage, paving, curbs, sidewalk, illumination, 5 F,G,H,
channelization, 56' roadway (with 90% L. I .D.) . 6 J
13 SE Puget Dr. - SE Jones P1 . to Edmonds Ave. SE. 2 A,C,D, 0.78 S U 800 664 FAUS 136 800
Drainage, paving, curbs, sidewalk, illumination, 5 F,G,H,
channelization, 44' roadway 6 J
14 Lake Washington Blvd. North - N Park Dr. to NE 51st 2 A,C,D, 3.03 S U 3,500 2,178 FAUS 1 ,322 3,500
St. (North city limit) . Drainage, paving, curbs, 5 E,F,H
sidewalk, illumination, channelization (with 25% 6
L. I .0.) .
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER '
DOT 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
APRIL 1979 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9a_Q to 1985 Page 5 of 9
City/County RENTON — OBLIGATION PROGRAM — Hearing Date June 18, 1979 -
City No. 1070 "EXHIBIT A" Adoption Date June 25, 1979
County No. 17 SECONDARY (MINOR) ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS -
PROJECT IDENTIFICATION ; : Tocol a OBLIGATION SCHEDULE FUNDING SOURCE
z Title, Route, Road Log No., Section No., 0 3 Work °: Tr, YEAR TOTAL
E Location/Termini, Description of Work Length v " o•- FUNDS
P , o w Code co :o FEDERAL
Beginning Milepost 81 Bridge No. - O (Miles) o va IS( 2nd 3rd 4,5 a 6th _ UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELEMENT) AMOUNT PROGRAM
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
15 Garden Ave. North - N 4th St. to N 8th St. Drainage, 2 A,C,D, 0.5 S U 250 250 250
paving, curbs, sidewalk, channelization, 44' roadway 5 E,F
(with 75% L. I .D.) . 6
16 Lind Ave. SW - SW 16th St. to SW Grady Way. Drainage, 2 A,C,D, 0.2 S U 1 ,000 900 FAI 100 1 ,000
paving, curbs, sidewalk, illumination, signal , 5 E,F,G,
channelization, bike route, landscaping, FAI 405 6 H, I ,N
bridge, 44' roadway (with 10% L. I .D.) . 7
8
17 Sunset Blvd. NE - F.A. I . 405 to NE Park Dr. Drainage, 2 A,C,D, 0.9 S U 1 ,250 519 FAUS 731 1 ,250
paving, curbs, sidewalk, channelization (with 50% 5 E,F
L. I .D.) . 6
18 Benson Road South - S Grady Way to SE 31st St. 2 A,C,D, 1 .8 S U 2,000 830 FAUS 1 , 170 2,000
(South city limit) . Drainage, paving, curbs, side- 5 E,F,H
walk, channelization, bridge (with 50% L. I .D.) . 6
7
19 South 7th Street - Rainier Ave. S to Smithers Ave. S. 2 A,C,D, 0.5 S U 200 149 FAUS 51 200
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (with 10% L. I .D.) . 6
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
oat 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
APRIL 1979 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1980 to 1985 Page 6 of 9 .
Cit /Count RENTON "EXHIBIT A" Hearing Date June 18, 1979 -
City/County — OBLIGATION PROGRAM —
City No. 1070 Adoption Date June 25, 1979
County No. 17 COLLECTOR ARTERIALS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
r
PROJECT IDENTIFICATION o Total a 3 OBLIGATION SCHEDULE FUNDING SOURCE
z Title, Route, Road Log No., Section No., 0 '' Work ;m YEAR -. TOTAL
Length �s T— FUNDS
E Location/Termini, Description of Work, c ,. Code d� 2 FEDERAL
Beginning Milepost a Bridge No. Ti O (Miles) 5 tea- 1st 2nd 3rd 4,5 8 6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) _ ( ANNUAL EM NT) AMOUNT PROGRAM
I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17
1 Misc. street repairs and improvements - to be identi- C U 10 10 10
fied on prospectus and in Street Division 5-Year Plan.
2 Talbot Road South - S 16th St. to S 43rd St. (South 2 A,C,D, 1 .8 C U 500 207 FAUS 293 500
City Limits) . Drainage, paving, curbs, sidewalk, 5 E,F
illumination, channelization (joint project with King 6
County) (with 50% L. I .D.) .
3 SW 16th Street - East Valley Road to Monster Road SW. 2 A,C,D, 0.9 C U 800 800 800
Drainage, paving, curbs, sidewalk, illumination, 6 E,F,H
channelization, bridge, 44' roadway (100% L. I .D.) . 7
4 East Valley Road - SW 16th St. to SR-167 Ramps. 2 A,C,D, 1 .6 C U 2,000 2,000 2,000
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (100% L. I .D.) . 6
5 NE 12th Street - Edmonds Ave. NE to Union Ave. NE. 2 A,C,D, 1 .0 C U 1 ,320 548 FAUS 772 1 ,320
Drainage, paving, curbs, sidewalk, illumination, 5 E,F
channelization, 44' roadway (with 50% L. I .D.) . 6
6 Taylor Ave. NW & Taylor Place NW - Renton Ave. Ext. 2 A,C,D, 0.6 C U 600 373 FAUS 227 600
to Stevens Ave. NW. Drainage, paving, curbs, side- 5 E,F
walk, illumination, channelization, 44' roadway (with 6
25% L. I .D.) .
7 Monroe Ave. NE - NE 4th St. to NE 12th St. Drainage, 2 A,C,D, 1 .0 C U 1 ,320 548 FAUS 772 1 ,320
paving, curbs, sidewalk, illumination, channelization, 5 E,F
44' roadway (with 50% L. I .D.) . 6
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
DOT 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
APRIL 1979 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to !985 Page 7 of 9
•
City/County RENTON — OBLIGATION PROGRAM -- "EXHIBIT A" Hearing Date June 18, 1979
City No. 1070 Adoption Date June 25, 1979
County No. 17 COLLECTOR ARTERIALSResolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION o . Total o 8 -8 OBLIGATION SCHEDULE FUNDING SOURCE
Title, Route, Road Log No., Section No., " 3 Work Length §1 It YEAR TOTAL
i Location/Termini, Description of Work, Cods co FEDERAL FUNDS
Beginning Milepost & Bridge No. ° (Miles) a_. ii ANNUAL 2nd 3rd 4,5 a 6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) (ELEMENT) AMOUNT PROGRAM
1 2 34 5 _ 6 7 8 . 9 10 II 12 _ 13 14 15 16 17
8 Burnett Ave. N - Lk. Wash. Blvd. (S Term.) to Lk. 2 A,C,D, 0.6 C U 792 329 FAUS 463 792
Wash. Blvd. (N Term) . Drainage, paving, curbs, side- 5 E,F
walk, illumination, channelization, 44' roadway (with 6
' 50% L. I .D.) .
9 Aberdeen Ave. NE - Sunset Blvd. NE to NE 27th St. 2 A,C,D, 1 .3 C U 1 ,500 622 FAUS 878 1 ,500
Drainage, paving, curbs, sidewalk, illumination, 6 E,F,H
channelization, bridge, 44' roadway (with 50% L. I .D.) 7
10 Park Ave. North & North 40th Street - N 30th St. to 2 A,C,D, 0.4 C U 500 207 FAUS 293 500
Lk. Wash. Blvd. N. Drainage, paving, curbs, sidewalk, 5 E,F
illumination, channelization, 44' roadway (with 50% 6
L. I .D.) .
11 Monroe Ave. NE - NE 2nd St. to NE 4th St. Drainage, 1 A,B,D, 0.28 C U 370 307 FAUS 63 370
paving, curbs, sidewalks, illumination, channelization 6 F,G,H, (COUNTY) (COUNTY)
44' roadway (joint project with King County) . J
j. DISTRIBUTION .
} I COPY DISTRICT STATE AID ENGINEER
c3pT 140-049 I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
I ANAL n» I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 19$Q to 1985 Page 8 of 9
RENTON — OBLIGATION PROGRAM — " A" Hearing Dote June 18, 1979
City/County EXHIBIT B I T .
City No. 1070 Adoption Date June 25, 1979
County No. 17 SPOT IMPROVEMENTS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION 8 Y Total o I 2 OBLIGATION SCHEDULE FUNDING SOURCE
Title, Route, Road Log No, Section No. ; Work , i 10 TOTAL
I Locoion/Terini, Description of Work, r . Cods
Length c_ g..! YEAR FEDERAL FUNDS
Beginning Milepost & Bridge No. 0 (Melee) `a- 1st 2nd 3rd 4,5 e3 6th DAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) %ELEMENT AMOUNT PROGRAM
I
-
1 2 3 4 5 6 7 8 9 10 II 12 13 14 _ 15 16 17
1 Monster Road SW - alternate access road (due to 1 A,C,D, U 210 130 FASP 80 210
closure of railroad crossing) 6 E,F
2 SW 7th St. & Hardie Ave. SW - intersection improve- 3 B,C,D, U 90 90 90
ments. Drainage, paving, curbs, signal , street 6 F,H, I ,
lighting and channelization (with 25% L. I .D.) . J
3 Renton Area Transportation Study (joint project - 100 90 HPR 10 100
State Department of Transportation) (STATE)
1
DISTRIBUTION
I COPY DISTRICT STATE AID ENGINEER
u T I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
n�ko.14411 I COPY C.R.A.B. (COUNTIES ONLY)
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM I9$Q to 1985 Page 9 of 9
City/County RENTON — OBLIGATION PROGRAM — Hearing Date June 18, 1979
"EXHIBIT A" •
City No. 1070 Adoption Date June 25, 1979
County No. 17 LOCAL ACCESS STREETS Resolution Number 2280
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT IDENTIFICATION : . a j 8. OBLIGATION SCHEDULE FUNDING SOURCE
s b Total TOTAL
1 Title, Route, Road Loy No., Section No., 0 x Work L.nSth I8 t t 02,
YEAR
€ Location/Termini, Description of Work, Code CO to,_ - FEDERAL FUNDS
f Beginning Milepost A Bridge No. (MtI•.) c�� ANNUAL 1 2nd 3rd 4,5 Q.6th UAB LOCAL
(PLEASE DOUBLE SPACE BETWEEN PROJECTS) ELEMENT/, --\ AMOUNT PROGRAM
2 3 4 5 6 7 8 9 IC) II 12 13 14 15 16 17
1 Misc. street repairs and improvements - to be identi- A U 71 71 71
fied on prospectus and in Street Division 5-Year Plan. •
2 North 1st Street - Park Ave. North to Burnett Ave. 2 B,C,F, 0.2 A U 150 150 150
North. Drainage, paving, channelization. 6 H
3 Renton Ave. South - S 3rd St. to S 10th St. Drainage, 2 A,C,D, 0.5 A U 350 217 FAUS Y33 350
paving, curbs, sidewalk, illumination (with 25% 6 E,F
L. I .D.) .
1
DISTRIBUTION .
I COPY DISTRICT STATE AID ENGINEER
1=1.14444. I COPY CHAIRMAN, URBAN ARTERIAL BOARD, OLYMPIA
NI COPY C.R.A.B. (COUNTIES ONLY)